Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20024J179 + (September 16, 1994)
- ML20024J306 + (September 16, 1994)
- ML20073B921 + (September 16, 1994)
- TAC:M88977 + (September 16, 1994)
- ML20073B540 + (September 16, 1994)
- ML20073B933 + (September 16, 1994)
- IR 05000250/1994017 + (September 16, 1994)
- ML18011A594 + (September 16, 1994)
- 05000530/LER-1994-005-01, :on 940819,reactor Trip Occurred Following Degradation of Mf Flow.Fwcs cabinets,SG-1 Economizer & MFW Pumps Quarantined & FWCS-1 Master Controller Replaced.W/ + (September 16, 1994)
- GO2-94-215, Requests Enforcement Discretion from TS 3.6.3.a,for 14 Days Starting on 940915 to Allow Time to Process TS Amend Under Emergency Conditions + (September 16, 1994)
- IR 05000244/1994011 + (September 16, 1994)
- ML17352A796 + (September 16, 1994)
- ML17263A783 + (September 16, 1994)
- ML14183A270 + (September 16, 1994)
- ML14183A272 + (September 16, 1994)
- ML18011A596 + (September 16, 1994)
- ML17059A457 + (September 16, 1994)
- ML17352A793 + (September 16, 1994)
- ML17311A272 + (September 16, 1994)
- ML20073B553 + (September 16, 1994)
- TAC:M90102 + (September 16, 1994)
- ML20073F456 + (September 17, 1994)
- ML20073D345 + (September 17, 1994)
- ML20073C042 + (September 17, 1994)
- ML20073C033 + (September 17, 1994)
- ML20073B862 + (September 17, 1994)
- B14984, Application for Amend to License NPF-49,revising TS Re AFW Sys,Msli Valves & ESFAS Instrumentation + (September 17, 1994)
- ML17291A398 + (September 18, 1994)
- ML17291A396 + (September 18, 1994)
- ML20265C559 + (September 18, 1994)
- GO2-94-216, Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements + (September 18, 1994)
- Information Notice 1994-66, Overspeed of Turbine-Driven Pumps Caused by Governor Valve Stem Binding + (September 19, 1994)
- Press Release-94-144, NOTE to Editors: NRC Received Two Reports from ACRS Re Proposed GL, Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes and Revised Regulatory Analysis Guidelines + (September 19, 1994)
- ML18101A234 + (September 19, 1994)
- ML18064A388 + (September 19, 1994)
- ML20076N107 + (September 19, 1994)
- ML20076L629 + (September 19, 1994)
- ML20073J915 + (September 19, 1994)
- ML20073H409 + (September 19, 1994)
- ML20073E693 + (September 19, 1994)
- ML20073E686 + (September 19, 1994)
- ML20073D955 + (September 19, 1994)
- ML20073D634 + (September 19, 1994)
- ML20073D441 + (September 19, 1994)
- ML20073D376 + (September 19, 1994)
- ML20073C747 + (September 19, 1994)
- ML20073C656 + (September 19, 1994)
- ML20073C622 + (September 19, 1994)
- ML20073B695 + (September 19, 1994)
- ML20073B684 + (September 19, 1994)
- ML20073B673 + (September 19, 1994)
- ML20073B649 + (September 19, 1994)
- ML20149F921 + (September 19, 1994)
- NRC-94-4299, Forwards non-proprietary & Proprietary Revs 0 to WCAP-14170 & WCAP-14169, Phase Iva Wind Tunnel Testing for Westinghouse AP600 Reactor Suppl Rept, Documenting Aspects of AP600 Testing Program.Proprietary Rept Withheld + (September 19, 1994)