Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199B090 + (13:43:58, 10 December 2024)
- ML20199B089 + (13:43:59, 10 December 2024)
- ML20199B088 + (13:43:59, 10 December 2024)
- B16581, Monthly Operating Rept for Oct 1997 for Mnps,Unit 3 + (13:44:00, 10 December 2024)
- ML20199B084 + (13:44:00, 10 December 2024)
- ML20199B081 + (13:44:01, 10 December 2024)
- ML20199B079 + (13:44:02, 10 December 2024)
- ML20199B078 + (13:44:02, 10 December 2024)
- ML20199B077 + (13:44:03, 10 December 2024)
- ML20199B076 + (13:44:04, 10 December 2024)
- 05000289/LER-1997-010-01, :on 971012,PORV Inoperability Was Determined. Caused by mis-wiring & Failure to Perform post-maintenance Test Following Replacement During 11R Refueling Outage.Porv Replaced During 12R Refueling Outage Was Wired Correctly + (13:44:06, 10 December 2024)
- ML20199B073 + (13:44:07, 10 December 2024)
- ML20199B071 + (13:44:08, 10 December 2024)
- ML20199B068 + (13:44:09, 10 December 2024)
- ML20199B070 + (13:44:09, 10 December 2024)
- RBG-44355, Cycle 8 Startup Physics Test Summary + (13:44:10, 10 December 2024)
- ML20199B066 + (13:44:10, 10 December 2024)
- ML20199B064 + (13:44:11, 10 December 2024)
- 05000289/LER-1997-010, Forwards LER 97-010-00,concerning Inoperable PORV Resulting from Violation of TS 4.2.2,in that,post-maintenance Test Was Not Performed on PORV Following Replacement During 11R Refueling + (13:44:12, 10 December 2024)
- ML20199B062 + (13:44:12, 10 December 2024)
- ML20199B060 + (13:44:13, 10 December 2024)
- ML20199B059 + (13:44:13, 10 December 2024)
- ML20199B058 + (13:44:14, 10 December 2024)
- ML20199B057 + (13:44:15, 10 December 2024)
- ML20199B056 + (13:44:15, 10 December 2024)
- ML20199B054 + (13:44:16, 10 December 2024)
- ML20199B052 + (13:44:17, 10 December 2024)
- ML20199B053 + (13:44:17, 10 December 2024)
- HL-5555, Informs That Util Reviewed Attached Rev 0 to GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 & Concurs W/Analysis & Conclusions + (13:44:21, 10 December 2024)
- ML20199B049 + (13:44:21, 10 December 2024)
- ML20199B047 + (13:44:22, 10 December 2024)
- ML20199B046 + (13:44:22, 10 December 2024)
- ML20199B045 + (13:44:23, 10 December 2024)
- ML20199B039 + (13:44:24, 10 December 2024)
- ML20199B042 + (13:44:24, 10 December 2024)
- ST-HL-AE-5780, Forwards Response to 970912 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. W/38 Oversize Drawings + (13:44:25, 10 December 2024)
- ML20199B037 + (13:44:26, 10 December 2024)
- ML20199B036 + (13:44:27, 10 December 2024)
- ML20199B035 + (13:44:27, 10 December 2024)
- ML20199B034 + (13:44:28, 10 December 2024)
- ML20199B033 + (13:44:29, 10 December 2024)
- ML20199B032 + (13:44:29, 10 December 2024)
- ML20199B031 + (13:44:30, 10 December 2024)
- ML20199B030 + (13:44:30, 10 December 2024)
- ML20199B027 + (13:44:31, 10 December 2024)
- ML20199B024 + (13:44:32, 10 December 2024)
- ML20199B023 + (13:44:32, 10 December 2024)
- NSD-NRC-97-5434, Forwards Vols 1, Appendices to DOE/ID-10541, 2, Addenda to DOE/ID-10541,-10503,-10504 of DOE Rept,Dtd Oct 1997 & White Paper, Effects of Containment Spray on AP600 Level 2 PRA Hydrogen Analysis + (13:44:33, 10 December 2024)
- ML20199B021 + (13:44:33, 10 December 2024)
- ML20199B020 + (13:44:34, 10 December 2024)
- NOC-AE-000064, Forwards Response to Violations Noted in Insp Repts 50-498/97-24 & 50-499/97-24.Corrective Actions:Scheduled Setpoint Improvement Program Safety Related & Important to Safety Scope of Work Will Be Completed by 981231 + (13:44:35, 10 December 2024)