NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 2, License Amendment Request for Measurement Uncertainty Recapture Power Uprate
ML19323F205
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/19/2019
From: Kimberly Green
Plant Licensing Branch II
To: Wells R
Tennessee Valley Authority
References
L-2019-LLS-0000
Download: ML19323F205 (3)


Text

From: Green, Kimberly Sent: Tuesday, November 19, 2019 10:26 AM To: Wells, Russell Douglas Cc: cedmondson@tva.gov; kdhulvey@tva.gov; Shoop, Undine

Subject:

Acceptance Review Results for Watts Bar Nuclear Plant, Unit 2, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (EPID L-2019-LLS-0000)

Dear Mr. Wells:

By letter dated October 10, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19283G117), Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Watts Bar Nuclear Plant (WBN), Unit 2. The proposed amendment would to increase the authorized core power level by approximately 1.4 percent rated thermal power from 3411 megawatts thermal (MWt) to 3459 MWt. Additionally, the proposed amendment would revise Technical Specification (TS) 1.1, Definitions, and TS 5.9.5b, Core Operating Limits Report (COLR).

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the proposed LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications.

The NRC staff has reviewed TVAs application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in TVAs submittal, the NRC staff has estimated that this licensing request will take approximately 1200 hours50 days <br />7.143 weeks <br />1.644 months <br /> to complete and that the review can be completed by October 30, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates will be communicated, during the routine interactions.

These estimates are based on the staffs initial review of the application and they could change, due to several factors including requests for additional information and unanticipated addition of scope to the review.

If you have any questions, please contact me at (301) 415-1627.

Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier: NRR_DRMA Email Number: 319 Mail Envelope Properties (MN2PR09MB401676E4F7267C97A753564E8F4C0)

Subject:

Acceptance Review Results for Watts Bar Nuclear Plant, Unit 2, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (EPID L-2019-LLS-0000)

Sent Date: 11/19/2019 10:25:41 AM Received Date: 11/19/2019 10:25:00 AM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:

"cedmondson@tva.gov" <cedmondson@tva.gov>

Tracking Status: None "kdhulvey@tva.gov" <kdhulvey@tva.gov>

Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>

Tracking Status: None "Wells, Russell Douglas" <rdwells0@tva.gov>

Tracking Status: None Post Office: MN2PR09MB4016.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3142 11/19/2019 10:25:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: