Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-I-88-097A, on 880920,Co-60 Source Lost During Transport from West Germany.On 880921,State of Ny Inspectors Surveyed Lufthansa Facility at Jfk Airport & Detected Radiation from Trash Dumpster.Source Retrieved + (03:44:55, 11 December 2024)
- ML20154S456 + (03:44:55, 11 December 2024)
- IR 05000382/1988012 + (03:44:56, 11 December 2024)
- ML20154S449 + (03:44:57, 11 December 2024)
- ML20154S450 + (03:44:57, 11 December 2024)
- ML20154S447 + (03:44:58, 11 December 2024)
- ML20154S445 + (03:44:59, 11 December 2024)
- ML20154S446 + (03:44:59, 11 December 2024)
- ML20154S442 + (03:45:00, 11 December 2024)
- ML20154S443 + (03:45:00, 11 December 2024)
- ML20154S440 + (03:45:01, 11 December 2024)
- ML20154S438 + (03:45:02, 11 December 2024)
- ML20154S439 + (03:45:02, 11 December 2024)
- PNO-IV-88-080, on 880923,minor Transportation Accident Involving Radiography Truck & Camera (Gamma Century Model) Occurred.State of La Found No Evidence of Radiation Exposure or Damage to Camera.Escalated Enforcement Action Possible + (03:45:03, 11 December 2024)
- 05000237/LER-1986-003-06, :on 860226,pumpdown of Drywell Equipment & Floor Drain Sumps Not Performed at Proper Interval.Caused by Operator Error & Equipment Malfunction.Horn Replaced & Operators Made Aware of Error + (03:45:04, 11 December 2024)
- ML20154S435 + (03:45:05, 11 December 2024)
- ML20154S432 + (03:45:06, 11 December 2024)
- ML20154S431 + (03:45:07, 11 December 2024)
- ML20154S430 + (03:45:08, 11 December 2024)
- ML20154S429 + (03:45:08, 11 December 2024)
- IR 05000298/1988003 + (03:45:09, 11 December 2024)
- ML20154S426 + (03:45:09, 11 December 2024)
- IR 05000352/1988018 + (03:45:10, 11 December 2024)
- ML20154S423 + (03:45:11, 11 December 2024)
- ML20154S422 + (03:45:12, 11 December 2024)
- IR 05000361/1998016 + (03:45:17, 11 December 2024)
- ML20154S418 + (03:45:18, 11 December 2024)
- ML20154S417 + (03:45:18, 11 December 2024)
- ML20154S413 + (03:45:22, 11 December 2024)
- ML20154S414 + (03:45:22, 11 December 2024)
- ML20154S411 + (03:45:23, 11 December 2024)
- ML20154S407 + (03:45:24, 11 December 2024)
- ML20154S410 + (03:45:24, 11 December 2024)
- ML20154S401 + (03:45:25, 11 December 2024)
- ML20154S400 + (03:45:26, 11 December 2024)
- ML20154S399 + (03:45:26, 11 December 2024)
- ML20154S398 + (03:45:27, 11 December 2024)
- ML20154S396 + (03:45:28, 11 December 2024)
- ML20154S392 + (03:45:33, 11 December 2024)
- ML20154S391 + (03:45:34, 11 December 2024)
- ML20154S390 + (03:45:35, 11 December 2024)
- NOC-AE-000340, Submits Rev to Request for Enforcement Discretion for TS 3.0.3 as It Applies to Operability Requirements for Fuel Handling Bldg HVAC + (03:45:35, 11 December 2024)
- 05000348/LER-1986-004, :on 860228,while Operating in steady-state at 99% Power,Reactor Trip Occurred Due to High Negative Flux Rate Detected by Power Range Nuclear Detectors.Caused by Dropped Control Rod.Fuses Replaced + (03:45:37, 11 December 2024)
- ML20154S386 + (03:45:38, 11 December 2024)
- ML20154S385 + (03:45:39, 11 December 2024)
- ML20154S382 + (03:45:40, 11 December 2024)
- ML20154S384 + (03:45:40, 11 December 2024)
- 05000250/LER-1986-009, :on 860224,w/unit at 100% power,in-depth Review of Important Plant Sys Determined Potential Concern W/Component Cooling Water Flow Through RHR Hxs.Tests Performed to Gather Data for Sys Alignment + (03:45:42, 11 December 2024)
- ML20154S376 + (03:45:43, 11 December 2024)
- IR 05000193/1988003 + (03:45:44, 11 December 2024)
- 2CAN109804, Requests Temporary Relief to Allow non-code Repair of Piping as Required by GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping + (03:45:45, 11 December 2024)
- 05000528/LER-1986-013, :on 860221,spurious High Radiation Signal on Spent Fuel Pool Area Radiation Monitor RU-31 Occurred, Resulting in ESF Actuation.Caused by Electrical Noise in Grounding Sys.Design Change Implemented + (03:45:47, 11 December 2024)