Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000278/LER-1980-010-03, /03L-0:on 800421,while Performing Surveillance Test,Lpci Injection valve,MO-3-10-25B,failed to Open.Caused by Lack of Guide Clearance Between Valve Disc & Valve Guide. Valve Was Repaired & Stroked Satisfactorily + (01:20:07, 1 January 2025)
- 05000325/LER-1980-045, Forwards LER 80-045/03L-0 + (01:20:12, 1 January 2025)
- ML19323F205 + (01:20:14, 1 January 2025)
- ML19323F204 + (01:20:16, 1 January 2025)
- ML19323F203 + (01:20:18, 1 January 2025)
- 05000324/LER-1980-041-03, /03L-0:on 800425,while Performing Reactor Low Water 2 & 3 Channel Calibr & Functional Check,Low Level Switch Actuated Below Tech Spec Limits.Caused by Instrument Drift.Switch Recalibr & Return to Svc + (01:20:20, 1 January 2025)
- 05000267/LER-1980-021-03, /03L-0:on 800421,w/reactor Shut Down,Main Steam Pressure Low Instrument Discovered Inoperable.Caused by Bad Connection Due to Dirty Contact.Contacts Cleaned & Module Returned to Svc + (01:20:24, 1 January 2025)
- 05000267/LER-1980-021, Forwards LER 80-021/03L-0 + (01:20:27, 1 January 2025)
- ML19323F197 + (01:20:29, 1 January 2025)
- 05000324/LER-1980-041, Forwards LER 80-041/03L-0 + (01:20:38, 1 January 2025)
- ML19323F191 + (01:20:41, 1 January 2025)
- AECM-80-102, Status Rept 5 of Potentially Reportable Deficiency Re Inadequate Circuit Separation.Investigation Expanded to Address Adequacy of GE Supplied Components & Control Room Panels.Final Rept by 801201 + (01:20:42, 1 January 2025)
- ML19323F188 + (01:20:46, 1 January 2025)
- ML19323F185 + (01:20:54, 1 January 2025)
- ML19323F184 + (01:20:57, 1 January 2025)
- 05000327/LER-1980-046-01, /01T-0:on 800509,environ Temp Effect on Main Steam Safety Valve Setpoints Not Considered in Design Analysis. Caused by Failure to Consider Environ Temp Variation.Design Evaluation Will Determine Corrective Actions Required + (01:21:02, 1 January 2025)
- ML19323F182 + (01:21:06, 1 January 2025)
- ML19323F180 + (01:21:08, 1 January 2025)
- ML19323F179 + (01:21:10, 1 January 2025)
- 05000327/LER-1980-046, Forwards LER 80-046/01T-0 + (01:21:13, 1 January 2025)
- ML19323F176 + (01:21:16, 1 January 2025)
- 05000366/LER-1980-075-03, /03L-0:on 800428 Core Max Fraction of Limiting Power Density in Excess of Tech Specs.Corrective Action Failed to Lower Power Density.Caused by Lower than Equilibrium Xenon Distribution During Startup + (01:21:19, 1 January 2025)
- ML19323F173 + (01:21:22, 1 January 2025)
- ML19323F172 + (01:21:24, 1 January 2025)
- ML19323F171 + (01:21:26, 1 January 2025)
- 05000366/LER-1980-075, Forwards LER 80-075/03L-0 + (01:21:30, 1 January 2025)
- ML19323F168 + (01:21:37, 1 January 2025)
- 05000333/LER-1980-040-03, /03L-0:on 800422,during Normal Operation,Lpci Independent Power Supply Inverter a Tripped.Caused by Gate Timing Card Failures.Gate Timing Card Was Replaced + (01:21:40, 1 January 2025)
- 05000259/LER-1980-034-03, /03L-0:on 800420,relay Coil 16AK-27 Failed,Causing Closure of Reactor Water Cleanup Isolation Valves FCV-69-2 & FCV-69-12.Valve FCV-69-1 Failed to Close Due to Loose & Broken Wire.Relay Coil Failure Caused by Normal Aging + (01:21:44, 1 January 2025)
- ML19323F163 + (01:21:46, 1 January 2025)
- 05000333/LER-1980-040, Forwards LER 80-040/03L-0 + (01:21:52, 1 January 2025)
- ML19323F159 + (01:21:54, 1 January 2025)
- 05000259/LER-1980-034, Forwards LER 80-034/03L-0 + (01:21:58, 1 January 2025)
- ML19323F156 + (01:22:01, 1 January 2025)
- ML19323F155 + (01:22:02, 1 January 2025)
- ML19323F154 + (01:22:03, 1 January 2025)
- ML19323F153 + (01:22:07, 1 January 2025)
- ML19323F150 + (01:22:09, 1 January 2025)
- ML19323F148 + (01:22:10, 1 January 2025)
- 05000338/LER-1980-040-03, /03L-0:on 800423,during Refueling Shutdown,Casing Cooling Tank Level Indicator LI-RS103A Found Out of Calibr. Caused by Bad Zenier Diode in Loop Power Supply Card.Card Replaced & Recalibr + (01:22:14, 1 January 2025)
- ML19323F146 + (01:22:16, 1 January 2025)
- ML19323F145 + (01:22:18, 1 January 2025)
- L-19-269, Report of ECCS Model Changes and Errors Pursuant to 10 CFR 50.46 + (01:22:21, 1 January 2025)
- 05000338/LER-1980-040, Forwards LER 80-040/03L-0 + (01:22:31, 1 January 2025)
- ML19323F140 + (01:22:33, 1 January 2025)
- ML19323F139 + (01:22:35, 1 January 2025)
- ML19323F136 + (01:23:31, 1 January 2025)
- ML19323F135 + (01:23:33, 1 January 2025)
- ML19323F134 + (01:23:36, 1 January 2025)
- ML19323F133 + (01:23:39, 1 January 2025)
- 05000339/LER-1980-001-03, /03L-0:on 800423,w/unit in Mode 6 Following Fuel Loading,Rhr Sys Inlet Valve MOV-2700 Ran Closed,Causing Loss of Operable RHR Loop.Caused by Blown Signal Comparator Card Power Supply Fuse in Process Control Sys.Card Replaced + (01:24:08, 1 January 2025)