ML20086B437
| ML20086B437 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/02/1995 |
| From: | Maxfield G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19330G118 | List: |
| References | |
| PBL-95-0140, PBL-95-140, NUDOCS 9507050383 | |
| Download: ML20086B437 (1) | |
Text
. _.
i Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant 6610 Nuclear Rd., Two Rivers, WI 54241 (414) 755-2321 PBL 95-0140 June 2, 1995 I
Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station Pl-137 Washington, DC 20555 l
Gentlemen:
DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 &2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.
Please note that the procedures containing names and telephone numbers are stamped NRC ONLY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.
Sincerely,
(
hr G
J. Maxfield Manager l
i dms Enclosure i
cc:
NRC Resident Inspector (w/o/e)
Incident Response Center, Region III i
i j
i i
//.
N/f[. h k
/ [jt/[
[
9507050393 950602 PDR ADDCK 05000266 s
[g
/
F PDR i
A subMm ontiwvnsiaEwgtheradrw y