ML20044E621
| ML20044E621 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/17/1993 |
| From: | Link B WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19311B052 | List: |
| References | |
| CON-NRC-93-065, CON-NRC-93-65 VPNPD-93-106, NUDOCS 9305250244 | |
| Download: ML20044E621 (1) | |
Text
l Wiscor~"
i ElectrL PONER COMPAin 2M w temn eo to 2m wware u 532u Im) 2202345 l
VPNPD-93-10 6 NRC-93-065 May 17, 1993 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSIGN Mail Station F1-137 Washington, DC 20555 Gentlemen:
DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 &2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Procedures Manual.
The procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.
Please note that the procedures containing names and telephone i
numbers arc stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE."
A copy of the affected procedures, with names and numbers deleted, are provided and are stamped " NAMES AND TELEPHONE NUMBERS DELETED" to i
assure confidentiality and facilitate your distribution.to the public documents rooms.
j 1
Sincerely, Bob Link I
Vice President Nuclear Power I
19 l
Enclosure cc:
NRC Resident Inspector (w/o/e)
Incident Response Center, Region III uonu w gw: -
9305250244 930517 gp g[g M PDR ADOCK 05000266 F
PDR AsubsWhn dElisan@Emy Gepeatwn f
l lb[
/
i t' /NA 2