Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18033B084 +
- ML18033B083 +
- ML18033B082 +
- ML20011D704 +
- ML20011D701 +
- ML20011D703 +
- ML20011D700 +
- ML20011D484 +
- ML20011D483 +
- ML20011D164 +
- ML20005F763 +
- ML20005F757 +
- ML20005E889 +
- ML20005E044 +
- ML20005E048 +
- ML20005D950 +
- ML18153C020 +
- ML19354D735 +
- ML19351A542 +
- NRC-89-0252, Responds to NRC Re Violations Noted in Insp Rept 50-341/89-06.Corrective Actions:Tech Spec 1.36 & 3/4.6.5 Amended to Require Railroad Air Lock Doors Closed & Design Basis Reviews Performed in Three Programs +
- W3P89-2163, Responds to Violations Noted in NRC Enforcement Action 89-192 Re Inoperable Main Steam Line Code Safety Valve. Corrective Actions:Mgt Directive Issued Providing Guidance Re Instrumentation Malfunctions During Surveillance Testing +
- W3P89-2157, Responds to Violations Noted in Insp Rept 50-382/89-32. Corrective Actions:Util Will Continue to Perform Comprehensive Exam of Reactor Vessel Nuts +
- ML19332G002 +
- ML19332F997 +
- ML19332F880 +
- ML19332F873 +
- PY-CEI-NRR-1074, Application for Amend to License NPF-58,changing Tech Spec 4.3.8.2,turbine Control Valve Test Frequency from Weekly to Monthly in Order to Minimize Plant Power Changes +
- ML19332F913 +
- ML19332F662 +
- ML20005E893 +
- BSEP-89-1096, Special Rept 2-SR-89-006:on 891114,reactor Bldg Fire Detection Sys Zone 14 Instrumentation Declared Inoperable Due to Erroneous Fire Alarms.Tech Spec 6.9.2 14-day Time Frame Exceeded.Repairs Expected to Be Completed by 900330 +
- ML20059G538 +
- ML20055H993 +
- ML20055E707 +
- ML20055D444 +
- ML20262G247 +
- ML20042E849 +
- ML20042D685 +
- ML20043C206 +
- IR 05000498/1989042 +
- BECO-89-178, Forwards Response to Generic Ltr 89-21, Request for Info Re Status of Implementation of USI Requirements +
- 05000325/LER-1989-023, :on 891116,reactor Shutdown When Drywell to Suppression Chamber Vacuum Breaker Opened.Caused by Excessive Vibration & Lack of Proper Space Between Actuator Arm & Piston.Procedures Will Be Revised +
- 05000374/LER-1989-017-04, :on 891117,flow Switch FS-2E22-N006 Found W/ Setpoint Out of Tolerance Above Reject Limit.Caused by Setpoint Drift.Work Request Written to Replace Flow Switch +
- BECO-89-174, Forwards Pilgrim Nuclear Plant Station Final Assessment Rept, Summarizing Results of self-assessments & Evaluations Conducted Throughout Implementation of Plant Restart Plan & Power Ascension Program +
- 05000458/LER-1989-039, :on 891114,discovered That Required post-maint Overall Leak Rate Test on Upper Containment Airlock Not Performed After Replacement of Inflatable Seal.Caused by Personnel Error.Maint Procedure Revised +
- IR 05000445/1989082 +
- ML20011D374 +
- ML20011D256 +
- ML20011D916 +
- ML20011D208 +