|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:NRC TO STATE/LOCAL GOVERNMENT
MONTHYEARML20154M5951988-05-26026 May 1988 Partial Response to FOIA Request for Documents.Forwards App L Documents.App K & L Documents Available in PDR ML20153C2271988-04-28028 April 1988 Partial Response to FOIA Request for Documents.Forwards App G Documents.App G Documents Also Available in Pdr.App H Documents Withheld (Ref FOIA Exemption 5) ML20151N7681988-04-18018 April 1988 Partial Response to FOIA Request for Documents.Forwards App D & E Documents.App D & E Documents Also Available in Pdr. App F Documents Withheld (Ref FOIA Exemption 5) ML20151C1881988-04-0707 April 1988 Partial Response to FOIA Request for Documents.Forwards App B Documents Re Allegations at Facility.Apps a & B Documents Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) ML20153C5821987-07-31031 July 1987 Ack Receipt of Inquiring About Gap Request for Independent Task Force to Review Allegations & Citizens Concerned About Nuclear Power Motion to Reopen Plant ML20235J0431987-07-13013 July 1987 Ack Receipt of G Barrientos Re Two Pending Motions Before NRC Concerning Plant.Decision Will Be Rendered on Both Motions in Near Future.Served on 870714 ML20203J0071986-04-15015 April 1986 Addresses Questions & Concerns on Mod 4 to Agreement NRC-31-83-671 Re Interim Preoperational Environ Surveillance Programs at Facilities,Per Jf Thiel & Subsequent Telcons.Funding Levels Detailed ML20137E9531985-08-20020 August 1985 Responds to & 850809 Telcon Re Environ Surveillance Program Under Cooperative Agreement NRC-31-83-671.Program Satisfactory,Based on Accumulated Baseline Environ Data Collected During Jan 1984 - Aug 1985 ML20062G5461978-12-20020 December 1978 Forwards Environ Rept Info Re Route of Transmission Lines Through Wharton Co & Authorizations Related to Pwr Line Easement.Forwards Related NRC FES(NUREG-75/109)of Mar 1975 Re Constr & Maintenance of Transmission Lines in Wharton Co 1988-05-26
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses ML20210D9011999-07-23023 July 1999 Forwards Safety Evaluation Re Inservice Testing Plan Request for Relief RR-5 Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210C2111999-07-21021 July 1999 Forwards Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626.Two Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209H9231999-07-16016 July 1999 Discusses South Texas Project,Units 1 & 2 Updated Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Staff Revised Info for Plant in Rvid & Being Released as Rvid Version 2 ML20207H6261999-07-0808 July 1999 Responds to Re 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section Xi,Division 1.Forwards SE ML20195J6731999-06-17017 June 1999 Responds to Re Request for Relief from ASME Code, Section Xi,Requirement to Perform VT-1 Visual Exam on Accessible Surfaces of RPV Flange Inserts (Bushings). Safety Evaluation Encl ML20195F7561999-06-10010 June 1999 Forwards Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515 at South Texas Project Electric Generating Station,Units 1 & 2.No Violations Were Identified ML20207H0031999-06-0909 June 1999 Discusses 990419 Meeting in Region IV Ofc Re South Texas Project EP Program Status,Including Initiatives in EP Program,Future Revs to EP & Dept Performance Indicators. Meeting Attendance List & Licensee Presentation Encl ML20195G3241999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Change Notice 18-2.No Violations of 10CFR50.54(q) Were Identified ML20207D7371999-05-28028 May 1999 Discusses Re Process for Reclassification of non- Risk Significant Components.Forwards Concerns & Cautions for Consideration Based on Limited Review of Reclassification Process Overview That Was Provided IR 05000498/19980151999-05-28028 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/98-15 & 50-499/98-15.Corrective Actions Reviewed & Found to Be Responsive to Issues Raised ML20207E1961999-05-25025 May 1999 Forwards Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Primary Focus of Insp to Review Operational Status of Emergency Preparedness Program ML20207A8771999-05-25025 May 1999 Forwards RAI Re Licensee 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant,Units 1 & 2.Response Requested within 120 Days from Date of Ltr IR 05000498/19990061999-05-12012 May 1999 Submits Corrected First Page of Cover Ltr Re Insp Repts 50-498/99-06 & 50-499/99-06 Conducted on 990221-0403.Subj Line Was Corrected ML20206S3201999-05-12012 May 1999 Forwards Corrected First Page of Cover Ltr,Which Forwarded Insp Repts 50-498/99-06 & 50-499/99-06,issued on 990505. Subj Line Indicated on NOV Was Incorrect ML20206N5481999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ra Gramm Will Be Section Chief for South Texas Project.Organization Chart Encl ML20206J4321999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info.Without Encl ML20206J4211999-05-0606 May 1999 Ack Receipt of in Response to & Insp Repts 50-498/99-04 & 50-499/99-04,confirming Commitments as Stated in 990225 Exit Meeting ML20206H6201999-05-0505 May 1999 Forwards Insp Repts 50-498/99-06 & 50-499/99-06 on 990221- 0403.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3811999-05-0505 May 1999 Responds to STP Nuclear Operating Co Which Provided Update to TS Bases Pages B 3/4 2-6.Revised TS Bases B 3/4 2-6 That NRC Staff Will Use to Update Copy of STP Bases Encl ML20206H2001999-05-0404 May 1999 Forwards Exemption from Requirements of 10CFR50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation ML20206B6091999-04-22022 April 1999 Forwards Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted ML20206B3281999-04-22022 April 1999 Forwards Insp Repts 50-498/99-07 & 50-499/99-07 on 990405- 09.Insp Focused on Radiological Controls in Place During Unit Refueling Outage.Violations Identified Involving Failure to Follow Radiation Work Permit Instructions ML20205Q8151999-04-16016 April 1999 Forwards Request for Addl Info Re Proposed Amends on Operator Action for small-break-LOCA,dtd 980728.Response Requested within 45 Days of Ltr Date ML20205P5821999-04-15015 April 1999 Advises That Version of Application & Affidavit Dtd 990127, Executed by Ha Sepp,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended 1999-09-09
[Table view] |
Text
I .
i[ % UNITED ITATES DISTRIBUTION Y
,[ c NUCLE AR REGULATORY COMMISSION W ASHING TO N, D. C. 20555 g E t / EM
%, / OSP JUL S 11987 W$ IP SLITP The Honor,able Frank C. Cooksey '
l Mayor l City of Austin !
P.O. Box 1088 Austin, Texas 78767
Dear Mayor Cooksey:
The Conrnission is in receipt of your June 30, 1987 letter inquiring about the Government Accountability Project's (GAP) request for an independent task I force to review allegations and Citizens Concerned About Nuclear Power's (CCANP) motion to reopen the record regarding the South Texas Nuclear Project.
In a July 15, 1987 letter, the Comission infomed GAP that the agency could detemine more appropriately whether the appointment of an independent task force is warranted, after careful review of the allegations in detail. (See attachment.) Thus, the Comission encouraged GAP to provide the allegations to the agency. GAP repeatedly has refused to provide the allegations to the agency and has yet to do so. Once GAP complies with this request, the agency will be in a position to make the appropriate determination regarding allegations management. Further delay by GAP in turning over the information will only result in further delay in the agency looking into the matters to which GAP has alluded in its comunications with the NRC and others.
The Comission recently denied CCANP's motion to reopen and referred it to
, the NRC staff for consideration under 10 CFR i 2.206.
Thank you for your concern regarding these matters.
Sincerely, Harold R. Denton l Director l Office of Governmental and Public Affairs
Attachment:
NRC Letter to GAP, July 15, 1987 -
Fo1A-88-Iog Gll'$
8805060256 000420 OG- Oh PDR
ps Mc
/ 'c, UNITED STAT ES g NUCLE AR REGULATORY COMMISSION
,,, g i
+
g t
l wt.SHINGTON, D C. 20555 gv f July 15, 1987 or e.c c or 1 t SECRETARY 87 JG.17 A9 52
- . 1 Billie P. Garde, Esq. hw Director, Midwest Office i Richard E.:Condit, Esq.
l Staff Attorney Government Accountability Project '
1555 Connecticut Avenue,'N.W., Suite 200 SERVED JUL 1 7 1987 Washington, D.C. 20036
Dear Ms. Garde and Mr. Condit:
This letter responds to your May 29, 1987 petition under 10 CFR 2.206 for the establishment of an investigative unit independent of NRC Region IV and the Executive Director for Operations (EDO), to review allegations concerning the South Texas nuclear power plant.
1 You s >ecifically state in your petition that "[1]t would be inappropriate to
- have :the EDOS or anyone connected with Region IV decide the merits of this petition since they are the individuals we are seeking relief from." GAP 2.206 Petition at 15. A 2.206 petition is addressed to the Director of Nuclear Reactor Regulation or the Director of Nuclear Material Safety and Safeguards. 10CFR2.206(a). These directors report to the EDO who by virtue of his position is involved in the 2.206 deliberative process. Taking into consideration the plain languace of your request, the Comission decided to treat the document that you characterize as a 2.206 petition as a request for Comission consideration. The Comission notes, however, that the detennination of the most appropriate means of evaluating alleoations is essentially within the Comission's discretion and is not within the scope of actions contemplated by 10 C.F.R. 2.206.
The agency can best determine whether the allegations should be handled by Region IV personnel or by an independent task force only after detailed review of the nature of the allegations. The Comission encourages GAP to provide the allegations to the agency promptly pursuant to the May 20, 1987 subpoena issued to Ms. Garde. Additional delay in turning over the infonnation to the acency will only result in further delay in looking into matters which you l
cfaim are relevant to public health and safety. Af ter the egency has reviewed l
the substance of the allegations, it will be in a better position to detennine whether Region IV is the appropriate entity to review the allegations or whether the appointinent of an indepenGnt task force is necessary. The Comission assures GAP that the agency will handle the investigation of the allegations properly, both with regard to technical review and confidentiality.
Sincerel
('
y ct PL u a samuel J. Dilk nq, / Secretarr of the Ccanission I
(
e og 57 ur tpc-tttH UE3 '
l' N t ;
10/9/87
\
Fax to: Carla Smith, OGC, H Street From; Bob Newlin, PA, HDQ 4 pgges including cover sheet i
3
- a. c 1 4 $
= :-
2 Fo1A-88-107
to e te 11 C 'M.T,3?. .. ic M
.m s a oce r. ces e UP! STATE Wiro (TEXAS)- egulatory cimmi stion,10,ecr0J tc!(161 1PM-197-971008a1005Y0001 "'i ,"l ',. n f itexas, colo.)
\ttorney 7y PHILIP J. GAACIAf or werkers at South Texas nut, lear plant assails NRC "3,i
.>4-WASHIN3 TON (UP1) '
An attorney representing whistle. blowers at the 1 3euth note interested Texas Project breaking saidher Thursday the Nuclear Regulatory Commission is 4,: ;
group "once and for 411" than, n ,, {
investigating alleged safety defects at the' nuclear plant. ' ' y, , F i Billie Garde of the Government Accountability Project said she has b *t;I
+
i Executive Director Victor. Stello has pledged to break. 7 caengroup.
her. told that,NRO
- 3AP and 91111e Garde once and f! understand that be says privately is he's gotegI t -
Capitol Hill news conf erent:e. ! or all," Garde said of Etello at a f * .- )t
" " Ac 4 '
. . - < "yE
- 3 meeting.,"that's' b een *' report;ed ",to, nw (f ro ..
w l Garde ad - ' 'i . 3, hat he's;said{stja number;of 4 S ullo was una,va(ded.ci,. . 3,
.S. +% !
spoke.-an, di sputed. Garde's cl ai m.l abl e f or' comment.: But$ Fr e.g[e,(,d' Ink!!ngree,',,
NRC p a3 ,
' w" All we ,c an ,s B1111 e Gar'de'. the ay',1,s .t!Mt.2. hat, we'ra.tr.yt og-t.c> do A s4 i3 h .C 4 * - -
^ ' ,., , {- g" ,
t .
about saf ety problems at thetoSouth get from/ .
Texast{a ,47 ~~ ~ ,
~
nucl ear powe,r' pl ant allegations
, " he'said.
In May, 4 ,(aj s )
the NRC issued a subpoena.to Garde ordening'her aereithan three dozen workers at STP who have;made allegations s
3 work?and wrongdoing,at-the' nuclear.; facility near Bay' City. Y*
workers Garde woulrefused.
d f ace run.i to ' comply,'
shmenti. The NRC, citing, confidentiality and f ears that$. ' * #t4 . ,
I.
filed suit in U.'S.lDistrict Court (n , Washington 3 0 enforcthrough'theJustice Garde, t w I 4115 eeet a Friday'courticeac1'ine foraccoepani ed by; Rep. said L Patri GAPll a Schroeder
- not reveal the idantitief ef' the 6orkers andexplaining ~why the group should 4 #. {
is set foe Oc t . '22 " GAP 's a i d Z ' ' .
its 1nf oreation. A hearing i a- ;
i Garde said.the NRC'knows tho' identities of I GAP represents.at' concerns to,the., agency.7.% g
- South .Towas because thty already had em17 pressed of. the 56 1n' i divid
)
Garde # ,
s , ,y , -
s process has' asked .f od.th'e Spoo,intment' of a . special task force, ,
a'
she,said;,that
- 1n- Q: 'has r ). tbeeWf }&' allowed regularly in ,every*. '
region,'since 1980t ." '
to *pl ay'tough," thi s case," Mr.MGte11o has. chang e6 ;th e .rul esl(and[
Garde'said. h'a s)
. decided
(
- j Stallo has said he wants to review' , , , ( ,t .. _',
v[,,
decision on establigning's task f orCo. the 411egations before making a in all,' Garde said.~.k , ,
.There,are about 650 allegations "
Ingram allegations are, reiterated't8e NRC's~ position that , ,
with them."' . we will be able to proceed and'"Once figureweout know what thei ,,y
,'" shat to do ' ~ '
Houstont.ighting4;'Powert00...*themajor'pa'rtner sought GAP's inf ormation. , at STP,ialso.has j Schroeder,.a leading cong desional .
i.
Post Of ficeCivi and.l-?k','?W* ' Y,1.tegice Com;si ttee,action rights and $ chairm "outrageous."i ervice of the -
was. M. , -'
ve' goo Si4wdistle ~ blowers) .that.'is a' 'ver
t61mg,"
. WWhen Schroeder you' said.$
"We,*. as tampayer,s, 'ought to be totally fl j *
- oute aged at that . type of , syst em. .. . . a
lp GAP, Joan said NRC',sClaybrook,( actions %ere prest, dent of Public Citt aen,' whichIt 'is power: ,,n*
i rejected by the pubite generally.""a use 'of, governeent. power that I think{*y '" '
is } g "It's g-e Sh,Ia tremendous said GAP.would make'vse of' threat to all . public interest A groups. g "fi J'
"enormous protections*,'under# the 5 / I. ' )
eirst, Amendmentf rights ,of ,*assepationgand,at torney-client vowed the caseiwillfbe; necessary." pursued;*"allithe way to the Supres e. Shei *pet vileg I!l
.. -p(4 e Court 14,, ;, 's
.kGarde"At thissaid acint, *ta theINRC 11tigation'would in. acting, not hold up plant operations.,, * )
to!ccerate as,4f {
? these allegations do not exist ,"and has Garde stated. said. that,i.it is going.
She,rsaid whether or';not plant operations should be held up i
decision 3 9ut that, frankly, only the NRC can make.O ,
- is a "rubber-stamped Sout(Texas .in the ,first, place andthe said'any pecblems."
dn't find these,g and hopes to generate electricity by earlySTP
. next yea *.
recently,rece,ived operation s '
NRC
~
g so . r, GI~l0~M-8[03NG' ped 1 1 " "'
k Di spo si ti on!g 'f orwar d ["1 -hn ' ,. " ;
Tol'.l ?
... rego11 rygC13 reg 015' s
_ __ .g-w __________._._--r- * * ' ' ' ' ' '
i.
Y. '
@Q..p. . .. t.' y
. ': n, . . c.
. ':l
.' 3. :q:g,p NUXE SUII-i'
.BGBNDREW MANGRH k.%.%:,n; ,:e.3/f.hh
. .%gc.d$ p L.c
.p1.3...
4 m.M 6; , M , W . .. .
7
!-(WRSHINGTON'(
WHISTLEBLOWERSN. RPM $AN'lRTIORNEY CHRRG I NGjMI SDEEDS ' R T IHE': SOUTH
- IEXRS ' NilCl ERR.hPP,0 S
.REPRES'EHTIN ,
l iliyNM THE NU.CLERREREGljLRJORy.fCONHI SR S SHE'tWILLEG0hT0VJSILQRTHER7IHAN.'
6
- . W $, D .~ . ' " c: f ? S I N ' SSJ #0 . ,,.
RLLEGRT10NS(INCLUDEsS AFETY4RND.iC8I.MjN.RLt.41SCONDUCTl RHDje,AF.ArffS P0.0RTWORKMANSHI GRNI2E
.f.
~
RRUD;j0gT Eg,gTg0F.<THEo 00VE.PN.MFNTp~ A4 i Q.QJLT.R'AC.TERS. .. $f/$ : 'M k.m.Ak,@WOM. I
- 4. bit' L,1,EiPl. GARD.E's . .
JE CT W H R8.TiORNEYE.0RTHE S tB EE NTO R D E R ED ABY ST C THROUGHlR?SUBP0ENR%)T.0$til( }i PgLilRMES&RND RL Cl.EGAT: IONS'6BR0' 2HEf BYli,HEf UGH $iT0)
WHI,STl'FRI'0UER$ k, -
h, RE.GARDING1TH UNCOMPLET F TT B S .T'G R R D.E s )l0 W E 9(R3.E D910 C L'E R R IP[ "
lyP 'RIIRl3INy ST)G.R'hl'0.E.0FM)H M0 TH.RN!65.0}INDY I,DilR pc'HffA5} g g MQTHERNRC/INDIVID.U.RES' 00K' III SECRLLEGRTIONS'MllsT9NRMA NF E
SRME PEOPLE 4WH030R'I'GINRi' NORE'DMIJiP)0Bt"EM RN$uEH,TM00NMNa I.NjIHEFFIRSTP.[R,CEIM'SAIDh IN RUBBERSTRMPED.TS.00TH%Ig.XRj,NRCTEXECU P0'INTING'SPECIFICRtlMMT01 V
,2 ij s
- i. -
OFF,.!CIRLS OVERSEEINGITHE0S00,THWESTERN! UNITED'STRTES FOR'HRC.f % b" ' ':
RMS.GARDEMR A
j ;-
DEPRRTMENT4WJL'LgES%.[FEDERRLdC.00RT3HERRI.NGj00T h
SEERRjDECISION TO .
WORMRIIONQ*HI W.8 'WE'(RSXED .gT :THEs.B,EGINNINGi.0Ff.It't.DRO
.HESHE?.,SRMf.SHEijCOMPELL' W
00 0Fj R SP.EC.IRCMTRSXt FORCE.<R$ SOUTH ATEXRSIU0 ,
g.
APP 01.NTMENT.3 FR0iDTHEI U g; D.
L4.'IN5'IHIS E D.44CRSEIMRU g R E G TU l 'R P lYAIS N ST SHEiISRID. S!'.00.U $ f.' N,T R Y ",S .
M P;.3 T S T E l i n J a c.QO T'HIEXECUTIyfDREp@DJOj.ELLO"HAS' !
GjgDE/,SRID. 04.?;- @iM W T- *
'i
.S [
' V ' '. ~ W ".
'BENERRLj0 LNG TEl'LO: IO RERks., miy@iREJECTEDI
? #
% RCC0 E c.RSSESSHEN.T(0F3IHEiRL' LEG ATI WRS' o D ER L S Mi E T U R N! V ERy,T H t 54M I N Gf0 V E 'R?' " -
.' ' ' .8
' " $@O
'SP,t.dN N STTAc7N MNRC70FFICIRl E
.(lgESTIGRTI,0Ny,S$10WEVEK SRY'THEY!RREsSIM h M i@VM M.% R M b;'T:. J. F .' $ 1 3.V,.4 Q.?.
~
{-
wp.UNTIl3WE9,SEEXTH.E+.RLLEGR,TI.0N.SfWHICH SijE.l: HRS REFilRED. 7,0*n TVf;.plc.',ue
?
C AN')'TP ETERMI NE% HOW%THEY(SHOUL D?BE?
WE){l IN.. 1.FR'RNdST)flT0'g G0.UR%EC'UTIVE'.DIRECTORJFOR'0PFPATTON430e"eo 1,
, ;.c , .
. S NO ,C,LERR6T0lHIM.MHE.THEpRHYIHIllG SHOULD BE:.DONE ~
np S .THfT.^IF#
'd F4H AN.0TfG0TTEN V EF,N E CE S S A R.YE E}.L Lb C :R E '!R T? E?R .
'%.i.iT 8 S -
k XNOWkWHRh.T.Wi.!IN{SAID '
HEY $RR$ @dfA7J
. jiEIRLLEGATIONSR 4
- 8. *:"
}.; .? -
f i, h a
sg ... . . .. ; 4i s r o ^ wG NuGLt:.AR RE'suLa t uMY LUMMISulul4 :nuc1Wr ..r rain t Aho"y wmitia nsi on W ficial
. ei o UP!"SIAll* Wiru (IEXAS) i .Irl:" IPM-197-W71UO6-16713VUV1 LCx00 NC official suoko reviuw of all eg.it s onn O L South Tenan Project WA':HINUTUN (UPI) _ A Nuclear Rcqui ntor y Commi %ic.,n officlul s ai d.
uccdny he "would need to suo" allegationn by workcen at the South mco Projuct af ectu at the nuclear plant.
bef ore deciding to f orm a task f orce on allegud saf ety Victor Stwilo Jr., executive director of the NRC, confirmed a eport that he would be willing to cr cate a special task forcu if scCocary. But Stello reiterated that no such decision had been made.
ot a"Ita'sk would needisto f orce see the allegations before deciding on whether or needed," Stello said through a spokesman.
Allegations' of wrongdoing have been made by whistle blowers 4
cprotwnted ublic interest by the Government Accountability Project, a non profit group that works Ni th whi stle blowers. j hO j
..uth Texas workers. an NRC subpoena that seeks the identity of the Project is fighting ,
1 Th3 Project's. attorney, Billie Gards, I teco*to 600 allegations of saf ety and related caf ects atclaims to bothe withholding facility icar Bay Ci ty.
Garde has refused to comply with subponna, auld Isak .
arguing the comminsit-the identities to the utilities and contractors and exp. <
ho whistle blowers to punishment by their employers. i Sho also safety nvootagate says there concernsis evidence at STP. the commission is unwilling to goin Thorefused NRC filed suit in Washington to enf orce the subpoena but Garde to comply, r ivil eg es. .
citing attorney-client and rela'ted 1cgal ,
Tho Project has until Friday to show why it should nut rele.de thu
. meo and Tom Carpenter, a lawyer for the Project in Washington, said ho. "We're group will arguingrespond that in U.S. , District complying with Court in Washington.
rocch the attorney-client privilege," the Carpentar subpoena nald. wouldThet'orce us tuwill project 100 ffcct" cegue that enforcement of the subpoena "would have a chilling l scuoc regarding on workers' safety, ability to consult Carpenter added. with attorneyn or groups on ,
Tho Project has called abporna. .
a news conference Thursday La discuar thu Houston Lichting & Power Co.
.:cet up the first of received a license this summer to 1 agin generating electricity early nenttwo nuclear
- year. reactors at South Texas and hopub tc
.uclocr Tho NRC powerisplant. required by law to assuss any threat to the safety of a Garde earlier this year ast,ed Stal l o to appoint a task force
nd:pCndent of his immediate staff and personnel r esponsiblu f or nuclear
. 'rCJ Gc ts i n Tepas.
Sho based that requent in part l .tcilce saf uty allegations at on claims the commausion ignored 1cnt near Glen Rose, southwest theoftroub' Fort led Worth. Comancho Puak nuclear power r
9 ipi .10-06-87 04: 25 ped t
1 >1cproitior: forward 08 rego11 rego13 regQ94 rego15 t l
.omments :
, .cend .
L I
icil Id: IPM-164-871007-095060487 l
) NP.PA) --
Snnt
. . . - - _ _ _ _ - - . - - - - . _ _ _ _ _ - -__ - .__- - - - - - -_ ,- -