Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17312A190 +
- ML053070312 +
- ML18153C735 +
- ML18153C734 +
- ML20082U802 +
- ML20082U094 +
- ML20082T501 +
- ML20082T287 +
- ML20082T156 +
- ML20082T115 +
- ML20082T094 +
- ML20082S744 +
- ML20082S426 +
- ML20079E408 +
- ML20205F296 +
- TAC:68640 +
- ELV-03103, Forwards Westinghouse Safety Evaluation Supporting More Negative Eol Moderator Temp Coefficient Tech Spec for Aw Vogtle Nuclear Plant Units 1 & 2, in Ref to Transmitting SE in Support of TS Bases Section B 3/4.1.1.3 +
- 3F0991-05, Provides Notice of Change in Operator Status.M Gallian (Operator License OP-20722) License Should Be Terminated Effective 910830.Operator Permanently Reassigned from Position Necessitating License Certification +
- TAC:M80863 +
- ML20062J146 +
- 05000265/LER-1991-009-03, :on 910817,Tech Spec 3.5.A.6 Entered Due to Core Spray Room Check Valves 2A & 2B Leaking by & Failing Quarterly Surveillance Testing.Caused by Foreign Matl Lodged in Valves.Drain Line Plugs Installed +
- 05000254/LER-1991-011-02, :on 910813,determined That Differential Pressure Could Not Be Maintained During Secondary Containment Capability Test.Caused by Air in-leakage Via Reactor Bldg Roof.Setpoint Changed +
- 05000341/LER-1991-017, :on 910813,valve Discovered Closed When Group 9 Primary Containment Isolation Logic for Valve Inadvertently Energized.Caused by Personnel Error.Required Reading Given to I&C Personnel +
- 05000354/LER-1991-017-01, :on 910815,ESF Actuation Occurred Re High Pressure Coolant Injection Sys.Caused by Equipment Malfunction.Optic Isolator Card Changed at Next Scheduled HPCI Sys Outage +
- ML20082U314 +
- ML20082V282 +
- ML20082U925 +
- ML20036B456 +
- ML20083D149 +
- ELV-03095, Responds to NRC Re Violations Noted in Insp Repts 50-424/91-15 & 50-425/91-15 on 910623-0720.Corrective Actions:Pressurizer Pressure Transmitters Recalibrated & Revised +
- ML20082U360 +
- ML20082V268 +
- ML20082U913 +
- 05000311/LER-1990-020, :on 900512,containment purge/pressure-vacuum Relief Sys Isolation Signal Received from Radiation Monitoring Sys.Caused by Equipment Design Concerns. Uninterruptible Power Supply Installed +
- 05000272/LER-1991-027, :on 910815,two Partial Mode Op I 1A Safeguard Equipment Control Cabinet Signal Actuations Occurred.Caused by Equipment Failure.Chassis Replaced & Failed Cards Sent to Mfg +
- L-91-251, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/91-26 & 50-251/91-26.Corrective Actions:Increased Supervisory Attention to Radioactive Matl Controls Using Supervisor Tour Concept +
- ML17157A854 +
- ML17157A856 +
- ML17174A882 +
- ML17174A884 +
- ML17223B261 +
- IR 05000269/1991024 +
- ML13336A341 +
- ML17223B263 +
- ML13302B425 +
- ML17286B042 +
- ML17348B112 +
- ML17056B394 +
- ML17286B053 +
- ML17324A242 +