Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000412/LER-1994-009, :on 940812,unit 2 at 100% Power a RSS Pump Was Inoperable.Caused by Scaling of Flow Transmitters/ Indicators Were Not Matched to Characteristics of Flow Elements + (September 9, 1994)
- 05000443/LER-1994-011, :on 940621,contractor Mechanic Entered High Radiation Area W/O Possessing Alarming Dosimetry.Caused by Failure to Implement Self Checking.Radiation Worker Training Will Be Revised + (September 9, 1994)
- 05000456/LER-1994-012-03, :on 940811,experienced Inadvertent Main Steam Line Isolation at Power Due to Equipment Failure.Failed A516 Ssps Safeguards Output Driver Circuit Board & A315 Universal Logic Circuit Board Replaced + (September 9, 1994)
- ML20196K339 + (September 9, 1994)
- NRC-94-4293, Forwards Rev 2 to Topical Rept WCAP-12600, AP600 Alwr Design QA Program Plan, in Support of Response to NRC RAI 260.33 + (September 9, 1994)
- ML20138M166 + (September 9, 1994)
- ML20072U069 + (September 9, 1994)
- ML20072U076 + (September 9, 1994)
- IR 05000280/1994025 + (September 9, 1994)
- ML18153B078 + (September 9, 1994)
- ML18152A399 + (September 9, 1994)
- 05000397/LER-1994-010, :on 940810,initiated Fire Safe Shutdown Due to Lack of Adequate Analysis of Potential Fire Impact on Min Flow Control Valve Circuitry.Interim C/A Put in Place & Potential Long Term C/A Being Evaluated + (September 9, 1994)
- GO2-94-211, Responds to NRC Re Violation Noted in Insp Rept 50-397/94-24.Corrective Action:Lessons Learned from Event Will Be Incorporated Into Licensed Operator Refresher Training by 940930 + (September 9, 1994)
- GO2-94-213, Informs That Agastat Relay Robbin Failures Was Not Reportable Event Per Requirements of 10CFR21 or 50.73 + (September 9, 1994)
- IR 05000244/1994020 + (September 9, 1994)
- L-94-232, Special Rept:On 940823 & 25,RAB Exhaust Sys WRGM RM-26-90 Declared Out of Svc.Caused by Intermittment Communication Due to Power Supply Regulator Failure.Chemistry Procedure C-93 Implemented & Portable Monitor Installed + (September 9, 1994)
- IR 05000275/1994020 + (September 9, 1994)
- ML17059A461 + (September 9, 1994)
- ML17332A300 + (September 9, 1994)
- ML17059A463 + (September 9, 1994)
- ML18153B066 + (September 9, 1994)
- ML17332A302 + (September 9, 1994)
- ML16141A839 + (September 9, 1994)
- ML18153B072 + (September 9, 1994)
- ML20024J503 + (September 9, 1994)
- ML20072R731 + (September 10, 1994)
- ML20266E845 + (September 11, 1994)
- ML20266D112 + (September 11, 1994)
- ML20265C225 + (September 11, 1994)
- Information Notice 1994-65, Potential Errors in Manual Brachytherapy Dose Calculations Generated Using a Computerized Treatment Planning System + (September 12, 1994)
- Press Release-94-142, NRC Begins Inspection Activities at Paducah and Portsmouth Gaseous Diffusion Plants + (September 12, 1994)
- ML18011A586 + (September 12, 1994)
- ML18011A585 + (September 12, 1994)
- ML18011A584 + (September 12, 1994)
- ML18153B071 + (September 12, 1994)
- ML18153B070 + (September 12, 1994)
- ML20073F554 + (September 12, 1994)
- ML20073F544 + (September 12, 1994)
- ML20073D307 + (September 12, 1994)
- ML20073C767 + (September 12, 1994)
- ML20073B238 + (September 12, 1994)
- ML20073A734 + (September 12, 1994)
- ML20073A728 + (September 12, 1994)
- ML20073A630 + (September 12, 1994)
- ML20073A621 + (September 12, 1994)
- ML20073A609 + (September 12, 1994)
- ML20073A552 + (September 12, 1994)
- ML20073A542 + (September 12, 1994)
- ML20072V376 + (September 12, 1994)
- ML20072V253 + (September 12, 1994)
- ML20072V251 + (September 12, 1994)
- ML20072V211 + (September 12, 1994)
- ML20137L123 + (September 12, 1994)