- ML18038A711 +
- ML17262A990 +
- ML17289A855 +
- ML18096B004 +
- ML18096B003 +
- ML20106A472 +
- ML20106A408 +
- ML20106A401 +
- ML20106A288 +
- ML20105C895 +
- ML20105C870 +
- ML20105C015 +
- ML20105B827 +
- ML20105B806 +
- ML20105B798 +
- ML20105B762 +
- ML20105B246 +
- ML20105A571 +
- ML20118B025 +
- ML20118A795 +
- ML20118A713 +
- ML20118A702 +
- ML20118A691 +
- ML20118A689 +
- ML20118A654 +
- ML20118A613 +
- ML20118A570 +
- ML20118A568 +
- ML20126L844 +
- ML20266J765 +
- ML20266J752 +
- ML20266J750 +
- ML20266J748 +
- ML20266J746 +
- ML20266J743 +
- ET-NRC-92-3749, Forwards Proprietary & Nonproprietary Responses to NRC 920529 RAI Related SPES-2 Test Facility as Described in WCAP-13277.Proprietary Responses Withheld (Ref 10CFR9.17(a)(4) +
- ET-NRC-92-3722, Forwards Proprietary Version of Final Design Approval & Design Certification of AP600 & Westinghouse Authorization Ltr & Affidavit for Withholding (Ref 10CFR2.790). Proprietary Portion of Document Sent to Westinghouse +
- ET-NRC-92-3750, Forwards Proprietary Info in Partial Response to 920721 RAI Re AP600 Testing Program.Encl Withheld (Ref 10CFR9.17(a)(4)). Proprietary Portion of Document Sent to Westinghouse +
- ELV-03889, Application for Amends to Licenses NPF-68 & NPF-81,revising TS 4.6.1.6.1.d.2 SR for Containment Tendon Sheathing Filler Grease,To Replace Requirement to Verify Grease Void Fraction W/Requirement to Replace Grease Removed During Tendon Insp +
- 2CAN099207, Forwards Addl Info Re Instrument Error Calculations for Containment Bldg & Pressurizer Pressure Transmitters. Calculations 91-EQ-2002-02,Rev 0 & 92-EQ-0002-01,Rev 0(2) Encl.Info Submitted to Support 920709 TS Change Request +
- RBG-37484, Clarifies 920122 Response to Violations Noted in Insp Rept 50-458/91-27 on 911023-1203.Corrective Actions:Formal Training Course on 10CFR50.59 Evaluation Process Developed +
- 2CAN099201, Responds to NRC 920820 Telcon Request for Util to Upgrade SBLOCA to Reflect Quantitative Evaluation of Spectrum of Break Sizes If Future Mods Made to Facility Which Would Impact Existing SBLOCA Model +
- ML20206U235 +
- ML20203C690 +
- ML20203C682 +
- 05000254/LER-1992-019-02, :on 920815,emergency Load Drop Initiated Due to Unisolable Electrohydraulic Control Unit Fluid Leak, Resulting in Automatic Reactor Scram.Caused by Insufficient Operator Training.Training Will Be Provided +
- 05000458/LER-1992-016, :on 920816,shutdown Cooling Lost When Containment Isolation Valves Isolated While Welding in Progress in RHR B Pump Cubicle.Caused by Loose Terminal Connection.Welding Stopped & Valves Reset +
- 05000458/LER-1992-014, :on 920814,during Review of NRC Info Notice 92-040,discovered That Divs I & II 4.16 IV Buses Not Receiving Surveillance Insps.Caused by Personnel Error. Change Notice Written & Switchgear Tested +
- 05000458/LER-1991-020, :on 911024,discrepancy Discovered Between TS Section 3/4.6.6.3 Re Primary Containment/Drywell Hydrogen Ignition Sys & Applicable Surveillance Test Procedure.Caused by Inadequate Review.Procedures Revised +
- 05000455/LER-1992-005-10, :on 920814,discovered That LCO Action Requirement for Instrumentation,Turbine Overspeed Protection Never Entered During Work on Check Valve on 920813.Caused by Personnel Error.Surveillance Performed +