Forwards Insp Repts 50-317/90-05 & 50-318/90-05 on 900211-0324.No Violations Noted.Ack Receipt of 900309 Response to Violation Re safety-related Cable Separation
ML20034B055
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/18/1990
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20034B056 List:
References
NUDOCS 9004250269
Download: ML20034B055 (2)


See also: IR 05000317/1990005

Text

p

.

.,

.

'

APR181990

,

Docket / License Nos:

50-317/DPR-53

50-318/DPR-69

Baltimore Gas and Electric Company

ATTN: Mr. George C. Creel

Vice President - Nuclear Energy

Calvert Cliffs Nuclear Power Plant

MD Routes 2 and 4

Post Office Box 1535

Lusby, Maryland 20657

Gentlemen:

Subject: NRC Region I Resident Inspection Report Nos. 50-317/90-05 and

50-318/90-05 (February 11, 1990 to March 24,1990)

This report transmits the findings of the routine resident inspection conducted

at the Calvert Cliff s Nuclear Power Plant. At the conclusion of the inspec-

tion, these findings were discussed with Mr. Denton of your staff.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter.

Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

We

have noted your progress towards accomplishing short-term corrective actions

is sufficient to support return to operation of Calvert Cliffs Unit 1.

The

Executive Summary portion of this report summarizes our assessments of your

short-term actions as well as commitments that you have made during this

inspection period with regard to efforts in progress.

We will continue to

closely monitor your progress on these issues.

In addition, we have received your letter of March 9,1990 which responded to

a violation regarding safety-related cable separation.

While our review of

this issue is not complete, we have noted good progress in your correction of

weaknesses noted in the cable separation area.

Within the scope of this inspection, no violations were observed.

Your cooperation with us is appreciated.

Sincerely,

OPGINAL S!GNED BY:

CURilS J. COWGILL

James C. Linville, Chief

I

Reactor Projects Branch No. 1

~

Division of Reactor Projects

(

OFFICIAL RECORD COPY CIR CC 90-05 - 0001.0.0

%' hDj

04/18/90

9004250269 900418

PDR

ADOCK 05000317

Q

PDC

i

.

,

o

e

APR 181990

Baltimore Gas and Electric Company

2

Enclosure: NRC Region I Resident Inspection Report Nos. 50-317/90-05

and 50-318/90-05

cc w/ enc 1:

,

T. Magette, Administrator, Nuclear Evaluations

t

J. Walter, Engineering Division, Public Service Commission of Maryland

G. Adams, Licensing, (CCNPP)

K.~ Burger, Esquire, Maryland People's Counsel

,

P. Birnie, Maryland Safe Energy Coalition

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

i

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

J. Wiggins, DRP

,

J. Linville, DRP

C. Cowgill, DRP

D. Limroth, DRP

D. Vito, DRP

K. Lathrop, DRP

R. Bellamy, DRSS

J. Caldwell, EDO

M. Callahan, OCA

,

R. Capra, NRR

D. Mcdonald, NRR

l

l

.

RI:DRP

g/

RI:DR

\\

RI:DRP

f t-

LNichol

md

CCowgi 1

l

JLinvil e

4/11/90

4//j /90

4/l$'/90

,

OFFICIAL RECORD COPY CIR CC 90-05 - 0002.0.0

04/17/90