Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038B273 +
- ML18101A690 +
- ML18101A689 +
- ML18064A757 +
- ML20086A653 +
- ML20085J128 +
- ML20084R424 +
- ML20083C210 +
- ML20083B874 +
- ML20083B458 +
- ML20083B431 +
- ML20083B415 +
- ML20083B397 +
- ML20083B236 +
- ML20083A614 +
- ML20083A099 +
- ML20082V269 +
- ML20141J246 +
- ML20141J162 +
- ML20134K703 +
- ML20134K723 +
- ML20134C763 +
- ML20196K206 +
- ML20203G902 +
- TAC:M89913 +
- RBG-41481, Forwards Matl Requested in for Upcoming Licensed Operator Exams +
- BSEP-95-0193, Requests Concurrence W/Change to CP&L re-inspection Schedule for Two 28-inch Reactor Recirculation Sys Suction piping-to-elbow Welds for BSEP Unit 1 +
- JPN-95-026, Forwards Response to NRC RAI Re Proposed EALs for Plant +
- ML20266E139 +
- ML20266E165 +
- ML20211B472 +
- ML20211B463 +
- 05000382/LER-1995-001-02, :on 950406,inability to Perform Moderator Temp Coefficient Testing Due to Movement of Main Turbine Rotor After Startup from Refuel 6 Outage & Initial Mispositioning in Thrust Bearing.Stopped All Mtc Tests +
- ML20082V321 +
- ML20083A084 +
- ML20083K564 +
- ML20083B900 +
- ML20083A418 +
- ML20083A390 +
- ML20082V317 +
- ML18101A685 +
- 05000260/LER-1995-001-01, Forwards LER 95-001-01 Re EDG Turbocharger Failure.Util Completed Failure Analysis & Decided Most Probable Cause of Turbocharger Failure Was Tooth Bending Fatigue on Planetary Sun Gear +
- IR 05000250/1995007 +
- ML18038B275 +
- TAC:M91885 +
- ML17311A849 +
- 05000397/LER-1995-005, :on 950222,inoperable IRM Had Been Relied Upon to Meet TS Requirements During Reactor Startup.Caused by Lack of Neutron Source to Test Instrumentation. Sys Knowledge Gained Will Be Incorporated +
- ML17158A669 +
- ML17158A667 +
- ML17352B142 +