Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17263A465 +
- ML17263A464 +
- ML17290A343 +
- ML18036B296 +
- ML18036B295 +
- ML18036B291 +
- ML18036B290 +
- ML18036B289 +
- ML18058B822 +
- ML20044H411 +
- ML20044E712 +
- ML20044E703 +
- ML20044E621 +
- ML20044E002 +
- ML20044D995 +
- ML20044E001 +
- ML20044D845 +
- ML20044D814 +
- ML20044D788 +
- ML20044D659 +
- ML20044D654 +
- ML20266C357 +
- ML20059B589 +
- ML20056E947 +
- ML20056E924 +
- ML20056E808 +
- ML20056D745 +
- ML20046B559 +
- NUREG-1432, Notification of 930422 Meeting W/Og to Discuss Improved STS & Related Matters +
- ML20045H111 +
- ML20045A759 +
- ML20044G310 +
- ML20044G577 +
- ML20045A969 +
- ML20044E310 +
- ML20044E918 +
- IR 05000219/1993080 +
- ML20044E261 +
- ML20044D789 +
- ML20044D770 +
- 05000327/LER-1993-009, :on 930417,TS Surveillance Not Performed for Three Pipe Support Snubbers Because of Omission of Snubbers from Surveillance Instruction for Visual Insp.Snubbers Visually Inspected & Functionally Tested +
- 05000309/LER-1993-008, :on 930415,ECCS Valves Found Unlocked.Caused by Oversight in Procedure Controls Due to Misunderstanding of Lube Water Supply Requirements for Svc Water Pump Operability.Controlling Procedures Revised +
- 05000458/LER-1993-005, :on 930415,discovered That RCIC Steam Line Flow - High Timer Function Never Performed on Monthly Basis. Caused by Failure to Include Test in Initial Procedure Development Process.Procedures Revised +
- 05000298/LER-1993-014, :on 930316,small through-wall Leak Developed on High Pressure Side of SW Throttle Valve.Caused by Inadequate Valve Design.Frequency of Visual Insp of Valve Internals Will Be Increased to Once Per Cycle +
- 05000266/LER-1993-006, :on 930416,discovered That Outside CIV Not Leak Tested,Per TS 15.4.4.III.D Requirements Due to Review on 840202,recommending That Valve Be Tested During RHR Hydrostatic Testing.Subj Valve Replaced +
- 05000266/LER-1992-009-01, Forwards Suppl LER-92-009-01 Re Ccws Surge Tank Vent Valves Being Outside Design Basis.Rept Provided to Rept Final Corrective Actions to Resolve Condition +
- B14426, Application for Amend to License DPR-61,revising TS & License Condition Re Fire Protection,Per GL 86-10 +
- IR 05000285/1993099 +
- ML20044D745 +
- 05000424/LER-1993-006, :on 930418,safety Injection Initiated During Slave Relay Testing.Caused by Personnel Error.Team Reminded to Request Assistance When Operational Questions Arise.W/ +