Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19320D456 + (08:07:24, 1 January 2025)
- ML19320D455 + (08:07:27, 1 January 2025)
- PM-80-709, Ro:On 800711,Unit 1 LPCI Inverter Tripped & Unit 2 4-kV Bus 2F Supply Breaker & HPCI Tripped.Supply Breaker Trip Caused by Jumper Missing from Neutral Leg.Motor Valve on HPCI Replaced Making It Operable.Events Submitted Per Ieb 80-17 + (08:07:29, 1 January 2025)
- ML19320D453 + (08:08:27, 1 January 2025)
- ML19320D452 + (08:08:30, 1 January 2025)
- ML19320D450 + (08:08:32, 1 January 2025)
- 05000306/LER-1980-017-03, /03L-0:on 800615,during Normal Operation,Found One Charging Pump Out of Svc.Charge Pump 23 Started & Shut Down.Caused by Air Leaks on Speed Control Unit Due to Broken Packing Ring.Packing Ring Replaced + (08:08:34, 1 January 2025)
- 05000306/LER-1980-017, Forwards LER 80-017/03L-0 + (08:08:38, 1 January 2025)
- 05000278/LER-1980-014-03, /03L-0:on 800608,while Performing ST 6.9,valve Mo 3-10-26B Failed to Close After Stroked Open.Caused by Mechanical Problem in Valve.Mo 3-10-26B to Be Disassembled & Repaired + (08:08:41, 1 January 2025)
- ML19320D445 + (08:08:46, 1 January 2025)
- ML19320D443 + (08:08:47, 1 January 2025)
- ML19320D442 + (08:08:48, 1 January 2025)
- ML19320D441 + (08:08:49, 1 January 2025)
- 05000321/LER-1980-076-01, /01T-0:on 800701,while Reactor Was at Hot Standby for Hpci/Reactor Core Isolation Cooling Testing,Site Notified by Ae That Listed RHR Supports Would Not Adequately Support All Design Based Loads + (08:08:52, 1 January 2025)
- 05000321/LER-1980-076, Forwards LER 80-076/01T-0 + (08:08:56, 1 January 2025)
- ML19320D437 + (08:09:03, 1 January 2025)
- ML19320D435 + (08:09:05, 1 January 2025)
- ML19320D434 + (08:09:06, 1 January 2025)
- ML19320D433 + (08:09:08, 1 January 2025)
- ML19320D432 + (08:09:11, 1 January 2025)
- ML19320D431 + (08:09:13, 1 January 2025)
- ML19320D430 + (08:09:16, 1 January 2025)
- ML19320D429 + (08:09:18, 1 January 2025)
- ML19320D428 + (08:09:20, 1 January 2025)
- ML19320D427 + (08:09:22, 1 January 2025)
- TXX-3162, Updates 800421 Deficiency Rept Re Discrepancies Involving Installation & Insp Requirements for Class 5 non-nuclear safety-related Piping Supports.Fsar Is Being Revised.Final Rept Will Be Forwarded by 800922 + (08:09:23, 1 January 2025)
- ML19320D425 + (08:09:29, 1 January 2025)
- ML19320D424 + (08:09:31, 1 January 2025)
- ML19320D423 + (08:09:36, 1 January 2025)
- ML19320D422 + (08:09:38, 1 January 2025)
- ML19320D421 + (08:09:41, 1 January 2025)
- ML19320D420 + (08:09:44, 1 January 2025)
- ML19320D419 + (08:09:46, 1 January 2025)
- IR 05000352/1979012 + (08:09:53, 1 January 2025)
- ML19320D417 + (08:09:56, 1 January 2025)
- ML19320D416 + (08:09:59, 1 January 2025)
- ML19320D415 + (08:10:01, 1 January 2025)
- ML19320D413 + (08:10:04, 1 January 2025)
- ML19320D411 + (08:10:09, 1 January 2025)
- ML19320D410 + (08:10:12, 1 January 2025)
- IR 05000346/1980014 + (08:10:17, 1 January 2025)
- ML19320D407 + (08:10:20, 1 January 2025)
- ML19320D406 + (08:10:28, 1 January 2025)
- ML19320D405 + (08:10:30, 1 January 2025)
- ML19320D403 + (08:10:32, 1 January 2025)
- ML19320D401 + (08:10:34, 1 January 2025)
- ML19320D400 + (08:10:36, 1 January 2025)
- ML19320D398 + (08:10:38, 1 January 2025)
- ML19320D396 + (08:10:39, 1 January 2025)
- ML19320D395 + (08:10:44, 1 January 2025)
- ML19320D394 + (08:10:46, 1 January 2025)