MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] |
Text
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ - -
- . s. .,
t l
t MAY 021988 !
r i
Docket No. 50-293 !
MEMORANDUM FOR: James T. Wiggins, Chief Reactor Projects Branch No. 3 -
FROM: A. Randy Blough, Chief :
Reactor Projects Section No. 3B t
SUBJECT:
PILGRIM STATUS REPORT FOR THE PERIOD APRIL 9-22, 1988 .
Enclosed is the Pilgrim bi-weekly status report from the NRC Resident Office at Pilgrim. Three resident inspectors monitored activities at the plant during
- the report period. In addition, six region-based specialist inspectors were ,
onsite during the weeks of April 11 and April 18, 1988 to review the licensee's i security program, power ascension test program, and previous inspection items. .
On April 22, 1988, NRC Commissioner Carr was onsite and teured the station. !
NRC will be conducting a public meeting at the Plymouth Memorial Hall, in Plymouth, Massachusetts on May 11., 1988 to discuss the evaluation of public
- comments and concerns expressed during the February 18, 1988 public meeting on I the Boston Edison Company's Pilgrim Restart Plan. NRC Region I is issufng a f news release to inform the public of the scheduled meeting. [
i The status reports are intended to provide NRC management and the public with
- an overview of . plant activities and NRC inspection activities. Subsequent ;
i inspection reports will address many'of these topics in more detail. ;
I i
l ddism1' Gist,ed Nyg' !
! A. Randy Blough, Chief ,
Reactor Projects Section No. 38 ;
t Enclosure- L j As stated ;
i I
4 l
l I
- ir
! [
^
l OFFICIAL RECORD COPY PILGRIM STATUS RPT 4/9-22/88 - 0001.0.0 gg 04/28/88 8905060251 890502 -
ADOCK 05000293 i PDR R DCD )&g/ t i
Memorandum for James T. Wiggins 2 M 02 m cc w/ enc 1:
L. Gustin, Vice President - Corporate Relations, BEco R. Bird Senior Vice President-Nuclear, BEco K. Highfill, Station Director, BECo J. Keyes, Regulatory Affairs Manager, BEco Chairman, Board of Selectmen, Plymouth Chairman, Board of Selectmen, Carver Chairman, Board of Selectmen, Duxbury Chairman, Board of Selectmen,.Marshfield Chairman, Board of Selectmen, Kingston The Honorable Edward P. Kirby The Honorable Peter V. Forman The Honorable Edward J. Markey M. Ernst, Committee on Energy, Commonwealth of Massachusetts S. Pollard, Energy Secretary, Commonwealth of Massachusetts B. McIntyre, Chairman, Department of Public Utilities
- N. Johnson, Chairman, Duxbury Nuclear Committee Plymouth Civil Defense Director R. Boulay M. Conyngham M. Jeka K. Anderson Public Document Room (PDR) local Public Document Room (LPDR).
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts (2) 0FFICIAL RECORD COPY PILGRIM STATUS RPT 4/9-22/88 - 0002.0.0 04/28/88
Memorandum for James T. Wiggins 3 MAY 0 21988 bec w/ encl:
Region I Docket Room (with concurrences)
T. Murley, NRR F. Miraglia, NRR T. Martin, NRR S. Varga, NRR B. Boger, NRR D. Crutchfield, NRR J. Partlow, NRR C. Rossi, NRR L. Shao, NRR R. Wessman, NRR D. Mcdonald, NRR F. Akstulewicz, NRR J. Roe, NRR W. Russell, RI W. Kane, RI W. Johnston, RI F. Congel, RI S. Collins, RI R. Blough, RI L. Doerflein, RI M. Kohl, RI M. J. 01Donato, RI K. Abraham, RI PA0 (2) 5 9
RI:DRP RI:DRP RI:DRP Q[ S Warren C
/mjd ABlough JWiggins 4/27/88 % /88 r/tfp,
,v OFFICIAL RECORD COPY PILGRIM STATUS RPT 4/9-22/88 - 0003.0.0 04/28/88
- e. .
.O ,
ENCLOSURE PILGRIM STATUS REPORT FOR THE PERIOD APRIL 9-22, 1988 i
1,0 Plant Status As of 8:00 a.m. on April 22, 1988, the reactor was in cold shutdown mode
[ with moderator temperature about 95 degrees Fahrenheit.
2.0 Facility Operations Summary The plant has been shutdown for maintenance and to make program improve-ments since April 12, 1986. The reactor core was completely defueled on February 13, 1987 to facilitate extensive maintenance and modification of plant equipment. The licensee completed fuel reload on October 14, 1987.
Reinsta11ation of the reactor vessel internal components and the vessel nead was followed by completion of the reactor vessel hydrostatic test.
The primary containment integrated leak rate test was also completed dur-ing the week of December 21, 1987.
3.0 Items of Special Interest NRC Public Meeting to Discuss Comments on BEco's Pilgrim Restart Plan On May 11, 1988, NRC will be conducting a public meeting at-the Plymouth Memorial Hall, in Plymouth, Massachusetts to respond to public comments and concerns on the Boston Edison Company's Pilgrim Restart Plan raised during the February 18, 1988 public meeting. The meeting is scheduled for 7:00 p.m. to 9:00 p.m. NRC Region I is issuing a news release and placing advertisements in newspapers to inform the public of the scheduled meeting.
NRC Commissioner Carr Tours Pilgrim On April 22, 1988, NRC Commissioner Kenneth Carr toured the licensee's Chiltonville Training facilities and the Pilgrim Station. The licensee presented a aescription of the new onsite organization, recent personnel changes, current plant status and the status of offsite emergency planning efforts. Handouts used by the licensee during the presentation will be attached to the next routine resident inspection report. Commissioner Carr was accompanied by his staff, Mr. Samuel Collins of NRC Region I, and the resident inspectors.
OFFICIAL RECORD COPY PILGRIM STATUS RPT 4/9-22/88 - 0004.0.0 04/30/88
Enclosure 2 Licensee'jnself-Assessment The licensee began a formal management self-assessment of their readiness for restart on April 19, 1988. The self-assessment will continue through about May 2,1988. The licensee has committed to provide the assessment results for NRC review. A NRC/ licensee management meeting was held on February 24, 1988 to discuss the licensee's self assessment process. The minutes of this meeting are documented in NRC Report No. 50-293/88-10. NRC will review the results of the licensee's assessment prior to conducting a comprehensive NRC Integrated Assessment Team Inspection.
MC bssessment Panel Meeting On bril 12, 1988, i..e'rers of NRC management from Region I and NRR met onsHe and discussed it.spection plans with the NRC resident staff. The NRC Assessment Panel meets periodically to coordinate the planning and execution of NRC inspection and licensing activities related to Pilgrim.
The panel is chaired by Mr. Samuel J. Collins, Deputy Director, Division of Reactor Projects, NRC Region I.
4.0 NRC Staff Status During the Period The inspection staff at Pilgrim during the report period consisted of the following:
Clay Warren ---
Senior Resident Inspector Jeffrey Lyash ---
Resident Inspector Tae Kim ---
Resident Inspector In addition, six region-based specialist inspectors were onsite during the weeks of April 11 and 18, 1988 to review licensee's security program effectiveness, adequacy of the power ascension test program, and previous inspection findings.
OFFICIAL RECORD COPY PILGRIM STATUS RPT 4/9-22/88 - 0005.0.0 04/30/88