| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 05/17/1993 |
| From: | Linville J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Reid D VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20044E262 | List: |
| References | |
| NUDOCS 9305240116 | |
| Download: ML20044E261 (3) | |
See also: IR 05000271/1993008
Text
_ - _ _ _ _
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
..
bj
'
,
..
O
MAY I T 515
Docket No. 50-271
Mr. Donald Reid
Vice President, Operations
Vermont Yankee Nuclear Power Corporation
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
'
Dear Mr. Reid:
SURIECT:
VERMONT YANKEE INSPECTION 93-08
This refers to the resident safety inspection conducted by Messrs. H. Eichenholz and
P. Harris on March 14 - April 17,1993, at the Vermont Yankee Nuclear Power Station,
Vernon, Vermont. The preliminary results of the inspection were discussed with
Mr. R. Wanczyk at the conclusion of the inspection. The inspection focused on issues
important to public health and safety and consisted of performance observations, the conduct
of operations and maintenance, and independent verification of safety system status.
We observed that plant management exhibited a high regard for safety in their decision to
shutdown the plant to repair a small leak in the feedwater system. In addition, your decision
to startup the plant following the feedwater system leak and problems in meeting required
scram insertion limits was based on appropria'e safety and management reviews and
resolution of equipment performance issues. Enforcement discretion regarding your failure
to perform a technical specification surveillance on the steam jet air ejector radiation
]
monitors was exercised because of your identification of the event and appropriate corrective
i
actions.
We appreciate your cooperation.
Sincerely,
DrWa3! Signed By:
kmn C. Unville
210004
James C. unville, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure: NRC Inspection Report 93-08
]
OFFl01AL RECORD COPY
,i
'
_ - _
-
__
_ _ _ .
_ _ _
..
'.
.
._
.
ENW
Mr. Donald Reid
2
.
cc w/ encl:
R. Wanczyk, Plant Manager
J. Thayer, Vice President, Yankee Atomic Electric Company
L. Tremblay, Senior Limnsing Engineer, Yankee Atomic Electric Company
J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
Chief, Safety Unit, Offim of the Attorney General, Commonwealth of Massachusetts
R. Gad, Esquire
G. Bisbee, Esquire
R. Sedano, Vermont Department of Public Service
T. Rapone, Massachusetts Executive Office of Public Safety
Public Document Room (PDR)
Imcal Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2 copies)
NRC Resident Inspector
l
State of New Hampshire, SLO Designee
State of Vermont, SLO Designee
Commonwealth of Massachusetts, SLO Designee
,
l
!
!
i
l
.
l
OFFICIAL RECORD COPY
,
.
.
.
-.
. - _ . _ - - - _ _ _ _ _
l
..
i
-
.
,.
I*
!I E
Mr. Donald Reid
3
l
bec w/ encl:
Region I Docket Room (w/concunences)
i
bec w/enci (VIA E-MAIL):
V. McCree, OEDO
!
D. Dorman, NRR
W. Butler, NRR
-
i
i
i
r
i
t
!
i
.
i
i
l
'
,
i
!
,
!
i
RI:DR [
RI:DRP
RI:DRP
NM
f
i
Eichenholz/meo
Kelly
Li
ille
5/11/93
I/0
f
OFHCIAL RECORD COPY
'A:VY9308.MEO
.
. - . .
. - . - . . .
~ . . .