ML18151A154

From kanterella
Jump to navigation Jump to search
Forwards Results of USI A-46 Evaluation for Surry Power Station Units 1 & 2 Per GL 87-02 as Vols 1 & 2 Entitled, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 USNRC GL 87-02.
Date released: 12/10/2018 Download: ML18151A154


Vols 1 & 2 of Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, USI A-46 USNRC GL 87-02. Page 12 in Vol 1 of Incoming Submittal Not Included
ML18151A155
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/30/1997
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR
Download: ML18151A155 (324)
Forwards Results of USI A-46 Evaluation for Surry Power Station Units 1 & 2 Per GL 87-02 as Vols 1 & 2 Entitled, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 USNRC GL 87-02.
ML18151A153
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/26/1997
From: Ohanlon J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR
Download: ML18151A153 (358)