Forwards IE Insp Repts 50-352/79-12 & 50-353/79-11 on 791120-30 & 1203-21 & Notice of Violation
ML19320D407
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/12/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML16341B393 List:
References
NUDOCS 8007210326
Download: ML19320D407 (2)


See also: IR 05000352/1979012

Text

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ .

3

.

,

-

UNITED STATES

o

NUCLEAR REGULATORY COMMisslON

g

o

REGION l

$

$

631 PAR K AVENUE

W

f

KING OP PRUSSIA. PENNSYLVANIA 19406

,/

p ' 2 El

Docket Nos. 50-352

50-353

g

v

Philadelph a Electric Company

ATTN: Mr. John S. Kemper

Vice President

-Engineering and Research

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Inspection 50-352/79-12 and 50-353/79-11

This refers to the inspection conducted by Mr. J. Mattia of this office on

November 20-30 and December 3-21, 1979, at the Limerick Generating Station,

Units 1 and 2, Limerick, Pennsylvania, of activities authorized by NRC License

Nos. CPPR-106 and CPPR-107 and to the discussions of our findings held by Mr.

Mattia with Mr. Corcoran and other members of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your actLvi-

ties were not conducted in full compliance with NRC requirements, as set for.h

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corres-

pondence to you dated December 31, 1974. This notice is sent to you pursuant to

the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations. Section 2.201 requires you to submit to this

office, within thirty (30) days of your receipt of this notice, a written state-

ment or explanation in reply including:

(1) corrective steps which have been

taken by you and the results achieved; (2) corrective steps which will be taken

to avoid f.

..ler items of noncompliance; and (3) the date when full compliance

will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

80072103 %

8

.

.

,

Philadelphia Electric Company

2

l

i

i

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

]

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons.

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

,

'

part of.the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

f

=_ -

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

'

Enclosures:

l.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement. Inspection

Report Numbers 50-352/79-12 and 50-353/79-11

cc w/encls:

V. S. Boyer, Senior Vice President, Nuclear Power

.

.

.

,

. .