Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16162A284 + (03:19:20, 10 January 2025)
- ML16161B201 + (03:20:28, 10 January 2025)
- ML16161B194 + (03:20:34, 10 January 2025)
- ML16162A280 + (03:19:24, 10 January 2025)
- ML16161B198 + (03:20:31, 10 January 2025)
- 05000348/LER-2016-001, Regarding Condition Prohibited by Technical Specifications Due to 600V Load Center Inoperable Longer than Allowed by Technical Specifications + (03:20:09, 10 January 2025)
- IR 05000269/1980026 + (03:20:29, 10 January 2025)
- 05000270/LER-1979-004-03, /03L-0 on 790615:RCS Leakage Observed & Unit Shut Down for Repairs.Caused by Leak on Packing on Pressurizer Spray Control Bypass Valve.Valve Was Backseated & Leakage Terminated + (03:19:27, 10 January 2025)
- ML16162A297 + (03:19:12, 10 January 2025)
- ML16162A288 + (03:19:18, 10 January 2025)
- NL-16-0810, Submittal of Post Accident Monitoring Report + (03:20:19, 10 January 2025)
- ONS-2016-048, Ufsar/Selected Licensee Commitment Change + (03:20:03, 10 January 2025)
- ML16162A170 + (03:19:36, 10 January 2025)
- Press Release-IV-16-013, NRC Will Hold an Open House on Comanche Peak Nuclear Plant Performance + (03:20:04, 10 January 2025)
- ML16162A211 + (03:19:30, 10 January 2025)
- ML16162A013 + (03:20:05, 10 January 2025)
- ML16162A014 + (03:20:05, 10 January 2025)
- L-16-096, Transmittal of 2015 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models and Commitment Change Related to Revised Peak Cladding Temperature Analysis + (03:19:31, 10 January 2025)
- ML16162A169 + (03:19:36, 10 January 2025)
- ML16162A101 + (03:19:48, 10 January 2025)
- ML16162A167 + (03:19:38, 10 January 2025)
- ML16162A168 + (03:19:37, 10 January 2025)
- IR 05000333/2016007 + (03:20:02, 10 January 2025)
- IR 05000482/2016007 + (03:19:46, 10 January 2025)
- IR 05000313/2016007 + (03:20:07, 10 January 2025)
- ML16161B191 + (03:20:36, 10 January 2025)
- IR 05000424/2016502 + (03:21:36, 10 January 2025)
- GNRO-2016/00032, NRC Form 536 Revision June 2016 + (03:21:34, 10 January 2025)
- 05000269/LER-1979-029-03, /03L-0:on 790902,reactor Vessel Head Flange Leaked Slightly.Caused by Improper Installation of Incorrect O-rings.Installation Procedures Revised to Assure That Correct O-rings Are Used & Properly Installed + (03:21:30, 10 January 2025)
- IR 05000269/1988011 + (03:21:37, 10 January 2025)
- ML16161B079 + (03:21:16, 10 January 2025)
- ML16161B112 + (03:21:00, 10 January 2025)
- ML16161B033 + (03:21:34, 10 January 2025)
- ML16161B093 + (03:21:07, 10 January 2025)
- ML16161B159 + (03:20:43, 10 January 2025)
- ML16161A989 + (03:21:46, 10 January 2025)
- ML16161B188 + (03:20:37, 10 January 2025)
- ML16161B073 + (03:21:21, 10 January 2025)
- ML16161B085 + (03:21:12, 10 January 2025)
- ML16161B127 + (03:20:48, 10 January 2025)
- PNO-II-80-024, on 800213,during Hydrostatic Testing of Unit 1 RCS Following Refueling Leakage Discovered from Manway Gaskets on Steam Generator A.Investigation Revealed Improper Gaskets Installed on Units 1,2 & 3 + (03:20:58, 10 January 2025)
- ML16161B182 + (03:20:38, 10 January 2025)
- ML16161A991 + (03:21:45, 10 January 2025)
- ML16161B113 + (03:20:59, 10 January 2025)
- ML16161B107 + (03:21:03, 10 January 2025)
- ML16161B120 + (03:20:51, 10 January 2025)
- ML16161B119 + (03:20:52, 10 January 2025)
- ML16161A992 + (03:21:43, 10 January 2025)
- ML16161B078 + (03:21:17, 10 January 2025)
- ML16161B086 + (03:21:11, 10 January 2025)
- ML16161B128 + (03:20:47, 10 January 2025)