Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154B822 + (06:35:28, 11 December 2024)
- ML20154B821 + (06:35:28, 11 December 2024)
- ML20154B819 + (06:35:29, 11 December 2024)
- ML20154B820 + (06:35:29, 11 December 2024)
- ML20154B817 + (06:35:33, 11 December 2024)
- 05000213/LER-1998-008, :on 980721,determined That Main Stack Radiation Monitor RMS-14B Samples Were Not Analyzed to Required Detection Level.Caused by Inadequate Design.Immediately Controlled Temp of Radiation Monitor Room.With + (06:35:35, 11 December 2024)
- ML20154B815 + (06:35:36, 11 December 2024)
- ML20154B813 + (06:35:37, 11 December 2024)
- IR 05000354/1986005 + (06:35:54, 11 December 2024)
- ML20154B810 + (06:35:55, 11 December 2024)
- ML20154B807 + (06:35:55, 11 December 2024)
- ML20154B805 + (06:35:56, 11 December 2024)
- ML20154B806 + (06:35:56, 11 December 2024)
- ML20154B804 + (06:35:57, 11 December 2024)
- NPL-98-0777, Forwards Addl Info Re GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. Rev 0 to Calculation 98-0132, Evaluation of 23.6 EFPY P-T Limit & LTOP Applicability Date & Pressurized Thermal Shock at 32 EFPY, Encl + (06:35:58, 11 December 2024)
- ML20154B801 + (06:35:58, 11 December 2024)
- ML20154B800 + (06:35:59, 11 December 2024)
- ML20154B799 + (06:36:01, 11 December 2024)
- ML20154B798 + (06:36:01, 11 December 2024)
- ST-HL-AE-2780, Requests Meeting W/Region IV to Discuss Schedule for Lock Down Security Schedule of Facility.Meeting Tentatively Scheduled for 880908 + (06:36:02, 11 December 2024)
- ML20154B797 + (06:36:02, 11 December 2024)
- ML20154B795 + (06:36:03, 11 December 2024)
- ML20154B793 + (06:36:04, 11 December 2024)
- ML20154B792 + (06:36:05, 11 December 2024)
- ML20154B788 + (06:36:09, 11 December 2024)
- ML20154B787 + (06:36:10, 11 December 2024)
- ML20154B786 + (06:36:11, 11 December 2024)
- ML20154B785 + (06:36:11, 11 December 2024)
- ML20154B784 + (06:36:12, 11 December 2024)
- 05000245/LER-1988-006-02, :on 880806,standby Gas Treatment Sys Initiated Automatically & Reactor Bldg Ventilation Sys Isolated Due to Spurious High Radiation Signal.Caused by Electronic Equipment Failure.Relays & Capacitors Tested + (06:36:14, 11 December 2024)
- ML20154B781 + (06:36:15, 11 December 2024)
- ML20154B778 + (06:36:16, 11 December 2024)
- ML20154B780 + (06:36:16, 11 December 2024)
- BECO-86-018, Application for Amend to License DPR-35,incorporating Proposed Change 86-02,modifying Surveillance Testing of Diesel Fuel Oil.Fee Paid + (06:36:17, 11 December 2024)
- ML20154B775 + (06:36:17, 11 December 2024)
- ML20154B772 + (06:36:18, 11 December 2024)
- 05000369/LER-1988-018-02, :on 880715,performance Determined During Testing Revealed Inability to Demonstrate Each Diesel Generator Operable.Caused by Inadequate Tech Specs. Procedures Revised + (06:36:20, 11 December 2024)
- ML20154B770 + (06:36:21, 11 December 2024)
- ML20154B769 + (06:36:21, 11 December 2024)
- ML20154B764 + (06:36:22, 11 December 2024)
- ML20154B765 + (06:36:22, 11 December 2024)
- 05000456/LER-1998-004-06, :on 980903,MSSVs Tested in Excess of Required Setpoint.Caused by Metallic Bonding Between Disc & Nozzle Seats.Valves Were Adjusted as Necessary & Retested for Placement Into Accepted Tolerance Range Prior to LCO Exit + (06:36:24, 11 December 2024)
- ML20154B762 + (06:36:25, 11 December 2024)
- 05000443/LER-1988-004, :on 880810,vital Buses E5 & E6 Tripped on Loss of Offsite Power Causing Actuation of Diesel Generator 1A Onto Bus E5.Caused by Personnel Error.Addl Training Will Be Established + (06:36:27, 11 December 2024)
- ML20154B759 + (06:36:28, 11 December 2024)
- ML20154B758 + (06:36:28, 11 December 2024)
- 05000456/LER-1998-004, Forwards LER 98-004-00 IAW 10CFR50.73(a)(2)(I)(B). Commitments Made by Util,Listed + (06:36:32, 11 December 2024)
- 05000328/LER-1988-030, :on 880621,discovered Failure to Identify Effects of Excessive post-trip RCS Cooldowns Could Cause Noncompliance.Emergency Instruction Used to Guide Operator Action Following Reactor Trip Revised + (06:36:34, 11 December 2024)
- ML20154B753 + (06:36:36, 11 December 2024)
- ML20154B751 + (06:36:37, 11 December 2024)
- RBG-28771, Informs That Min Flow Value for RCIC Pump Verified by Pump Vendor as Adequate in Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss + (06:36:38, 11 December 2024)