ML19323F153

From kanterella
Jump to navigation Jump to search
Ro:During Period of Core Alteration,Msiv Was Opened for Insp While Steam Generator Secondary Manway Was Removed
ML19323F153
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/19/1980
From: Yundt C
PORTLAND GENERAL ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
CPY-497-80, NUDOCS 8005280595
Download: ML19323F153 (1)


Text

_.. _. _... _ _

^

m a _mmm E

Portland General Electric Cornpany Troian Nuclear Plant P.O. Box 439 Rainier, Oregon 97048 May 19, 1980 (503)556-3713 CPY-497-60 Mr. R. H. Engelken, Director U. S. Nuclear Regulatory Coc: mission Region V 1990 North California Blvd.

Walnut Creek, California 94596

Dear Sir:

Subj ect:

Immediate Report of Reportable Occurrence This letter is to confirm the prompt report made to Mr. M. H. Malmros, Resident Inspector by Mr. W. S. Orser, Manager, Operations and Maintenance, Trojan Nuclear Plant concerning a situation where it could not be assured that containment integrity was maintained during refueling operations. During the period of core alteration, a main steam isolation valve was opened for inspection while a steam generator secondary manway was removed.

This occurrence will be reported to the Nuclear Regulatory Cornission as a Licensee Event Report in accordance with our established Technical Specifi-cations.

Sincerely, C.

. Yundt General Manager CFY/WSO:na c: LER Distribution V

i 8 005ggg g g

.