Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153C617 + (08:06:31, 11 December 2024)
- 05000219/LER-1986-001-02, :on 860117,three of Four Reactor Low Level Scram Sensors Found Out of Spec During Monthly Surveillance. Caused by Instrument Drift.Setpoints Adjusted within Acceptable Ranges + (08:06:33, 11 December 2024)
- 05000362/LER-1986-001-01, :on 860112,main Turbine Tripped When Loss of Load Signal Generated by Turbine Supervisory Sys.Caused by Operator Failure to Confirm Plant Configuration w/as-built Drawings.Instruction SO23-6-5 Revised + (08:06:35, 11 December 2024)
- ML20153C612 + (08:06:36, 11 December 2024)
- ML20153C611 + (08:06:36, 11 December 2024)
- ML20153C610 + (08:06:37, 11 December 2024)
- ML20153C608 + (08:06:40, 11 December 2024)
- IR 05000324/1988026 + (08:06:41, 11 December 2024)
- ML20153C605 + (08:06:42, 11 December 2024)
- 05000213/LER-1986-005, :on 860115,electric Switchgear Room Halon Fire Suppression Sys Automatic Actuation Capability Removed from Svc to Prevent Inadvertent Discharge of Halon During Mod of Inadequate Core Cooling Instrumentation Sys + (08:06:43, 11 December 2024)
- ML20153C602 + (08:06:44, 11 December 2024)
- ML20153C601 + (08:06:45, 11 December 2024)
- ML20153C599 + (08:06:46, 11 December 2024)
- 05000302/LER-1985-004, :on 850425,determined That Heating & Ventilation Ductwork Improperly Installed.On 850501, Determined That Deceit Bolts Installed in HVAC Sys.Repairs & Seismic Design Analysis Completed + (08:06:48, 11 December 2024)
- ML20153C597 + (08:06:49, 11 December 2024)
- ML20153C595 + (08:06:49, 11 December 2024)
- PY-CEI-NRR-0905, Forwards Seventh Quarterly Rept Cleveland Electric Illuminating Seismic Monitoring Network,Apr-June 1988 + (08:06:50, 11 December 2024)
- ML20153C593 + (08:06:51, 11 December 2024)
- ML20153C591 + (08:06:51, 11 December 2024)
- ML20153C588 + (08:06:56, 11 December 2024)
- ML20153C587 + (08:06:56, 11 December 2024)
- ML20153C586 + (08:06:57, 11 December 2024)
- 05000317/LER-1986-001, :on 860123,automatic Reactor Trip Occurred During Monthly Testing of Reactor Protective Sys.Caused by Mechanical Failure of Reactor Trip Circuit Breaker 2. Breaker Replaced + (08:07:00, 11 December 2024)
- ML20153C582 + (08:07:01, 11 December 2024)
- ML20153C581 + (08:07:01, 11 December 2024)
- ML20153C580 + (08:07:02, 11 December 2024)
- 05000369/LER-1986-003, :on 851103,unit Entered Mode 2 W/Motor Operators for Two Valves for Refueling Water Storage Tank & Vol Control Tank Inoperable.Caused by Personnel Error.Valves Repaired + (08:07:03, 11 December 2024)
- ML20153C577 + (08:07:04, 11 December 2024)
- ML20153C576 + (08:07:05, 11 December 2024)
- 05000458/LER-1985-064, :on 851228,hydrogen Gas Grab Sample Not Performed When Main Condenser Offgas Explosive Gas Monitoring Sys Declared Inoperable.Caused by Inaccessible Sample Point.Personnel Counseled + (08:07:07, 11 December 2024)
- 05000254/LER-1986-004, :on 860119,reactor Scram Occurred Due to Atws/Alternate Rod Insertion Sys Initiation.Caused by Deficiency in Procedure Used to Drain Vessel.Procedure Revised + (08:07:09, 11 December 2024)
- ML20153C572 + (08:07:10, 11 December 2024)
- ML20153C573 + (08:07:10, 11 December 2024)
- 05000458/LER-1986-006, :on 860110,discovered Maint Activities Performed on Feedwater Testable Check Valve W/O Performance of Operability Test Prior to Returning Valve to Svc.Caused by Personnel Error.Valve Successfully Tested + (08:07:12, 11 December 2024)
- ML20153C570 + (08:07:13, 11 December 2024)
- ML20153C568 + (08:07:13, 11 December 2024)
- ML20153C566 + (08:07:17, 11 December 2024)
- ML20153C565 + (08:07:18, 11 December 2024)
- 05000458/LER-1986-008, :on 860107,unqualified Wiring Connecting Control Components in Limitorque Motor Operator Discovered. Caused by Design Change.Valves Declared Inoperable & Wiring Replaced W/Qualified Rockbestos Wire + (08:07:19, 11 December 2024)
- ML20153C563 + (08:07:20, 11 December 2024)
- ML20153C562 + (08:07:21, 11 December 2024)
- ML20153C558 + (08:07:22, 11 December 2024)
- ML20153C560 + (08:07:22, 11 December 2024)
- 0CAN048809, Submits Addl Info Re Response to Violations Noted in Insp Repts 50-313/87-13 & 50-368/87-13 Re Temporary Mod for Filling Seismic Condensate Storage Tank.Training Will Be Completed by 880630 + (08:07:23, 11 December 2024)
- ML20153C555 + (08:07:23, 11 December 2024)
- ML20153C554 + (08:07:24, 11 December 2024)
- ML20153C552 + (08:07:25, 11 December 2024)
- ML20153C551 + (08:07:25, 11 December 2024)
- ML20153C549 + (08:07:26, 11 December 2024)
- ML20153C546 + (08:07:27, 11 December 2024)
- ML20153C547 + (08:07:27, 11 December 2024)