ML16162A013

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Columbia Generating Station, Acceptance of Requested Licensing Action: CAC No. MF7699 License Amendment Request Modify Technical Specification (TS) Surveillance Requirements (SR)
ML16162A013
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/09/2016
From: John Klos
Plant Licensing Branch IV
To: Linda Williams
Energy Northwest
References
MF7699
Download: ML16162A013 (2)


Text

1 NRR-PMDAPEm Resource From:

Klos, John Sent:

Thursday, June 09, 2016 3:35 PM To:

Williams, Lisa L.

Cc:

Klos, John; Garcia, Richard M.

Subject:

Columbia Generating Station, Acceptance of Requested Licensing Action: CAC No.

MF7699 License Amendment Request Modify Technical Specification (TS) Surveillance Requirements (SR)

Ms. Williams, By letter dated May 10, 2016. Energy Northwest for Columbia Generating Station submitted a license amendment request concerning a change in the safety function lift setpoint tolerances for the Safety/Relief Valves (SRVs) that are listed in Surveillance Requirements (SRs) 3.4.3.1 and 3.4.4.1 of the TS.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staffs acceptance review of this license amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Thank you, John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax)

John.Klos@NRC.gov

Hearing Identifier:

NRR_PMDA Email Number:

2893 Mail Envelope Properties (886bc589d3fd4a26aff0eae1e27b054e)

Subject:

Columbia Generating Station, Acceptance of Requested Licensing Action: CAC No. MF7699 License Amendment Request Modify Technical Specification (TS) Surveillance Requirements (SR)

Sent Date:

6/9/2016 3:34:54 PM Received Date:

6/9/2016 3:34:55 PM From:

Klos, John Created By:

John.Klos@nrc.gov Recipients:

"Klos, John" <John.Klos@nrc.gov>

Tracking Status: None "Garcia, Richard M." <rmgarcia@energy-northwest.com>

Tracking Status: None "Williams, Lisa L." <llwilliams@energy-northwest.com>

Tracking Status: None Post Office:

HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 1972 6/9/2016 3:34:55 PM Options Priority:

Standard Return Notification:

Yes Reply Requested:

Yes Sensitivity:

Normal Expiration Date:

Recipients Received: