ML20154S446

From kanterella
Jump to navigation Jump to search
Forwards SER for Completion of Lower Core Support Assembly & Lower Head Defueling for NRC Review & Approval.Ser Encompasses Removal of Elliptical Flow Distributor,Gusseted Incore Quide Tubes & Subsequent Defueling.Fee Paid
ML20154S446
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/06/1988
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154S451 List:
References
4410-88-L-0006, 4410-88-L-6, NUDOCS 8806090070
Download: ML20154S446 (1)


Text

.f GPU Nuclear Corporation h NQgIgf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

(717) 948-8461 June 6, 1988 4410-88-L-0006/0253P US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sirs:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Safety Evaluation Report for Completion of Lower Core Support Assembly and Lower Head Defueling Attached for NRC review and approval is the Safety Evaluation Report (SER) for Completion of Lower Core Support Assembly and Lower Head Defueling. This SER encompasses the renoval of the elliptical flow distributor, gusseted incore guide tubes, and subsequent defueling of the Reactor Vessel lower head.

Per the requirements of 10 CFR 170, an application fee of $150.00 is enclosed.

Sincerely, p

p y

F. R. Standerfer Director, TMI-2 7

RDW/ emf Attachment Enclosed: GPU Nuclear Corp. Check. No. 012621 cc: Senior Resident Inspector, TMI - R. J. Conte

(

Regional Administrator, Region 1 - W. T. Russell f

Director, Plant Directorate IV - J. F. Stolz Systems Engineer, TMI Site - L. H. Thonus

j p[c6ech 4 OP6 GPU Nuclear Corooration is a subsidiary of the General Public Utilities Corporation 8806090070 880606 PDR ADOCK 05000320 rp DCD