Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17306B349 +
- 05000528/LER-1993-002, Forwards LER 93-002-00 Re Discovery That Design Basis Fire in Control Room,Concurrent W/Loss of Offsite Power Could Result in Loss of Control Room Power to Train B DG Output Breaker & Essential Exhaust Fan Breaker +
- ML17306B339 +
- ML17310A305 +
- ML20045B376 +
- ML20044E360 +
- ML20044C167 +
- TXX-9312, Forwards RXE-93-003, CPSES Unit 2 Cycle 1 Core Operating Limits Rept +
- ML20044C031 +
- ML20058P640 +
- IR 05000193/1993002 +
- ML20266F226 +
- 0CAN039305, Informs That Position of General Manager,Plant Operations Recently Filled by Mb Sellman.Requests That Mb Sellman Be Added as General Manager,Plant Operations to NRC Correspondence Carbon Copy List for Plant +
- RBG-38227, Forwards Corrected Copy of Dec 1992 Monthly Operating Rept for River Bend Station,Unit 1 +
- ML20044C256 +
- IR 05000313/1993001 +
- BSEP-93-0033, Special Rept SR 2-93-0002:on 930209,reactor Bldg Fire Door 206 Declared Inoperable to Allow Equipment Cables & Lighting to Be Run Through Door.Compensatory Measures Remained in Effect Until Door Restored on 930223 +
- IR 05000498/1992001 +
- ML20044C558 +
- ML20035E822 +
- 05000259/LER-1993-002-02, :on 930212,DG D auto-started on Undervoltage Following Unexpected Trip of Shutdown Bus 2,opening Bus 2 Alternate Feeder Breaker & Deenergizing Bus 2.Caused by Inadequate Procedure.Preventive Maint Procedure Revised +
- IR 05000373/1993002 +
- ML20034H479 +
- 05000282/LER-1993-004, :on 930209,discovered That ASME Section XI ISI Exams Performed W/Incorrect Calibr Blocks.Caused by Personnel Error.Isi NDE Procedures & Plans Will Be Revised to Assure Acceptable Calibr Block Used +
- ML20034H475 +
- IR 05000373/1993008 +
- 05000353/LER-1993-003-01, :on 930213,inadvertent Div 2 LOCA Signal Initiated During Surveillance Test.Caused by Personnel error.On-job Training Moduel Expected to Be Implemented by 930401 +
- ML20034H314 +
- ML20034H317 +
- 05000344/LER-1993-002, :on 930209,discovered That Seals for Fire Barrier Penetrations Did Not Meet 3-hour Fire Barrier Ratings.Caused by Error Made During Penetration Identification.Fire Patrol Established +
- 05000267/LER-1993-002, :on 930210,plant Placed in Unanalyzed Condition When Reactor Bldg Crane Detached from Fuel Handling Machine. Caused by Misinterpretation of Applicable Procedural Requirements.Procedure Revised +
- B14400, Provides Basis for Conclusion Re Operability of Alternate Min Flow Sys for Charging Pump,Per 930107 Meeting W/Nrc +
- B14399, Responds to Request for Addl Info Re Insp Rept 50-336/92-22, Concerning Chronology of Knowledge on Pressurizer PORV Operating Characteristics +
- IR 05000461/1993004 +
- IR 05000462/1993004 +
- IR 05000254/1993006 +
- ML20034H559 +
- ML20035A704 +
- ML20035A047 +
- RBG-38-222, Forwards Copy of Authorization of Board of Directors of Gulf States Utilities Co for Je Booker,Manager - Safety Assessment & Quality Verification,To Sign Ltrs to NRC Transmitting Amends to OL or Response to Any NRC Insp Rept +
- PNO-III-93-015A, on 930228,licensee Determined That C-14 Contamination of Cyclotron Bldg Originated w/C-14 Target Handled by Visiting Researcher.Radioactive Contamination to Researcher Paperwork,Shoes & Car Seat Were Up to 40,000 DPM +
- ML20034H740 +
- ST-HL-AE-4354, Responds to NRC Re Violations Noted in Insp Repts 50-498/93-01 & 50-499/93-01.Corrective Actions:Nuclear Training Dept Conducted Training for Supervisors to Reinforce Procedural Compliance +
- ML20012G774 +
- ML20034H303 +
- ML20035B100 +
- ML20045F577 +
- ML20034H218 +
- RBG-38-223, Responds to NRC Bulletin 90-001,Suppl 1, Loss of Fill Oil in Transmitters Mfg by Rosemount. All Model 1153 & 1154 Transmitters in Plant Spare Parts Inventory Upgraded to Only Include New Style Sensing Modules +
- ML20012G773 +