Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202D914 + (November 28, 1997)
- ML20202D501 + (November 28, 1997)
- A97074, Application for Amends to Licenses DPR-39 & DPR-48,revising TSs Using Guidance Provided in NUREG-1431 to Produce Set of Improved TSs for Zion Station + (November 28, 1997)
- TAC:M99776 + (November 28, 1997)
- TAC:M98680 + (November 28, 1997)
- B16741, Submits Clarification to Unit 3 SER Re NUREG-1031,identified During Util Configuration Mgt Program Review + (November 28, 1997)
- B16870, Submits Annual Rept Required Under Restrictions Imposed on Operator License OP-11224 Issued to RR Goldsmith.W/O Encl + (November 28, 1997)
- ML20202E780 + (November 28, 1997)
- ML20202G382 + (November 28, 1997)
- ML20203J838 + (November 28, 1997)
- ML17159A074 + (November 28, 1997)
- ML17059B781 + (November 28, 1997)
- ML17059B779 + (November 28, 1997)
- ML17264B124 + (November 28, 1997)
- ML20198R877 + (November 28, 1997)
- ML20198R868 + (November 28, 1997)
- ML17264B122 + (November 28, 1997)
- L-97-323, Vehicle Barrier System.Sheet 49 + (November 28, 1997)
- ML20203D722 + (November 28, 1997)
- 05000293/LER-1997-022, :on 971028,temporary Power Cables & Extension Cords Were Found Draped or Tie Wrapped to Class 1E Conduits in Reactor Bldg,In Violation of Electrical Separation Criteria.Caused by Inadequate Procedure.Procedure Revised + (November 28, 1997)
- TAC:M99208 + (November 28, 1997)
- ML20202E709 + (November 28, 1997)
- 05000354/LER-1997-023-01, Forwards LER 97-023-01 Re Core Spray Nozzle Weld through- Wall Leak.Commitments Made by Util,Encl + (November 28, 1997)
- IR 05000313/1997019 + (November 28, 1997)
- IR 05000458/1997011 + (November 28, 1997)
- IR 05000498/1997015 + (November 28, 1997)
- 05000302/LER-1979-005-01, Discusses Commitment Stated in LER 79-005-01T-1 Re MSIV Valves Not Closing within Design Time of Five Seconds During Double Ended Pipe Rupture.Util Has Determined That Upgrading Air Circuit to Seismic Class I Will Not Be Nec + (November 28, 1997)
- ML20199L657 + (November 29, 1997)
- ML20199L646 + (November 29, 1997)
- ML20199L984 + (November 29, 1997)
- ML20198R887 + (November 29, 1997)
- ML17264B137 + (November 30, 1997)
- ML17334B671 + (November 30, 1997)
- ML17334B665 + (November 30, 1997)
- ML17334A606 + (November 30, 1997)
- ML17334A604 + (November 30, 1997)
- ML17334A584 + (November 30, 1997)
- ML17334A583 + (November 30, 1997)
- ML17334A564 + (November 30, 1997)
- ML17334A563 + (November 24, 1997)
- ML17313A182 + (November 30, 1997)
- ML17313A180 + (November 30, 1997)
- ML17313A135 + (November 30, 1997)
- ML18106A230 + (November 30, 1997)
- ML18106A229 + (November 30, 1997)
- ML18065B104 + (November 30, 1997)
- ML18153A386 + (November 30, 1997)
- ML18151A155 + (November 30, 1997)
- ML18151A154 + (November 26, 1997)
- ML20151Z109 + (November 30, 1997)
- ML20202D156 + (November 30, 1997)
- ML20199K974 + (November 30, 1997)
- ML20199K231 + (November 30, 1997)
- ML20199K027 + (November 30, 1997)