Monthly Operating Rept for June 1980
ML19320D445
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/02/1980
From: Howlett G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML19320D444 List:
References
NUDOCS 8007210375
Download: ML19320D445 (5)


Text

.

h orERTTING DATA REPORT 50-336 DOCKETDtTE JuTy 4, _980 NO. 1 COi!PLETED BY G.H. Howlett T ELEPliONE (203)447-'1791 X364 OPERATING ST A TUS

1. Unit Name: Millsto_ne 2 Notes
  • Items 21 & 22,
2. Reportin; Period: June 1980 cumulative are computed 2700 using a weighted average.
3. Licensed Thermal Pov.er t.stwrl:
4. Namep!.ite Rating (Gross AlWe): 909
5. De>i;n Electrical Rating (Net 3the): 870
6. Stasimum Dependable Capacity (Gross 31We): 895
7. \ 1asimum Dependable Capacity (Net 31We): 864
5. If Charps Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Gise P.easons:

one

9. Power Lesel To which Restricted.If AngetWep: 3:
10. Reasons For Restrictions. If Any:

This 31onth Yr..to-Date Cumulative .,

11. Ifours in Reporting Period 720 4,367 39,575
12. Number Of Hours Reactor Was Critical 178 3,182.6 _ 28,261./
13. Reactor Resene Shutdown Ifours 0 0 2,072.4
14. Hours Generator On.Line 163 26,916.9 3.096.7
15. Unit Resene Shutdown Hours 0 0 336.4
16. Gross Thermal Energy Generated (.\iWil) 404,890 8,161,936 65,860,564 .
17. Gross Electrical Energy Generated (.\lWH; 134,199 2,671,b// 21,zb6,z22
18. Net Electrical Energy Generated (31WH) 125,626 2,564,753 20,345,011
19. Unit Senice Factor 22.6 70.9 68.0
20. Unit Availability Factor 22.6 70.9 68.9
21. Unit Capacity Factor (Using Af DC Neti 20.2 68 1
  • 62.5
22. Unit Capacity Factor (Using DER Net) 20.1 67.5
  • 61.3
23. Unit Forced Outage Rate 77.4 29 1 24 D
24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date.and Duration of Eachi:

Refueling, August 2, 1980, 9 Weeks

25. If Shut Down A: End Of Report Period. Estimated Date of Startup:
26. Units In Test Status iPrior to Commercial Operation 1: Forecast Achiesed INITI AL CRITICALITY N/A N/A INITI AL ELECTRICI 'Y N/A N/A CO\!\!ERCI A L OPER A TION N/A N/A p4:~ 7 )

80 07210395 ~

. . +'

's .

AVER AGE DAILY L" NIT POhER LEVEL DOCKET NO. 50-336

. UNIT Millstone 2 DATE 7/4/80 COMPLETED BY G.H. Howlett TELEPHONE (203)447-1791X364

-MONTH June 1980 DAY . AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) iMWe Net) 0- -(-5) 0 (-4)

' 37 2 0 (-5)- ig 0 (-5) 3 0 (-5) 39 0 (-5) 4 0 (-5) ,o 0 (-5) 3 0 (-5)  ;,

0 (-6) 6 0 (-5) 22 0 (-13) 7 0- (-5) 0 (-26) 23 -

3 -0 (-5) 24 445 9 0 (-5) 25 722 to 0 -(-4) '6 758 11 0 (-5) ,,

861

~'

0' (-5) 864 12 28

. 13' 0 (-5)' ,, 864 14 0 (-5) 3,.

863-

- 15 0 (-5) 3, _

.16 0 (-5)

~ INSTRUCTIONS On this format. list the aserage daily unit power leselin MWe Net for cach day in the repurr;n; m.> nth. C.in; pare to the nearest whole megawait.

-~(9177 -

l l

'I 1

. . _ . . __j

t Docket- No. 50-336 Page 1 'of 1 Date July 4, 1980 Unit Nane Millstone 2 -

Completed By G.H. Howlett-Telephone (203) 447-1791 X364

. CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month May 1980 DATE SYSTEM COMPONENT MAINTENANCE ACfl0N 4/11/80 High Pressure Safety HPSI Pump, P-41B Realigned pump to motor.

Injection 5/1/80 Diesel Generator D/G H-7A Starting Air Flask Rebuilt leaking valves.

Isclation Valves, 2-D/G-34A & 34B 5/12/80 Reactor Coolant Reactor Coolant Pump P-40A Replaced pump seal cartridge.

5/15/30 Reactor Coolant Reictor Coolant Pump, P-408 Replaced pump seal cartridge.

5/16/80 Reactor Coolant Reactor vent to Enclosure Rebuilt valve.

Building Filtration System Isolation, 2-RC-039 5/16/80 Reactor Coolant Pressurizer Relief Line vent Rebuilt valve.

isolation, 2-RC-021 5/19/80 Safety Injection HPSI Pump P-41B Discharge Drain Repaired leaking valve.

Valve, 2-SI-026 5/28/80 Safety Injection HPSI Pump P-41A casing drain Replace valve.

isolation valve, 2-SI-032 5/28/80 Chemical & Volume RWST to Charging Pump Suction Rebuilt valve.

Control Check Valve, 2-CH-199 r

a _. _ . . . . _ _ _ - ..g-s DOCKET NO. 50-336 UNITSilUTDOWNS AND POWER REDUCTIONS UNIT NAME ' MilIstone 2 DATE July 4,1980 COMPLETED BY G.H. Howlett REPORT MONTil June 1980 TELEPHONE (2UJ} 447-1791X364 n.

, .3 g 3 Y Licensee ,E r, n. Cauw & Corrective No. DJie g 3g s 2s5 Event gg gO3 Action to

  • 5 jg Report a mO Prevent Recurrence

$5 g 6

9 800508 F 557.0 .D 1 Continuation from previous months outage for seismic reevaluation and modification of pipe. supports per I&C Bulletin 79-02.

i l

Summary: The unit was shut down through the 22nd, went critical on the 23rd and returned on line on the P4th, with resultant full power operations from the 27th through the 30th.

I'8/77)

4

--**' Dockst Ns. 50-336 Date: July 9, 1980 Completed By: G.H. Howlett III Telephone: 203/447-1971 X364 REFUELING INFORMATION REQUEST

1. Name of facility: Millstone 2
2. Scheduled date for next refueling shutdown: August 2, 1980
3. Schedule date for restart following refueling: September 28, 1980
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Technical Specification changes will be necessary as a result of

.the change in fuel and safety analysis supplier.

5. Scheduled date(s) for submitting licensing action and supporting information:

The schedule for submitting license action is as follows:

Basic Safety Report 3-6-80 Additional licensing documentation in support of cycle four (4) operation will be provided in response to Fuclear Regulatory Commission staff questions. ~

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Cycle 4 will be unique in that it will be the first s are the fuel and safety analysis will be supplied by Westinghouse.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: 217 (bl 144

8. The present licensed spent fuel pool st.,.' age capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

667

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present ifcensed capacity:

.1985, Spent Fuel Pool, full core off load capability is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles.