ML16161B198

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/80-26,50-270/80-23 & 50-287/80-20 on 800709-10.No Noncompliance Noted
ML16161B198
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/31/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML16161B199 List:
References
NUDOCS 8008220040
Download: ML16161B198 (2)


See also: IR 05000269/1980026

Text

o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

JUL 3 1 1980

In Reply Refer To:

RII:DJP

50-269/80-26

50-270/80-23

50-287/80-20

Duke Power Company

ATTN:

W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by D. J. Perrotti of this office on

July 9-10, 1980, of activities authorized by NRC Operating License Nos. DPR-38,

DPR-47 and DPR-55 for the Oconee facility, and to the discussion of our findings

held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it

is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

  • ip

to

f

Fuel Faci ity and Materials

Safety Branch

Enclosure:

(See Page 2)

80082200

Duke Power Company

-2

Enclosure:

Inspection Report Nos. 50-269/80-26,

50-270/80-23 and 50-287/80-20

cc w/encl:

J. E. Smith, Station Manager