Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20002E430 + (March 17, 1978)
- ML19329C375 + (March 17, 1978)
- 05000302/LER-1978-017, Forwards LER 78-017/01T-0 + (March 17, 1978)
- ML19326B893 + (March 17, 1978)
- ML19326B883 + (March 17, 1978)
- ML19326B880 + (March 17, 1978)
- ML19326B887 + (March 17, 1978)
- ML19329E428 + (March 17, 1978)
- ML19329E417 + (March 17, 1978)
- 05000302/LER-1978-009, Forwards LER 78-009/04x-0 + (March 17, 1978)
- 05000302/LER-1978-016-01, /01T-0:on 780310,in Mode 5 Operation,Unplanned Reactivity Insertion of 4.3% of Delta K/K.Caused by Dilution of RCS Upon Draining.Rcs Boron Sampling Surveillance Increased + (March 17, 1978)
- ML19309E408 + (March 17, 1978)
- ML19290C072 + (March 17, 1978)
- ML19309B027 + (March 17, 1978)
- ML19220C419 + (March 17, 1978)
- ML19199A527 + (March 17, 1978)
- ML19206A353 + (March 17, 1978)
- 05000316/LER-2078-018-03, L & LER 1978-018-03L Re Failure of Inverter Power Supply + (March 17, 1978)
- 05000316/LER-2078-003-03, D.C. Cook - Submit Licensee Event Report RO 78-003/03L-0 for Unit 2 + (March 17, 1978)
- 05000249/LER-1978-003, /01T-0 for Dresden 3 Regarding Discovery of Containment Valve Leakages in Excess of Technical Specification 4.7.A Limits + (March 17, 1978)
- ML19220B597 + (March 17, 1978)
- ML19317F541 + (March 17, 1978)
- ML19308C788 + (March 17, 1978)
- ML19220B840 + (March 17, 1978)
- ML19261C392 + (March 17, 1978)
- TAC:08891 + (March 17, 1978)
- ML19206A794 + (March 18, 1978)
- ML19317E953 + (March 18, 1978)
- ML17037C004 + (March 20, 1978)
- ML17261A323 + (March 20, 1978)
- ML17261A320 + (November 10, 1977)
- ML18088B264 + (March 20, 1978)
- ML20024G703 + (March 20, 1978)
- ML20024G392 + (March 20, 1978)
- ML20024G399 + (March 20, 1978)
- ML20024G393 + (March 20, 1978)
- NRC Generic Letter 78-09, Multiple-Subsequent Actuations of Safety/Relief Valves Following an Isolation Event + (March 20, 1978)
- ML19319B944 + (March 20, 1978)
- ML19319B942 + (March 20, 1978)
- ML19031A363 + (March 20, 1978)
- ML19030A702 + (March 20, 1978)
- ML19326B730 + (March 20, 1978)
- ML19326B690 + (March 20, 1978)
- ML19319B945 + (March 20, 1978)
- ML19319B941 + (March 20, 1978)
- ML19317D200 + (March 20, 1978)
- ML19317D199 + (March 20, 1978)
- ML19317D198 + (March 20, 1978)
- ML20024G391 + (March 20, 1978)
- ML20085A467 + (March 20, 1978)
- ML20104A474 + (March 20, 1978)
- ML20090F793 + (March 20, 1978)