Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323F325 + (01:14:13, 1 January 2025)
- ML19323F324 + (01:14:15, 1 January 2025)
- 05000346/LER-1980-039-03, /03L-0:on 800423,Tech Specs Requirement Late Date Passed for Offsite Ac Sources Lineup & Available Weekly Test ST 5080.01.Caused by Oversight of Shift Supervisor When Test Not Indicated on Computer Printout Test Schedule + (01:14:20, 1 January 2025)
- ML19323F321 + (01:14:29, 1 January 2025)
- ML19323F320 + (01:14:31, 1 January 2025)
- 05000325/LER-1980-044-03, /03L-0:on 800422,while Swapping Suctions for Containment Atmosphere Control Monitor 1-CAC-AT-1263,RIP Valve X57-B Did Not Indicate Fully Closed.Caused by X57-B Binding.Cycling Alleviated Binding Problem + (01:14:35, 1 January 2025)
- ML19323F318 + (01:14:39, 1 January 2025)
- 05000346/LER-1980-039, Forwards LER 80-039/03L-0 + (01:14:48, 1 January 2025)
- 05000325/LER-1980-044, Forwards LER 80-044/03L-0 + (01:15:04, 1 January 2025)
- 05000338/LER-1980-042-01, /01T-0:on 800509,Westinghouse Informed Util That Following Secondary Side High Energy Line Rupture,Potential Exists for Charging Pumps to Be Damaged.Calculation Assessment Being Performed + (01:15:18, 1 January 2025)
- ML19323F308 + (01:15:26, 1 January 2025)
- ML19323F307 + (01:15:29, 1 January 2025)
- ML19323F305 + (01:15:30, 1 January 2025)
- 05000155/LER-1980-010-03, /03L-0:on 800423,intermittent Automatic Test Circuit Alarmed.Caused by Setpoint Drift in Conservative Direction on Reactor Level Transmitter.Unit Readjusted by Venting & Rezeroing Transmitter + (01:15:41, 1 January 2025)
- ML19323F302 + (01:15:43, 1 January 2025)
- 05000368/LER-1979-038, Forwards Updated LER 79-038/03X-1 + (01:15:45, 1 January 2025)
- 05000338/LER-1980-042, Forwards LER 80-042/01T-0 + (01:15:48, 1 January 2025)
- ML19323F290 + (01:16:08, 1 January 2025)
- ML19323F288 + (01:16:16, 1 January 2025)
- ML19323F287 + (01:16:18, 1 January 2025)
- 05000313/LER-1979-016, Forwards Updated LER 79-016/03X-1 + (01:16:42, 1 January 2025)
- ML19323F283 + (01:17:04, 1 January 2025)
- ML19323F282 + (01:17:06, 1 January 2025)
- ML19323F281 + (01:17:08, 1 January 2025)
- ML19323F278 + (01:17:40, 1 January 2025)
- ML19323F276 + (01:17:41, 1 January 2025)
- 05000265/LER-1980-011-03, /03L-0:on 800420,while Performing Manual Operation of Relief Valves,Valve 2-203-3C Failed to Open.Caused by Component Failure Due to Excessive Solenoid Plunger to Pilot Valve Stem Clearance + (01:17:46, 1 January 2025)
- ML19323F274 + (01:17:48, 1 January 2025)
- ML19323F272 + (01:17:49, 1 January 2025)
- ML19323F271 + (01:17:50, 1 January 2025)
- 05000265/LER-1980-011, Forwards LER 80-011/03L-0 + (01:17:53, 1 January 2025)
- ML19323F267 + (01:17:55, 1 January 2025)
- 05000324/LER-1978-058, Suppl to LER 78-058/03L-1:on 780630,while Performing Penetrant Test 2.1.26PC,I&C Technician Found Pressure Switch B21-PS-N015B Out of Calibr.Caused by Instrument Drift.Switch Recalibr.During Future Outage,Switch Will Be Replace + (01:17:57, 1 January 2025)
- ML19323F263 + (01:17:59, 1 January 2025)
- ML19323F260 + (01:18:10, 1 January 2025)
- AECM-80-101, Forwards Interim Deficiency Rept Re Damage to Intermediate Metallic Conduit from Adjustable Threading Dies + (01:18:11, 1 January 2025)
- ML19323F255 + (01:18:22, 1 January 2025)
- 05000259/LER-1980-035-03, /03L-0:on 800424,during Steady State Conditions, 1B Recirculation Pump Removed from Svc Due to Low Oil Level Alarm on Motor Upper Bearing.Caused by Shorted Wires.Wires Reinsulated & Motor Returned to Svc + (01:18:36, 1 January 2025)
- ML19323F251 + (01:18:39, 1 January 2025)
- ML19323F250 + (01:18:40, 1 January 2025)
- A00803, Application to Amend License DPR-65,submitted as Proposed Revision to Tech Specs,In Response to NRC . Summarizes Status of Implementation of Automatic Initiation of Auxiliary Feedwater.One Pump Sufficient + (01:18:41, 1 January 2025)
- 05000259/LER-1980-035, Forwards LER 80-035/03L-0 + (01:18:46, 1 January 2025)
- ML19323F242 + (01:18:52, 1 January 2025)
- ML19323F240 + (01:18:54, 1 January 2025)
- ML19323F239 + (01:18:55, 1 January 2025)
- 05000254/LER-1980-010-03, /03L-0:on 800423,while Performing Loss of Electrohydraulic Control Fluid Pressure Scram Surveillance, Pressure Switch 1-5600-PS-3 Tripped Below Tech Spec Limit. Caused by Instrument Setpoint Drift.Switch Adjusted + (01:18:57, 1 January 2025)
- 05000366/LER-1980-074-03, /03L-0:on 800427,core Max Fraction of Limiting Power Density Found in Excess of Tech Spec.Cause Not Stated. Average Power Range Monitor Adjusted,Power Reduced & Process Computer Updated,Run & Verified + (01:19:02, 1 January 2025)
- 05000259/LER-1980-039-01, /01T-0:on 800507,util Notified by GE That Qualification of Containment Atmospheric Monitoring Sys Hydrogen Sensors Has Not Been Demonstrated to Meet Purchase Specs.Operating Procedures & Instructions Changed + (01:19:08, 1 January 2025)
- ML19323F232 + (01:19:14, 1 January 2025)
- 05000254/LER-1980-010, Forwards LER 80-010/03L-0 + (01:19:17, 1 January 2025)
- 05000259/LER-1980-039, Forwards LER 80-039/01T-0 + (01:19:21, 1 January 2025)