Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18009A750 +
- ML18009A744 +
- ML18009A741 +
- ML17305B258 +
- ML17305B231 +
- ML18033B568 +
- ML20024G021 +
- ML20065S239 +
- ML20065Q195 +
- ML20065P828 +
- ML20065P820 +
- ML20065P677 +
- ML20065N467 +
- ML20065M942 +
- ML20065M836 +
- ML20065M677 +
- ML20065M660 +
- ML20065M652 +
- ML20065M391 +
- ML20065L845 +
- ML20065L838 +
- ML20065L815 +
- 0CAN129002, Special Rept:On 901026,fire Pump Inoperable for More than 7 Days.Temporary Pump Installed as Backup +
- JPN-90-071, Advises That Schedule of Corrective Action Re Containment Hydrogen Monitoring Discrepancy Will Be Submitted by 910102 +
- ML20065L541 +
- ML20058K322 +
- ML20069Q218 +
- ML20261K471 +
- ML20207C999 +
- A09066, Submits Chronological Summary of Events Leading to Allegation RI-90-A-136 Re in-place Testing Process & Work on Flow Control Valve.Significant Discrepancies Noted Between Allegations & Util Documentation +
- A09123, Submits Review of Allegations Re Wrong Fuses Tagged When Tagging S-MS-190B & Deminerallizer Inlet motor-operated Valve Failed to Remove 125V from Limit Switch Contacts +
- TAC:76523 +
- BECO-90-149, Provides Update to Long Term Program,Per Section V.A of Plan for Long Term Program - Pilgrim Nuclear Station +
- BECO-90-148, Forwards Revised Pages 1 & 219 of Proposed Tech Spec Change Submitted on 901108 +
- RBG-34103, Responds to NRC Re Deviations Noted in Insp Rept 50-458/90-26 on 900905-1016.Weekly Electrical Maint Foreman Patrols Will Resume Following Refueling Outage 3 & Hot Line Will Be Set Up to Rept Poor Lighting Problems +
- L-90-425, Forwards Rev 25 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(a)(3)) +
- BECO-90-150, Submits Ltr of Intent Re Containment Integrated Leak Rate Test Planned for Refueling Outage 8 +
- ML20062H765 +
- ML20058K272 +
- ML20058K204 +
- ML20058K215 +
- ML20199C223 +
- 05000271/LER-1990-015, :on 901104,reactor Scram Occurred Due to Turbine Trip Caused by Malfunction of Turbine Emergency Tripping Sys +
- 05000353/LER-1990-019-02, :on 901101,half-scram & Isolations Resulted from Loss of Power to Rps/Uninterruptible Supply Panel Due to Inverter Damage +
- 05000354/LER-1990-024-02, :on 901104,discovered Reactor Scram on High Average Power Range Monitor Flux Levels Due to Broken Gas Line +
- 05000354/LER-1990-025-02, :on 901104,discovered Recirculation Sys Instrument Line Crack.Caused by vibration-induced Fatigue +
- 05000338/LER-1990-011-01, :on 901101,min Number Charging Pumps Not in Svc Per TS Due to Personnel Error During Breaker Alignment +
- 05000455/LER-1990-009-10, :on 901107,ESF Actuation Caused by low-2 Steam Generator Level Occurred Due to Procedural Deficiency.W/ +
- ML20058K373 +
- ML20058K176 +