- - _ - _.. _ - - - _ _
s AWRA8E DAILY WIT POIER LEVEL
}gg g}
DOCKET NO. 50 - 352 LMIT LIMERICK LMIT 1 DATE AUS 12, 190s COPFANY PHILADELPHIA ELECTRIC CopeANY R. M. SROPP TECHNICAL AS$!STANT LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT TELEPHONE (215) M1-5054 MONTH JULY 1964 DAY AVERAGE CAILY POMER LEVEL DAY AVERAGE DAILY POMER LEVEL t P9tE-NET 1 1PME. NET 1 1
874 17 752 2
474 la M6 3
873 19 473 4
M7 20 470 5
M0 21 874 6
45!
22 442 7
M9 23 M0 8
all 24 450 9
452 15 477 l
10 853 26 472 11 M4 27 448 l
12 M7 to 464 13 476 29 864 l
14 472 30 MS 15 450 31 474 16 749
- e
/
h 7
o OQhf',
ph 3
8 e---
e-.
+n n--7---w,
~--n--
,--,,--r-,--
,-,-e-------
- - * -,e.--
w----
-e-----,---.r-----------m
,--e---
3884083990 MMTIM HTA MPORT DOCKET NO. 50 352 DATE AUG 12e 1944 COMPLETED BY PHILADELPHIA ELECTRIC CoppAM R. M. 840PP TECIMICAL ASSISTANT LICENSIMO SECTION
- GJCLEAR SUPPORT DEPARTMNT TELIPHONE t 2151441-5084 OPERATING STATUS
l l
- t. REartTING PERIODI JULYe 1944 l
QUTAGES DURING THE l
l l
- 3. LICENSED THERMAL PONERIP0(Til 3t93 l
MONTH. PONER IS DE1NG l
l l
- 4. NAMEPLATE RATING t GROSS P94E 1i 1154 l
ADMINIST:tATIVELY LIMITED l
l l
- 5. DESIGN ELECTRICAL RATING INET P94E18 1055 l
DUE TO A FUEL R00 LEAK.
l l
l
- 6. MAXIltM DEPENDA4LE CAPACITY tGROSS $94E )i 1992 l
l I
l l
- 7. MAXIttM DEPENDASLE CAPACITY INET r#4E) 1955 l
l
- 4. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS PueER 3 THRouGH 7) SINCE LAST REPORT. GIVE REASOHS
- 9. PONER LEVEL TO 99tICH RESTRICTED, IF ANY (NET 794 Ell 915
- 10. REASONS FOR RESTRICTIONS IF AWI Power administrative 1y restricted due to a fuel leak THIS MONTH YR.TO-DATE CL44;LATIVE 11.130URS IN REPORTING PERIO0 7%
5e111 21eto7
- 12. PMSER OF HOURS REACTOR MAS CRITICAL 744.0 4,403.3 17.671.3
- 13. RE ACTOR RESERYE SHUTD0194 HOURS 0.6 J.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 4.797.0 17.559.7
- 15. LMIT RESERVE SHUTDoled HOURS 0.0 0.0 0.0
- 16. 940S$ THERMAL ENERGY GEPERATED lt94H)
Is095.891 14.404 951 53.301:332
- 17. GROSS ELECTRICAL ENERGY GENERATED lt94H) 664.260 4.644.660 17.544.070
- 14. PET ELECTRICAL ESERGY GENERATED (t94H) 65a 938 4.464.019 16.631.856 e
PAGE 1 0F 2
1 3884083990 OPERATING DATA REPORT ICONTIMJED)
DOCKET NO. 50 352 b
DATE AUS lte 1988 THIS NONTH YR-TO-DATE CIMAATIVE
- 19. LMIT SERVICE FACTOR 100.0 93.9 79.3
- 20. LMIT AVAILA&ILITY FACTOR 100.0 9h.9 79.3 fl. LA'IT CAPACITY FACTOR IUSING NDC NETI 81.4 82.8 72.0
+
1
- 12. LN1T CAPACITY FACTOR tuSING DER NET) 81.4 82.8 72.0
.t3. LMIT FORCED OUTAGE AATE 0.0 6.1 4.4
- 24. SHUTD0>06 SCHEDULED DYER NEXT 6 NONTHS ITYPEs DATE, AND DURATION OF EACH)I
- 15. IF SHUTDOPN AT END OF REPORT PERIOos ESTIHATED DATE OF STARRJP8
- 26. LNITS IN TEST STATUS (PRIOR TO COP 91ERCIAL OPERATIONil FORECAST ACHIEVED IMITIfL CRITICALITY 1t/19/84 it/tt/84 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COP 91ERCIAL OPERATION IST GTR 86 t/01/86 a
4 O
PAGE 2 0F t
3884083990 IMIT SHUTD00045 AND PCMER REDUCTIONS DOCKET No. 50 35E WIT NAME LIMERICK WIT 1 DATE AUG lte 1964 REPORT MONTH JULYe 1964 COMPLETED 9Y PHILADELPHIA ELECTRIC Col 9ANY R. M. 9R0PP TECHNICAL ASSISTANT LICENSING SECTION MJCLEAR SUPPORT DEPARTMNT TELEPH004 (2151 M15054 I
l l
l l MTH000F l LICENSEE lSYSTEMICOMPONENTl CAUSE AND CORRECT!YE l
lTYPElDURATIONlRE ASOdSHUTTING 00D941 EVENT l CODE I CODE l ACTION TO C.l DATE l till IHOURsil (El i REACTOR ist 1 REPORT S l 441 1 (5) l PREYENT RECURRfMCE 1
I l -..-. I I
I I
l i
i 1,
I I
I I
I l
I r
(1)
(El III 14)
. FORCED REASON METH00 EXHIBIT G. INSTRUCTIONS
. ECNEDULED A EGUIPMENT FAILURE lEXPLAI:1) 1 = MAP 4JAL FOR PREPARATION OF DATA B - MAINTENANCE 04 TEST E. MDAJAL SCAAM.
ENTRY SHEETS FOR LICENSEE C. REFUELING 3. AUTOKATIC SCRAM.
EVENT REPORT (LERI D. REGULATORY RESTRICTION 4
OTHER (EXPLAIN)
FILE IMJREG 0161)
E. OPERATOR TRAINING + LICENSE EXAMINATION F. ADMINISTRATIVE (5)
G. OPERATIONAL ERROR (EXPLAIN)
N. OTHERIEXPLAIN)
EXHIBIT I. SAME fouRCE
--m w
e'~
D:0kot N3. 50-352 Attachm3nt to Monthly Operating Report for July, 1988 i
Limerick Generating Station Unit 1 July 1 through July 31, 1988 I.
Narrative Summary of Operatino Experiences On July 15, reactor power was reduced to approximately 77%
for investigation of vibration on the '10' circulating water pump.
Balancing was required to correct the problem.
On July 17, reactor power was further reduced to approximately 67% following discovery that a control rod had travelled full in.
An investigation revealed that a blown fuse coincident with a surveillance test that allowed a half scram caused the rod insertion.
Power was restored to approximately 87% once rod pattern adjustments were completed on July 17.
L F
i i
II. Challenges to Main Steam Safety Relief Valves There were no challenges to the main steam relief valves during the month of June.
i r
I I
.I
+
3884083990 PHILADELPHIA ELECTRIC COMPANY kiMERICK OENER ATING SYATION P. O. BOX A S AN ATOG A. PENNSYLV ANI A 19444 (115) 327.t 200. EXT. 3000 OR AM AM M. LEITCH u.....'*.'...".'.1'.".u,,
August i1, 1988 Docket No. 50-352 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
Subject:
Limerick Generating Station Monthly Operating Report i
Gentlemen:
t c
Enclosed is the monthly operating report for Litaerick Unit 1 l
for the month of July, 1988, forwarded pursuant to Technical l
Specification 6.9.1.6.
very trul
- yours, JJM/sp t
Enclosure cc:
Director, Office of Inspection & Enforcement, USNRC (12 copies)
William T. Russell, Administrator, Region I, USNRC i
T. J. Kenny, USNRC Senior Resident Inspector David E. Ney, PA Dept. of Environmental Resources W. H. Lovelace, NRC (2 copies)
INPO Records Center I
bec:
C. A. McNeill, Jr.
J. T. Robb/ISE i
J. W. Gallagher D. W. Diefenderfir/GE G. M. Leitch W. M. Alden