Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148D765 + (17:00:07, 11 December 2024)
- ML20148D761 + (17:00:07, 11 December 2024)
- ML20148D757 + (17:00:08, 11 December 2024)
- ML20148D751 + (17:00:09, 11 December 2024)
- ML20148D746 + (17:00:10, 11 December 2024)
- ML20148D741 + (17:00:11, 11 December 2024)
- ML20148D737 + (17:00:13, 11 December 2024)
- PNO-II-80-114, on 800623,stop Work Order Was Issued for Earthfill Placement Around Emergency Raw Cooling Water Spray Pond.Order Was Issued Because of Region 2 Concerns Re Performance of QC Program.Immediate Action Ltr to Be Issued + (17:00:14, 11 December 2024)
- ML20148D734 + (17:00:14, 11 December 2024)
- ML20148D731 + (17:00:15, 11 December 2024)
- PNO-III-80-163, on 800903,two FBI Agents Plan Site Visit Re Grand Jury Probe of Improper Reporting & Repair of Concrete Imperfections.Region 3 Resident Inspector Will Accompany Agents During Visit + (17:00:15, 11 December 2024)
- PNO-III-80-170, on 800904,efforts to Remove Bolts from Steam Generator Upper Supports Resulted in Breaking Two Bolts. Ultrasonic Examination of All of Bolts Identified Addl Defects.Cause Could Be Stress Corrosion Cracking + (17:00:16, 11 December 2024)
- ML20148D727 + (17:00:17, 11 December 2024)
- PNO-III-80-169A, since 800905,extensive Investigations by Region 3 & Util Personnel Into Allegations of Radioactive Release Has Not Determined Whether Actual Release of Low Level Radioactive Water Occurred + (17:00:19, 11 December 2024)
- PNO-III-80-164, on 800902,licensee Found Leakage from 10-inch Core Spray Piping Inside Drywell.Two Welds in a Loop Have Seepage & One Weld in B Loop Has Visible Crack.Unit Is in Refueling Outage + (17:00:19, 11 December 2024)
- ML20148D722 + (17:00:21, 11 December 2024)
- PNO-III-80-164A, on 800919,no Addl Cracking in Core Spray Piping Has Been Identified Other than Pipe Cracks Previously Identified.Licensee Intends to Replace Defective Piping Elbows W/Different Matl + (17:00:22, 11 December 2024)
- ML20148D721 + (17:00:22, 11 December 2024)
- ML20148D716 + (17:00:23, 11 December 2024)
- ML20148D714 + (17:00:24, 11 December 2024)
- ML20148D713 + (17:00:24, 11 December 2024)
- ML20148D709 + (17:00:25, 11 December 2024)
- PNO-III-80-166, on 800903,unit Tripped from 93% Power Due to Low Steam Generator Level,Caused by Feedwater Pump Trip. Water Hammer Occurred While Steam Generator Level Was Below Feed Ring Causing Safety Injection Actuation + (17:00:25, 11 December 2024)
- ML20148D707 + (17:00:26, 11 December 2024)
- ML20148D706 + (17:00:27, 11 December 2024)
- IR 05000458/1997006 + (17:00:28, 11 December 2024)
- ML20148D702 + (17:00:29, 11 December 2024)
- ML20148D700 + (17:00:30, 11 December 2024)
- ML20148D697 + (17:00:31, 11 December 2024)
- ML20148D691 + (17:00:32, 11 December 2024)
- ML20148D694 + (17:00:32, 11 December 2024)
- ML20148D686 + (17:00:33, 11 December 2024)
- ML20148D690 + (17:00:33, 11 December 2024)
- ML20148D685 + (17:00:34, 11 December 2024)
- ML20148D684 + (17:00:35, 11 December 2024)
- ML20148D682 + (17:00:35, 11 December 2024)
- ML20148D681 + (17:00:36, 11 December 2024)
- PNO-IV-80-032, on 800905,uncontrolled Release of Radioactive Gases Through Plant Stack Occurred When During Cooldown Letdown,Sys Relief Valve Lifted & Remained Open About 5 Minutes.Estimated Release Less than Tech Spec Limit + (17:00:37, 11 December 2024)
- ML20148D674 + (17:00:38, 11 December 2024)
- ML20148D673 + (17:00:39, 11 December 2024)
- PNO-III-80-169, on 800904,reporter from Chicago Sun Times Contacted NRC Resident Inspectors Re Allegations That 400,000 Gallons of Radioactive Water Leaked from Station Since Jul 1980 + (17:00:40, 11 December 2024)
- ML20148D672 + (17:00:40, 11 December 2024)
- ML20148D669 + (17:00:41, 11 December 2024)
- ML20148D670 + (17:00:41, 11 December 2024)
- PNO-I-80-128, on 800909,portable Gantry Fell on Summer Work/ Study Student Working in Reactor Bldg Causing Fractured Skull & Internal Injuries.Reactor Was Shutdown.No Radiation or Contamination Was Involved + (17:00:42, 11 December 2024)
- IR 05000445/1978015 + (17:00:43, 11 December 2024)
- ML20148D664 + (17:00:44, 11 December 2024)
- ML20148D662 + (17:00:45, 11 December 2024)
- ML20148D660 + (17:00:46, 11 December 2024)
- ML20148D659 + (17:00:46, 11 December 2024)
- ML20148D657 + (17:00:47, 11 December 2024)