Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17263A691 +
- ML17263A690 +
- ML17263A688 +
- ML17263A687 +
- ML18059B058 +
- ML18059B057 +
- ML18151A675 +
- ML18151A674 +
- ML20070E198 +
- ML20070E189 +
- ML20070A028 +
- ML20069L078 +
- ML20069K192 +
- ML20069K119 +
- ML20069J939 +
- ML20069J263 +
- ML20069J101 +
- ML20069J106 +
- ML20069J092 +
- ML20069J083 +
- ML20069H970 +
- ML20069H656 +
- ML20069H647 +
- ML20069H637 +
- ML20069H631 +
- ML20069H623 +
- ML20069H619 +
- ML20134B255 +
- ML20134B509 +
- NRC-94-4160, Forwards Rev 0 to WCAP-14075, AP600 Design Differences Document for Development of Emergency Operating Guidelines Rept +
- NRC-94-4162, Informs That Analysis Rept for Seismic Design for Basemat of AP600 Nuclear Island Will Be Available for NRC Info in Preparation for Structural Audit Scheduled for 940711-15 +
- 0CAN069405, Provides Update on Progress of Historical Review Project in Reviewing Past NRC Correspondence for Commitments at ANO Units 1 & 2 +
- ML20262G790 +
- ML20262G783 +
- ML20262G697 +
- 05000336/LER-1994-014-01, :on 940510,discovered Overstressed Condition in Commom Discharge Line from Vital DC Switchgear Room Coolers, Due to Missing Pipe Support.Installed Missing Support +
- 05000336/LER-1994-010, :on 940513,actuation Resulted in Starting of Facility II Charging Pump,Both Boric Acid Pumps.Caused by Spurious Actuation of DG Load Sequencer.Signal Noise Spikes Will Be Added to Quenched W/Stunting Resistor +
- 05000266/LER-1994-005, :on 940509,determined That Unit 1 Reactor Cavity Cooling Fans in Condition Potentially Outside Design Basis Due to Failure to Install Cooling Fan Assemblies. Assemblies Installed,Per Mod Request 94-032 +
- 05000458/LER-1994-008-01, :on 940509,determined That Min Number of Operable Channels Per Trip Sys for RPS Not Maintained Due to Inadequate Work Package Review.Reviews Emphasizing Importance of Retest Requirements Conducted +
- ML20095L386 +
- ML18100B129 +
- IR 05000311/1994006 +
- ML18153A994 +
- ML17158A328 +
- ML16138A779 +
- ML14314A498 +
- ML14314A495 +
- ML14314A496 +
- ML18011A483 +
- ML18153A973 +