Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RC-95-0148, Forwards Rev 1 to Sce&G VC Summer Nuclear Station ASME Section XI Inservice Exam Manual for 2nd Insp Interval + (June 2, 1995)
- RBG-41579, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-458/95-02 on 950212-0325.Corrective Actions:Maint Was Performed to Return Lighting Units to Functional Status + (June 2, 1995)
- 0CAN069501, Responds to Violation Noted in Insp Rept 50-313/95-03 on 950219-0401.Corrective Actions:Condition Rept (CR-1-95-272) Initiated & Limited Design Change Package (Lcp 95-5003) Developed to Properly Anchor RBC Units & Installed in 1R12 + (June 2, 1995)
- ML20265C888 + (June 2, 1995)
- 05000374/LER-1995-009-02, :on 950503,HPCS DG & HPCS Pump Initiation Occurred Due to Procedural Deficiency.Hpcs Pump Was Secured After Verification That Actual Rv Water Level Was Not Low + (June 2, 1995)
- 05000324/LER-1995-002-02, :on 950510,HPCI Sys Failed to Operate as Required During Performance of HPCI Periodic Test.Caused by End of Burnout.Verified Adequacy of Similar Resistors in Unit 1 & 2HPCI & RCIC Sys + (June 2, 1995)
- BSEP-95-0252, Spurious Actuation of Primary Containment Isolation Sys Group 6 Valves + (June 2, 1995)
- 05000445/LER-1995-002, :on 950505,automatic Reator Trip Occurred. Caused by Lightning Strike.Task Team Formed to Evaluate & Investigate Methods of Minimizing Effects of Lightning Strike + (June 2, 1995)
- NRC-95-4480, Forwards Preliminary Marked Up Sections of AP600 SSAR Chapter 15.Proprietary Portion Withheld + (June 2, 1995)
- ML20085C369 + (June 2, 1995)
- NRC-95-4478, Forwards Draft Rev 4 of Section 3.7 of AP600 SSAR for Discussion at Meeting on Seismic & Structural Issues During Wk of 950612-16 + (June 2, 1995)
- ML20085H985 + (June 2, 1995)
- ML17311A957 + (June 2, 1995)
- ML17311A959 + (June 2, 1995)
- IR 05000244/1995008 + (June 2, 1995)
- IR 05000397/1994033 + (June 2, 1995)
- L-95-161, Informs That on 950503,upon Completion of Scheduled Annual Emergency Drill,Including Full Scale Siren Activation & Sounding,Notifications Received from Public That Siren Not Heard.Siren Sys Checked & Deemed Operational on 950505 + (June 2, 1995)
- ML17180B247 + (June 2, 1995)
- ML18153A845 + (June 2, 1995)
- ML18101A765 + (June 2, 1995)
- ML15238A094 + (June 2, 1995)
- ML17180B249 + (June 2, 1995)
- ML17291A827 + (June 2, 1995)
- ML20134H362 + (June 2, 1995)
- ML18153A841 + (June 2, 1995)
- ML20086B437 + (June 2, 1995)
- L-95-012, Provides Security Plan Revs for Pbnpsp C-2.0 & Pbnpsp Figure I. Encl Withheld + (June 2, 1995)
- 05000325/LER-1995-008, :on 950513,spurious Actuation of PCIS Group 6 Valves Occurred.Cause Unknown.No Corrective Actions Required + (June 2, 1995)
- ML20087D440 + (June 3, 1995)
- ML20086U325 + (June 3, 1995)
- ML20086U318 + (June 3, 1995)
- ML20086U293 + (June 3, 1995)
- ML20137H118 + (June 3, 1995)
- ML20137H255 + (June 3, 1995)
- ML20141J073 + (June 3, 1995)
- ML20149E032 + (June 4, 1995)
- ML20266E200 + (June 4, 1995)
- Information Notice 1995-28, Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites + (June 5, 1995)
- ML18040A299 + (June 5, 1995)
- ML17263B083 + (June 5, 1995)
- ML17333A902 + (June 5, 1995)
- ML17333A906 + (June 5, 1995)
- ML17332A794 + (June 5, 1995)
- ML20087G422 + (June 5, 1995)
- ML20087E037 + (June 5, 1995)
- ML20087D975 + (June 5, 1995)
- ML20087D970 + (June 5, 1995)
- ML20086D651 + (June 5, 1995)
- ML20085J593 + (June 5, 1995)
- ML20085J476 + (June 5, 1995)
- ML20085J467 + (June 5, 1995)
- ML20085H521 + (June 5, 1995)
- ML20085H503 + (June 5, 1995)
- ML20085H499 + (June 5, 1995)
- ML20085E535 + (June 5, 1995)
- ML20084U170 + (June 5, 1995)
- ML20084S747 + (June 5, 1995)