Text
$
e
[p* Mc k
NUCLEAR REGULATORY COMMISSION
oq
UNITED STATES
'
,
l
%
REG!QN lli
E
ij
001 WARRENVILLE HoAD
USLE. ILUNotS 00532-4351
November 28, 1997
Mr. J. Brons
Site Vice President
Zion Station
Commonwealth Edison Company
101 Shiloh Boulevard
Zion,IL 60099
SUBJECT:
NRC INSPECTION REPORT NO. 50-295/97022(DRP); 50-304/97022(DRP) AND
Dear Mr. Brons:
On October 10,1997, the NRC compkted an inspection at your Zion 1 and 2 reactor facilities.
The enclosed report presents the results of that inspection.
During this 6 week inspectlan period, the laspectors noted some improvement in the operators'
implementation of the Zion Operations Department Standards. This was most evident in the
operators' response to the unexpected loss of instrument bus 213. However, the inspectors also
n;ted that the implementation of the out-of-service program remained problematic and that
operators continue to be challenged by inappropriate procedural guidance.
We are concemed about four violations of NRC requirements that were identified during this
inspection period. The first violation Irwolves three examples of deficiencies in the
implementation of the out-of-service program. The second violation pertains to the failure to
provide appmpriate guidance to the operators to test the autostart inhibit circuitry for the
OC component cooling water pump and to respond to a loss of instrument bus 213 event. The
third violation relates to the establishment of the nuclear instrumentation power range rate trip
setpoint greater than that allowed by the Technical Specification Limiting Safety System Setting.
The fourth violation involves the failure to maintain the minimum number of operable power
range rate trip channels or comply with the Technical Specification Action Statements.
These violations are cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding the violations are described in detailin the enclosed report. Please note that you are
required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
,
\\
\\
\\f
A\\\\lll%\\\\lll\\\\1llIl
- +io
9712050184 971128
ADOCK 050002 5
0
-
_ _ _ _ _ _ _ _ _ _ _ _ _
.
-
- - -
'
J. Brons
-2-
-
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, lis
enclosures, and your response will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concoming this inspection.
Sincerely,
/s/ G. E. Grant
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos: 50 295; 50-304
Enclosures:
1.
2.
Inspection Report
No. 50 295/97022(DRP);
50-304/97022(DRP)
cc w/encis:
O. Kingsley, Nuclear Generation Group
President and Chief Nuclear Officer
M. Wallace, Senior Vice
President, Corporate Services
H. G. Stanley, Vice President
PWR Operations
Liaison Officer, NOC-BOD
D. A. Sager, Vice Presic;ent,
Generation Support
D. Farrar, Nuclear Regulatory
Services Manager
1. Johnson, Licensing
Operations Manager
Document Control Desk-Licensing
R. Starkey, Plant General Manager
R. Godley, Regulatory Assurance
,
j
Supervisor
Richard Hubbard
Nathan Schloss, Economist
Office of the Attomey General
Mayor, City of Zion
State Liaison Officer
State Liaison Officer, Wisconsin
Chairman, Illinois Commerce
Commission
DOCUMENT NAME: G:\\ ZION \\ZIO97022.DRP
T.
w . ..,, . inn. 4
. i m. . in in. m..
c . c.,y dthevi ti hm.ni/
i
- c.$, . din . .ch
.el.
i uv.
N - N. ..py
i
OFFICE
Rlli
l6 Rilkgdj
t3
Rlil
l6
Rill
,
,
NAME
Hills /et
0#
Crew
9
Vegel
Al
Grant CN
DATE
11/ri/97
11/M/97
11h1/97
1171397)U
,
l
OFFICIAL RECORD COPY
l
_
..
.
.
- -
. . .
.
-
.
- - . .
.. .
-
. _ - . _ _
-
.-
.__
_
_
. -
'
,
J. Brons
3
Distopution-
Docket File w/oncis
DRP w/oncis
OCFO/LFARB w/encls
TSS w/oncis
PUBLIC IE-01 w/encls
DRS (2) w/encls
A. Beach w/encls
Rlli PRR w/encls
Deputy RA w/encls -
RAC1 (E-Mail)
Rlli Enf. Coord, w/encls
CAA1 (E-Mail)
SRI Zion w/encls
DOCDESK (E-Mail)
Project Mgr., NRR w/encls
f
-
-.
.
- _-
.
-
-
-.
. . - . _ . . -
--
.-
- . -
-
-
'
.
J. Brons
2-
4
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concoming this inspection.
'
'
Sincerely,
-
E! Grant, Direct
Division of Reactor Projects
Docket Nos: 50-295; 50-304
Enclosures:
1.
2.
Inspection Report
No. 50-295/97022(DRP);
50-304/97022(DRP)
cc w/encis:
O. Kingsley, Nuclear Generation Group
President and Chief Nuclear Officer
M. Wallace, Senior Vice
President, Corporate Services
H. G. Stanley, Vice President
PWR Operations
Liaison Officer, NOC-BOD
D. A. Sager, Vice President,
Generation Support
D. Farrar, Nuclear Regulatory
Services Manager
1. Johnson, Licensing
Operations Manager
Document Control Desk-Licensing
R. Starkey, Plant General Manager
R. Godley, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist
Office of the Attomey General
Mayor, City of Zion
State Liaison Officer
State Liaison Officer, Wisconsin
Chairman, Illinois Commerce
Commission
,
.iar
_, _ . _
r-
-
.
-
.
.
-
-
-