VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 12, 1991 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 REQUEST FOR APPROVAL TO USE ASME SECTION XI CODE CASE N-498 Serial No.
NO/ETS/R1 Docket Nos.
License Nos.91-512 50-280 50-281 DPR-32 DPR-37 Surry Power Station Units 1 and 2 are currently in the third period of their second ten year ISi inspection interval.
The* inspection and test program is conducted in accordance with ASME Section XI 1980 Edition, Winter 1980 Addendum, which requires that hydrostatic tests be performed once during the 1 O year interval, at or near the end of the interval. Surry Unit 1 has a scheduled refueling in February 1992 and a portion of the required hydrostatic tests to meet ASME Section XI are scheduled to be completed during this outage.
However, Code Case N-498 provides alternative testing requirements, which would significantly reduce personnel exposure associated with testing as well as reduce the outage time required to perform the testing. This Code Case was recently approved by the Boiler and Pressure Vessel Committee and, as a result, has not yet been included in Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability - ASME Section XI Division 1." Waiting for the NRC generic approval of the Code Case via Regulatory Guide revision would significantly impact and delay current outage planning, equipment requirements, and procedure writing necessary for the February 1992 outage.
Therefore, as directed by footnote 6 to 50.55a for. Code Cases not listed in Regulatory Guide 1.147 and pursuant to 1 O CFR 50.55a(a)(3), your approval of the use of Code Case N-498, "Alternative Requirements for Class 1 and 2 System Hydrostatic Tests During the 1 O Year Interval," is being requested for application during the next Unit 1 refueling outage.
The Code Case N-498 permits alternative testing which will provide an acceptable level of quality and safety for Class 1 and Class 2 systems. Should you have any questions regarding this request or require additional information, please contact us.
r. '7 :L 091 702~,5 91 Q'.':;Tf2 j1*.
PDR ADOCI< 05000280 frtJt/1 I/()
. P
- PDR
e
... (' '
cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station