Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248C324 + (23:32:52, 1 December 2024)
- ML20248C322 + (23:32:53, 1 December 2024)
- ML20248C321 + (23:32:53, 1 December 2024)
- ML20248C320 + (23:32:55, 1 December 2024)
- ML20248C313 + (23:32:56, 1 December 2024)
- 05000341/LER-1989-020, :on 890830,removal of Incorrect Fuse Caused Actuation of Standby Gas Treatment Sys Div I & Isolation of Reactor Bldg Hvac.Caused by Personnel Error.Critique of Event Conducted + (23:33:01, 1 December 2024)
- ML20248C308 + (23:33:02, 1 December 2024)
- ML20248C299 + (23:33:04, 1 December 2024)
- 3F0989-10, Provides Addl Info Re 890914 Meeting Concerning Integrated Schedules for Station Batteries,Second Level Undervoltage Relays & Configuration Mgt + (23:33:05, 1 December 2024)
- ML20248C295 + (23:33:07, 1 December 2024)
- ML20248C294 + (23:33:08, 1 December 2024)
- ML20248C292 + (23:33:09, 1 December 2024)
- 05000368/LER-1986-018, :on 860720,discovered Blowdown Pipe Missing Required Pipe Whip Restraint.Caused by Inadequate Control of Deviations from Design Requirements During Original Const. Pipe Whip Restraint Installed + (23:33:11, 1 December 2024)
- ML20248C289 + (23:33:12, 1 December 2024)
- ML20248C286 + (23:33:13, 1 December 2024)
- ML20248C285 + (23:33:13, 1 December 2024)
- ML20248C284 + (23:33:14, 1 December 2024)
- ML20248C280 + (23:33:15, 1 December 2024)
- ML20248C277 + (23:33:16, 1 December 2024)
- ML20248C273 + (23:33:18, 1 December 2024)
- ML20248C271 + (23:33:19, 1 December 2024)
- JAFP-98-0178, Submits Response to RAI Re List of Topics That Were Missed by Individuals Who Were Renewed During Period of 1994 Through Apr 1997 + (23:33:20, 1 December 2024)
- ML20248C270 + (23:33:20, 1 December 2024)
- IR 05000295/1989005 + (23:33:21, 1 December 2024)
- ML20248C267 + (23:33:22, 1 December 2024)
- ML20248C266 + (23:33:23, 1 December 2024)
- B13299, Proposed Tech Specs,Decreasing Reactor Trip Set Point & Allowable Value for Reactor Coolant Pump Low Shaft Speed from 97.8 to 95.8% Rated Speed & from 94.6 to 92.5% Rated Speed,Respectively + (23:33:26, 1 December 2024)
- ML20248C265 + (23:33:26, 1 December 2024)
- ML20248C261 + (23:33:27, 1 December 2024)
- ML20248C257 + (23:33:28, 1 December 2024)
- ML20248C259 + (23:33:28, 1 December 2024)
- ML20248C255 + (23:33:29, 1 December 2024)
- ML20248C252 + (23:33:30, 1 December 2024)
- ML20248C249 + (23:33:30, 1 December 2024)
- ML20248C245 + (23:33:32, 1 December 2024)
- ML20248C238 + (23:33:37, 1 December 2024)
- ML20248C240 + (23:33:37, 1 December 2024)
- ML20248C237 + (23:33:38, 1 December 2024)
- IR 05000483/1989010 + (23:33:42, 1 December 2024)
- ML20248C230 + (23:33:44, 1 December 2024)
- ML20248C225 + (23:33:45, 1 December 2024)
- ML20248C226 + (23:33:45, 1 December 2024)
- ML20248C222 + (23:33:46, 1 December 2024)
- ML20248C223 + (23:33:46, 1 December 2024)
- ML20248C218 + (23:33:48, 1 December 2024)
- ML20248C219 + (23:33:48, 1 December 2024)
- B13284, Proposed Tech Spec 3.6 Re ECCS + (23:33:52, 1 December 2024)
- IR 05000454/1989013 + (23:33:52, 1 December 2024)
- ML20248C212 + (23:33:56, 1 December 2024)
- ML20248C213 + (23:33:56, 1 December 2024)
- 05000325/LER-1988-035, :on 881222,determined That Standby Gas Treatment Line Not Seismically Qualified Prior to 881117. Caused by Steel Beam Becoming Overloaded During Postulated Seismic Event.Investigation Started + (23:33:58, 1 December 2024)
- ML20248C208 + (23:33:59, 1 December 2024)