ML20044E261

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-271/93-08 on 930314-0417.No Violations Noted
ML20044E261
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/17/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20044E262 List:
References
NUDOCS 9305240116
Download: ML20044E261 (3)


See also: IR 05000271/1993008

Text

_ - _ _ _ _

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

..

bj

'

,

..

O

MAY I T 515

Docket No. 50-271

Mr. Donald Reid

Vice President, Operations

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

'

Dear Mr. Reid:

SURIECT:

VERMONT YANKEE INSPECTION 93-08

This refers to the resident safety inspection conducted by Messrs. H. Eichenholz and

P. Harris on March 14 - April 17,1993, at the Vermont Yankee Nuclear Power Station,

Vernon, Vermont. The preliminary results of the inspection were discussed with

Mr. R. Wanczyk at the conclusion of the inspection. The inspection focused on issues

important to public health and safety and consisted of performance observations, the conduct

of operations and maintenance, and independent verification of safety system status.

We observed that plant management exhibited a high regard for safety in their decision to

shutdown the plant to repair a small leak in the feedwater system. In addition, your decision

to startup the plant following the feedwater system leak and problems in meeting required

scram insertion limits was based on appropria'e safety and management reviews and

resolution of equipment performance issues. Enforcement discretion regarding your failure

to perform a technical specification surveillance on the steam jet air ejector radiation

]

monitors was exercised because of your identification of the event and appropriate corrective

i

actions.

We appreciate your cooperation.

Sincerely,

DrWa3! Signed By:

kmn C. Unville

210004

James C. unville, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: NRC Inspection Report 93-08

]

OFFl01AL RECORD COPY

,i

'

_ - _

-

__

_ _ _ .

_ _ _

..

'.

.

._

.

ENW

Mr. Donald Reid

2

.

cc w/ encl:

R. Wanczyk, Plant Manager

J. Thayer, Vice President, Yankee Atomic Electric Company

L. Tremblay, Senior Limnsing Engineer, Yankee Atomic Electric Company

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

Chief, Safety Unit, Offim of the Attorney General, Commonwealth of Massachusetts

R. Gad, Esquire

G. Bisbee, Esquire

R. Sedano, Vermont Department of Public Service

T. Rapone, Massachusetts Executive Office of Public Safety

Public Document Room (PDR)

Imcal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2 copies)

NRC Resident Inspector

l

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designee

,

l

!

!

i

l

.

l

OFFICIAL RECORD COPY

,

.

.

.

-.

. - _ . _ - - - _ _ _ _ _

l

..

i

-

.

,.

I*

!I E

Mr. Donald Reid

3

l

bec w/ encl:

Region I Docket Room (w/concunences)

i

bec w/enci (VIA E-MAIL):

V. McCree, OEDO

!

D. Dorman, NRR

W. Butler, NRR

-

i

i

i

r

i

t

!

i

.

i

i

l

'

,

i

!

,

!

i

RI:DR [

RI:DRP

RI:DRP

NM

f

i

Eichenholz/meo

Kelly

Li

ille

5/11/93

I/0

f

OFHCIAL RECORD COPY

'A:VY9308.MEO

.

. - . .

. - . - . . .

~ . . .