Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17285B215 +
- ML17285B214 +
- ML072841079 +
- ML18153C190 +
- ML20042F268 +
- ML20042E643 +
- ML20062C002 +
- ML20062B981 +
- ML20261K545 +
- ML20217R144 +
- ML20217R138 +
- ML20265C063 +
- ML20058J424 +
- ML20043G342 +
- ELV-01535, Forwards Amend 17 to Security Plan.Amend Withheld (Ref 10CFR2.790) +
- ML20042E757 +
- ML20042F837 +
- B13505, Requests Schedular Exemption from Requirements of 10CFR50, App E,Section IV.F.3 to Allow Dec 1990 Full Participation Exercise to Be Exchanged W/Oct 1991 Partial Participation Exercise.Justifications Listed +
- ST-HL-AE-3422, Final Special Rept:On 891128,diesel Generator Valid Failure Occurred.Caused by Presence of Improperly Drilled & Repaired Oil Passage Hole Serving Articulated Rod Pin Bushing in Master Connecting Rod Assembly.Crankshift Webs Repaired +
- ML20042E104 +
- ML20042E596 +
- ML20034B653 +
- 05000344/LER-1990-008, :on 900319,inadvertent Isolation of Normal Control Bldg Ventilation Sys Occurred During Replacement of Indicating Light Bulb in Sulfur Dioxide Gas Monitor.Caused by Training Weaknesses.Gas Panel Relabeled +
- ML20034B266 +
- 05000333/LER-1990-010, :on 900319,reactor Automatically Scrammed When False Low Reactor Vessel Water Level Signal Resulted in Rise of Reactor Water Above Top of Active Fuel & HPCI Isolation. Caused by Procedural Inadequacy.Valve Reset +
- 05000423/LER-1990-010, :on 900319,both Trains of Auxiliary Bldg Filters Became Inoperable When Train B Circuit Breaker Motor Failed & Train a Filter Removed from Svc.Caused by Fatigue Failure in Breaker Spring.Filter Work Stopped +
- ML20034B096 +
- 05000344/LER-1990-009, :on 900319,discrepancy in Setpoint of Function Generator Module in ESF Actuation Sys Noted.Caused by Inadequate Process for Ensuring Incorporation of Engineering Calculations in Calibr Settings +
- 05000271/LER-1990-005, :on 900328,discovered That Incomplete Evaluation of Containment Air Sample,Taken on 900315, Performed.Caused by Inadequate Review of Computer Programs. Individuals Instructed & Programs Revised +
- IR 05000457/1990012 +
- 3F0490-04, Describes Significant Changes in Application of B&W LOCA Evaluation Model for Peak Cladding Temps.Revised Peak Cladding Temp Reflects Change of Greater than 50 Degrees F. B&W & Util Concluded That 10CFR21 Inapplicable +
- 05000458/LER-1990-009, :on 900319,both Inboard & Outboard Isolation Valves Failed Local Leak Rate Test.Caused by Silt & Corrosion Products Present in Both Valves.Disk Hinge Ping Area Cleaned & Valve Seats Inspected +
- 05000336/LER-1989-011, :on 890906,svc Water Supply Isolation Valve Discovered to Be Incorrectly Located.Caused by Incorrect Reassembly of Instrument Air Lines to Solenoid Valves & Accumulators.Check Valve Location Corrected +
- BECO-90-060, Responds to NRC Bulletin 90-002 Re Loss of Thermal Margin Caused by Channel Box Bow.Channel Boxes for Second Bundle Lifetime Not Currently Used +
- PNO-V-90-019, on 900417,earthquakes Measuring 4.6 on Richter Scale Measured 3 Miles West of Upland,Ca.On 900418,three Earthquakes Occurred in Northern California.No Visual Damage Occurred to Reactors in Area +
- IR 05000302/1990010 +
- IR 05000271/1990001 +
- ML20034B165 +
- IR 05000213/1990004 +
- IR 05000298/1990009 +
- IR 05000424/1990009 +
- IR 05000321/1990006 +
- L-90-087, Responds to Violations Noted in Insp Rept 50-286/90-01. Corrective Actions:Importance of Ensuring Staff Procedural Adherence Will Be Impressed Upon Operations Personnel +
- ML20034C150 +
- ML20034C147 +
- ML20034B055 +
- PNO-I-90-028, on 900416,unplanned Shutdown Greater than 48 H Occurred After Operators Manually Tripped Unit from 49% Reactor Power Due to Loss of Condenser Vacuum.Licensee in Process of Improving Intake Sys Reliability.State Informed +
- ML20034B576 +
- ML20042F624 +
- ML20034B033 +