Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000280/LER-1997-008-01, :on 971011,invalid Actuation of ESF Occurred. Caused by Personnel Errors.Main CR Bottled Air Sys Isolated & Containment Hydrogen Analyzer Heat Tracing Actuation Signal Reset + (November 7, 1997)
- ML18067A765 + (November 7, 1997)
- ML18153A396 + (November 7, 1997)
- 05000397/LER-1997-010, :on 970906,discovered That TS SR 3.4.5.1 for Identified Portion of RCS Total Leakage Would Not Be Able to Perform within Time Limits of SR 3.0.2.Caused by Inadequate Methods.Method of Meeting SR 3.4.5.1 Established + (November 7, 1997)
- GO2-97-202, Informs That Util Will Not Be Able to Provide Response for Staff to Maintain Review Schedule within 30-day Time Period. Info Will Be Provided on or Before 971205 + (November 7, 1997)
- 05000389/LER-1997-007-02, :on 971008,inoperable Containment Cooling Fan Resulted in Operation of Facility Outside Design Basis. Caused by non-cognitive Personnel Error.Ccs Operation Was Revised & Issued on 971013 + (November 7, 1997)
- L-97-287, Verifies That Containment Structural Integrity & Containment Leakage Rates Are Acceptable by TS SRs 4.6.1.6 & 4.6.1.2, Respectively.Next Periodic ILRT Is Due Before May 2003. Basis of Util Decision Encl,For Info + (November 7, 1997)
- ML17264B104 + (November 7, 1997)
- ML17187B205 + (November 7, 1997)
- ML14181A959 + (November 7, 1997)
- ML14181A957 + (November 7, 1997)
- ML13316A239 + (November 7, 1997)
- ML17229A524 + (November 7, 1997)
- TAC:M96814 + (November 7, 1997)
- Press Release-I-97-147, NRC, Stroh Brewery Company to Discuss Apparent Violations Involving Pennsylvania Plants Handling of Nuclear Gauges + (November 7, 1997)
- ML14175A929 + (November 7, 1997)
- ML17334A540 + (November 7, 1997)
- ML18153A186 + (November 7, 1997)
- TAC:M97614 + (November 7, 1997)
- ML17354A712 + (November 7, 1997)
- ML20199B344 + (November 7, 1997)
- ML20199C043 + (November 7, 1997)
- ML20199D488 + (November 7, 1997)
- ML20199D462 + (November 7, 1997)
- ML20199C935 + (November 7, 1997)
- ML20199B771 + (November 7, 1997)
- 05000361/LER-1997-013, :on 971010,charcoal Filter Surveillance Testing Was Not Current.Caused by Cognitive Personnel Error.No Irradiated Fuel Has Been Moved in Either Fuel Bldg Since 970522.Filters Will Be Replaced Before Fuel Is Next Moved + (November 7, 1997)
- 05000206/LER-1997-001-02, Forwards LER 97-001-02 Re Missed Testing/Insp of Security Sys.Util Has Noted That Counselling of Individual Was Inadvertently Not Completed & LER Is Being Revised, Accordingly + (November 7, 1997)
- ML20198S355 + (November 7, 1997)
- ML20198P927 + (November 7, 1997)
- ML20199D110 + (November 8, 1997)
- ML20199D104 + (November 8, 1997)
- ML20202D576 + (November 8, 1997)
- ML20266D119 + (November 8, 1997)
- ML20266D111 + (November 8, 1997)
- ML20266D109 + (November 8, 1997)
- ML20266D103 + (November 8, 1997)
- ML20266D096 + (November 8, 1997)
- ML20199K566 + (November 8, 1997)
- ML20199C754 + (November 8, 1997)
- ML20202F791 + (November 9, 1997)
- ML20202F396 + (November 9, 1997)
- ML17333B129 + (November 10, 1997)
- Press Release-IV-97-068, NRC Proposes $2,750 Fine Against Frontier Production Logging for Violation of Safety Requirements + (November 10, 1997)
- ML18038B985 + (November 10, 1997)
- ML20202B705 + (November 10, 1997)
- ML20199K152 + (November 10, 1997)
- IR 05000413/1997012 + (November 10, 1997)
- ML20199G035 + (November 10, 1997)
- ML20199G024 + (November 10, 1997)
- ML20199F959 + (November 10, 1997)
- ML20199F859 + (November 10, 1997)
- ML20199F408 + (November 10, 1997)
- ML20199E974 + (November 10, 1997)
- ML20199D625 + (November 10, 1997)
- ML20199D441 + (November 10, 1997)
- ML20199D247 + (November 10, 1997)
- ML20199C685 + (November 10, 1997)
- ML20199C529 + (November 10, 1997)
- ML20199C315 + (November 10, 1997)