Forwards ACRS 860317 Rept Re 860131 Earthquake Which Occurred Near Site,For Comments.Input on Plans & Schedule W/Respect to Recommendations Made in Rept Re Use of Sensitive Seismological Instruments Requested
ML20154S390
Person / Time
Site: Perry 
Issue date: 03/20/1986
From: Butler W
Office of Nuclear Reactor Regulation
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8604010126
Download: ML20154S390 (3)


Text

.

IlAR 2 0 WOS Docket No. 50-440 Mr. Murray R. Edelman Vice President - Nuclear Group The Clevland Electric Illuminating Company P.O. Box 5000 Clevland, Ohio 44101

Dear Mr. Edelman:

SUBJECT:

ACRS REPORT ON THE PERRY NUCLEAR POWER PLANT, UNIT 1 Enclosed for your comments is the ACRS March 17, 1986 report to the Chairman of the Nuclear Regulatory Commission regarding the earthquake event which occurred near the Perry Nuclear Power Plant site on January 31, 1986. We particularly would like input on your plans and schedule with respect to the recommandation made in that report regarding the use of sensitive seismological instruments over the next few years for the assessment of any connection between the chemical waste injection wells and the January 31, 1986 earthquake event.

It is requested that you advise the Perry Project Manager (John J. Stefano),

within one week after receipt of this letter, of your comments on the enclosed report, and of your plans and schedule for the seismological monitoring of the injection wells.

Sincerely, Orfdantmen.e3,-

Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc: See next page Distribution Docket File.

ACRS (10)

NRC PDR JPartlow Local PDR BGrimes NSIC EJordan PD#4 Reading RBernero RHouston RRus brook JS fano i

D PD#4

\\

l ano:dh WButler b 3 7/86 3/p/86 8604010126 860320 PDR ADOCK 05000440 0

PDR

Q WE!

/

o,,

UNITED STATES NUCLEAR REGULATORY COMMISSION o

.E WASHINGTON, D. C. 20555

\\*****/

NAR 2 01966 Docket No. 50-440 Mr. Murray R. Edelman Vice President - Nuclear Group The Clevland Electric Illuminating Company P.O. Box 5000 Clevland, Ohio 44101

Dear Mr. Edelman:

SUBJECT:

ACRS REPORT ON THE PERRY NUCLEAR POWER PLANT, UNIT 1 Enclosed for your comments is the ACRS March 17, 1986 report to the Chairman of the Nuclear Regulatory Commission regarding the earthquake event which occurred near the Perry Nuclear Power Plant site on January 31, 1986. We particularly would like input on your plans and schedule with respect to the recoannendation made in that report regarding the use of sensitive seismological instruments over the next few years for the assessment of any connection between the chemical waste injection wells and the January 31, 1986 earthquake event.

It is requested that you advise the Perry Project Manager (John J. Stefano),

within one week after receipt of this letter, of your comments on the enclosed report, and of your plans and schedule for the seismological monitoring of the injection wells.

Sincerely, Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc: See next page

Mr. Murray R. Edelman Perry Nuclear Power Plant The Cleve16nd Electric Units 1 and 2

/

Illuminating Company cc:

Jay Silberg, Esq.

Mr. Larry O. Beck Shaw, Pittman, E Trowbridge The Clevelano Electric 1800 M Street, H. t!.

Illuminating Company liashington, D. C.

20006 P. O. Box 97 E-210 Perry, (thio 44081 Donald H. Hauser, Esq.

The Cleveland Electric Mr. James H. Harris, Director, Illuminating Company Division of Power Generation P. O. Box 500L Ohio Department of Industrial Relations Cleveland, Ohio 44101 -

2323 West 5th Avenue Post Office Box 825 Pesident Inspector,s Off1cc Columbus, Ohio 43216 U. S. Nuclear Regulatory Commissior.

Parmly at Center Road Ferry, Chic 44081 Regional Administrator, Regico III O. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illir.cis 60137 Donald T. E::ene, Esq.

Assistant Prosecuting Attorney 105 Main Street Lake County Administration Center Pairesville, Ohio 44077 Ms. Sue Hiatt OCRE Interim Representative 8275 Nunson Nentor, Chic 44060 Terry J. Lodge, Esq.

618 H. Hichigan Street Suite 105 Toledo, Chic A3624 Jchn G. Cardinal, Esq.

Prosecuting Attorney Ashtabula Ccenty Courthouse Jefferson, Ohio 44047

____,,.-p_,

.... i rRC'ACRS WASHItGTON DC Y

UN!TsD aTATe3 e**

'f NUCLEAR REGULATORY COMMIS$10N ADVla0RY COMMITTEE ON REACTOR SAFEQUARDr, g

wAsneessToad, o.c. zones March 17, 1986 Honorable Nunzio J. Palladino.

Chairman U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Dr. Palladino:

SUBJECT:

ACRS REPORT ON THE PERRY NUCLEAR POWER PLANT, UNIT 1 During its 311th meeting, March 13-15, 1986, the Advisory Comittee on Reactor Safeguards discussed the Ohio earthquake which occurred on January 31, 1986 and reviewed its implications with respect to the Perry Nuclear Power Plant, Unit 1.

A meeting of the Subcommittee on Extreme External Phenomena was held on March 12, 1986 to consider this matter.

The Reactor Operations Subcommittee discussed this matter during a meeting on February 12, 1986 and the full Comittee was briefed during the 310th ACR5 meeting, February 13-15, 1986. During our review, we had the benefit of discussions with representatives of The Cleveland Elec-tric Illuminating (Company (Applicant), the NRC Staff, and the Geological Survey USGS) Staff.

We also had the benefit of the docu-We com-ments referenced and coments from several ACR5 consultants.

mented on the application for a license to operate.this plant on July l

13, 1982.

This earthquake occurred near tercy Ohio, and was characterized by relatively low energy, low velocities, small displacements, a short duration, and a response spectrum rich in high frequencies.

Except at the relatively less significant high frequencies,ithe excitation of the plant structures and equipment was much less than that considered in the seismic design basis.

No significant damage was observed at the Perry plant in the inspections which were performed by the Applicant and the NRC Staff." The Cieveland Electric Illuminating Company, by using analysis and comparisons with prior qualification testing, has found that all the structures and l

equiment analyzed thus far have substantial margins of safety relative l

to tie loads and stresses induced by the earthquate. The NRC Staff and our consultants concur in that conclusion.

The NRC Staff has several confirmatory actions that it will require of These con-the Applicant prior to operation above 5 percent power.

firmatory actions include the analyses of a large sample of equipment.

We support the NRC Staff's proposed confirmatory actions.

There currently exists some possibility that the January 31, 1986 earthquake is related to deep well injection activities that took place between the Perry plant site and the town of Leroy or to solution mining 2-d/-W -.

~

Honorable Nunzio J. Palladino

. v' March 17, 1986 that took place in this area.

USGS to evaluate these hypotheses to see if there rea ly may be aThe NRC Staff has enga11e connection and, if so, whether there is any likelihood of substantia larger ear,thquakes in the future.

causal informed as to the progress of the USGS work.The NRC Staff will keep the ACRS y

One of the ACR5 consultants suggested that monitoring with se assessing the possible causal connection betw ve and the January 31 1986 earthquake.

Therefore, unless the USGS and the NRC are no causal connection or that earthquakes of a ma of concern can be ruled out from this cause,gnitude sufficient to be s

Cleveland Electric Illuminating Company assure that we recomend that The sensitive monitoring be continued over the next few years. appropriately We agree with the NRC Staff that the January design of the Perry plant's structure or its equipmen 31, 1986 earthquake is infomation developed in these Based on the meetings and considering the above coments, we find no reason to alter the conclusions stated in the Comittee's report dated July 13, 1982 regarding operation of this nuclear plant.

Sincerely, h

a David A. Ward Chairman

References:

1.

The~ Cleveland Electric Illuminating

Company,

" Seismic Event Letter dated March 5 Evaluation Report, Perry Nuclear Pcwer 2.

1986 from Robert M.

, Division of BWR Licens,ing

NRC, Bernero, Director,

Subject:

to David Ward, Chairman 4 ACRS, Perry Seismic Safety Evaluation, with attached Safety Evaluation Report dated March 1986 i

\\

\\

i

{

-