Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17262A362 +
- ML20029A747 +
- ML20029A712 +
- ML20029A739 +
- ML20029A520 +
- ML20029A317 +
- ML20029A316 +
- ML20029A296 +
- ML20056D597 +
- ML20067E587 +
- ML20067E580 +
- ML20067E345 +
- ML20067E218 +
- ML20067D706 +
- ML20067D339 +
- ML20067D291 +
- ML20067D264 +
- NRC-91-0006, Responds to Violations Noted in Insp Rept 50-341/90-17. Corrective Actions:Procedures Re Tool Control,Matl Accountability & Housekeeping Will Be Revised to Clarify Requirements & Consolidate Responsibilities +
- ML20067D172 +
- ML20067D128 +
- ML20067C978 +
- ML20067C942 +
- ML20067C697 +
- ML20067C548 +
- ML20067C530 +
- ML20067C329 +
- ML20067C324 +
- ML20067C273 +
- ML20067C272 +
- ML20067C099 +
- ML20067C095 +
- ML20067C091 +
- ML20067B116 +
- ML20066H160 +
- ML20066H042 +
- ML20066G957 +
- ML20072R725 +
- IR 05000498/1991003 +
- TAC:M79449 +
- BECO-91-012, Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Primary Containment Integrity & Primary Containment Isolation Valves +
- BECO-91-013, Application for Amend to License DPR-35,changing Tech Specs to Establish Revised Basis for Safety Analyses Based on Results of GE Safer/Gestr LOCA Analysis Methodology +
- PY-CEI-NRR-1293, Forwards Clarification of Two Issues Discussed in 901214 Response to Violation Noted in Insp Rept 50-440/90-12,per 910108 Telcon +
- ML20057B181 +
- ML20265E270 +
- 05000254/LER-1989-022, :on 891128,unit 1 High Pressure Coolant Injection Sys Declared Inoperable Following Unexpected Actuation of HPCI Pump Room Deluge Sys.Cause Unknown. Procedure Revised & Operator Trained +
- 05000354/LER-1991-001-01, :on on 910111,primary Containment Isolation Sys Channel B Actuated.On 910110,ESF Actuated During Performance of Surveillance Test.Caused by Variety of Factors.Functional Test Procedure for ECCS Modified +
- 05000353/LER-1991-001, :on 910107,primary Containment Penetration Conductor Overcurrent Protective Device Not Calibr Per TS & Surveillance Test Not Performed.Caused by Incorrect Review of Work on 901203.Procedure Revised +
- 05000352/LER-1991-001-01, :on 910107,3 of 4 Reactor Encl HVAC Supply & Exhaust Air Fans Tripped,Resulting in High Positive Air Pressure.Plant Shutdown on 910108.Caused by Failure of Discharge Dampers to Open Fully.Coil Replaced +
- 05000413/LER-1991-003, :on 910110,emergency Personnel Hatch Found in Down or Closed Position But Not Latched.Caused by Equipment Failure.Hatch Modified by Installing Match Mark Tab Underneath Handwheel +
- 05000414/LER-1991-003-01, :on 910108,inadvertent Initiation of Auxiliary Feedwater Sys Occurred.Caused by Improper Isolation of Control Function During Corrective Maint.Independent Verification Programs Reviewed/Revised +