Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151P051 + (10:41:11, 11 December 2024)
- ML20151P050 + (10:41:12, 11 December 2024)
- 3F1285-13, Responds to Violations Noted in Insp Rept 50-302/85-41. Corrective Actions:Procedure for Startup Revised to Add Signoff for Verification of Agreement W/Acceptance Criterion for Estimated Critical Position Calculations + (10:41:13, 11 December 2024)
- ML20151P047 + (10:41:14, 11 December 2024)
- ML20151P043 + (10:41:15, 11 December 2024)
- ML20151P046 + (10:41:15, 11 December 2024)
- ML20151P041 + (10:41:16, 11 December 2024)
- ML20151P040 + (10:41:17, 11 December 2024)
- IR 05000373/1988005 + (10:41:19, 11 December 2024)
- PNO-I-85-095, on 851230,seal Failure on RCS Makeup Pump 1A Occurred,Spilling Approx 300 Gallons of Water on Floor.Nine Personnel Slightly Contaminated.Approx 46 Ci Released from Plant.Pump Drained.Personnel Cleaned Up Room + (10:41:19, 11 December 2024)
- A07122, Forwards Addl Info in Response to IE Bullentin 85-003 Re motor-operated Valve Common Mode Failures.Water Hammer Due to Valve Closure Not Considered in Determination of Pressure Differentials + (10:41:20, 11 December 2024)
- ML20151P029 + (10:41:21, 11 December 2024)
- ML20151P028 + (10:41:22, 11 December 2024)
- ML20151P025 + (10:41:22, 11 December 2024)
- ML20151P022 + (10:41:23, 11 December 2024)
- ML20151P019 + (10:41:24, 11 December 2024)
- ML20151P012 + (10:41:25, 11 December 2024)
- ML20151P010 + (10:41:25, 11 December 2024)
- DD-88-04, Advises That Time for Commission to Review Directors Decision DD-88-04 Expired.Commission Declined Review. Decision Became Final Agency Action on 880412.Served on 880420 + (10:41:26, 11 December 2024)
- ML20151P003 + (10:41:29, 11 December 2024)
- ML20151P006 + (10:41:29, 11 December 2024)
- ML20151P002 + (10:41:30, 11 December 2024)
- ML20151N999 + (10:41:31, 11 December 2024)
- ML20151P000 + (10:41:31, 11 December 2024)
- ML20151N994 + (10:41:32, 11 December 2024)
- IR 05000425/1988018 + (10:41:33, 11 December 2024)
- ML20151N990 + (10:41:34, 11 December 2024)
- ML20151N986 + (10:41:34, 11 December 2024)
- B11931, Advises That Mods to Valve Operator & Limit Switch Logic of Return Line Valve MOV 1-IC-3 to Address Dominant Predicted Causes of Isolation Condenser Failure,Described in Probablistic Safety Study,Completed + (10:41:35, 11 December 2024)
- ML20151N984 + (10:41:36, 11 December 2024)
- ML20151N981 + (10:41:36, 11 December 2024)
- ML20151N978 + (10:41:37, 11 December 2024)
- IR 05000348/1985025 + (10:41:38, 11 December 2024)
- ML20151N974 + (10:41:38, 11 December 2024)
- B11938, Discusses 851214 Discovery of Damage to Pipe Supports on Two Main Steam Lines.Overloading Caused Bolt Failure on Support Bases.Supports Redesigned Utilizing Postulated Load Derived from Observed Failure + (10:41:39, 11 December 2024)
- IR 05000443/1988004 + (10:41:41, 11 December 2024)
- ML20151N968 + (10:41:41, 11 December 2024)
- ML20151N967 + (10:41:42, 11 December 2024)
- ML20151N964 + (10:41:42, 11 December 2024)
- ML20151N962 + (10:41:43, 11 December 2024)
- ML20151N959 + (10:41:44, 11 December 2024)
- ML20151N957 + (10:41:44, 11 December 2024)
- ML20151N955 + (10:41:45, 11 December 2024)
- ML20151N950 + (10:41:46, 11 December 2024)
- ML20151N949 + (10:41:47, 11 December 2024)
- IR 05000416/1985042 + (10:41:52, 11 December 2024)
- ML20151N944 + (10:41:53, 11 December 2024)
- B11936, Forwards Status Rept Re Implementation of Seismic Interaction Program.Tasks Include:Anchorage Adequacy for Nonseismic Equipment in Seismic Category I Bldgs & Structural Integrity of Piping,Per Sser 4 (NUREG-1031) + (10:41:54, 11 December 2024)
- ML20151N942 + (10:41:54, 11 December 2024)
- ML20151N940 + (10:41:55, 11 December 2024)
- ML20151N935 + (10:41:56, 11 December 2024)
- ML20151N929 + (10:42:00, 11 December 2024)