ML16161B073

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-17,Revision 1, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Response Required
ML16161B073
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/29/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
References
NUDOCS 7911150153
Download: ML16161B073 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 2

101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 OCT 2 9 1979 In Reply Refer To:

RII:JPO 50-269 50-270 50-287 Duke Power Company Attn:

W. 0. Parker, Jr.

Vice President, Steam Production P. 0. Box 2178 Charlotte, North Carolina 28242 Gentlemen:

The enclosed Bulletin No. 79-17, Revision 1 is forwarded to you for action. A written response is required. If you desire additional information regarding this matter, please contact this office.

Sincerely, James P. O'Reilly Director

Enclosure:

IE Bulletin No. 79-17, Revision 1 w/encls.

S911150 0

OCT 2 9 1979 Duke Power Company

-2 cc w/encl:

J. E. Smith, Station Manager Post Office Box 1175 Seneca, South Carolina 29678