ACCEI.ERATO@ DOCUlVIENTDIST UTION SYSTEM REGULATO~INFORMATION DISTRIBUTION TEM (RIDS) 4t ACCESSION NBR:9303220286 DOC.DATE: 93/03/ll NOTARIZED: NO
'OCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
I
SUBJECT:
Provides addi info requested by NRC during telcon on 930303, in support of relief request from ASME code re hydrostatic pressure test requirements involving steam generators.
DISTRIBUTION CODE:
R047D COPIES RECEIVED:LTR
(
ENCL 0 SIZE:
TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code D
NOTES:STANDARDIZED 'PLANT Standardized plant.
Standardized plant.
.05000528 A
05000529 05000530 D
RECIPIENT ID CODE/NAME PD5 LA TRAMMELLgC INTERNAL: ACRS NUDOCS-ABSTRACT OGC/HDS1 RES MILLMAN,G EXTERNAL'G&G BROWN P B NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD5 PD TRAN,L NRR/DE/EMEB REG FILE 01
/'
EIB EG&G RANSOME,C NSIC COPIES LTTR ENCL A
NOTE TO ALL"RIDS" RECIPIENTS:
I'LEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMEN'I'ONTROLDESk, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 23 ENCL
i
~
It C,
~ ~
I*
I t
I>>
Arizona Public Service Company P,O. BOX 53999
~
PHOENIX, ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 102-02446-WFC/JRP March 11, 1993 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-37 Washington, D. C. 20555
Reference:
Letter 102-02368, dated December 10, 1992, from W. F. Conway, Executive Vice President, Nuclear, APS, to the USNRC "Relief Request from ASME,Section XI Hydrostatic Pressure Test Requirements"
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Response to Request for Additional Information Concerning Relief Request from ASME,Section XI Hydrostatic Pressure Test Requirements
'ile: 93-056-026 The purpose of this letter is to provide the additional information requested by the NRC during a telephone conference call with Arizona Public Service Company (APS) on March 3, 1993. The additional information is in support of the referenced relief request for relief from American Society of Mechanical Engineers (ASME),Section XI, hydrostatic pressure test requirements involving Steam Generators (SG) ~ The reliefwould allowthe hydrostatic pressure test to consist of an In-Service Leak Test (ISLT) at normal secondary operating pressure in Mode 3, as opposed to the 1.25 times design pressure test currently required for Class 2 components.
The relief is necessary to allow the installation of two, seven-inch diameter SG secondary side handholes.
The handholes will provide access to the secondary tube bundle and tubesheet for the removal of loose parts, the performance of tubesheet inspections, and sludge lancing.
The preliminary work for the handhole installation is scheduled to begin on March 24, 1993.
Therefore, APS requests NRC approval of the relief request by March 22, 1993.
Additional information 1.
Prior to beginning the handhole modification, the area of the weld build-up pad for the handhole and a 20 inch radius from the center of the pad area will be ultrasonically examined to the following acceptance criteria.
'L 220119 9303220286 9303ii PDR ADOCK 05000528 PDR
4
,v I
I
~ g
P U.S. Nuclear Regulatory Commission AKIN: Document Control Desk Hydrostatic Pressure Test Requirements Page 2 A.
Any area, where one or more discontinuities produce a
continuous total loss of back reflection accompanied by continuous indications on the same plane that can not be encompassed within a circle whose diameter is 3 inches or 1/2 of the plate thickness, whichever is
- greater, is unacceptable.
B.
In addition, two or more defects smaller than described in A above shall be unacceptable unless separated by a minimum distance equal to the greatest diameter of the larger defect or unless they may be collectively encompassed by the circle described in A.
2..lfthe inspection of Item 1, results in relevant indications that are outside of the acceptance criteria of Item 1, APS will advise the NRC.
3.
During the next two refueling outages, subsequent to installation of the SG handhole, each handhole will be liquid penetrant examined ifthe handhole cover is removed.
It is expected that the handhole cover will be removed for Foreign Object Search and Retrieval (FOSAR) and sludge lancing activities during these outages.
However, due to potential corrosion issues associated with dry layup conditions, the handhole covers should not be removed for the examination only, but rather concurrently with planned SG secondary side activities.
During the conference call with the NRC Staff, APS committed to visually inspect the handhole bore.
Due to the lack of specific flaw acceptance standards in ASME B&PV Code,Section XI, for visual examination of pressure boundary material, APS proposes a liquid penetrant examination be performed.
Acceptance standards will be in accordance with the PVNGS Section XI inspection program.
4.
During the design phase of the SG handhole installation project, a complete demonstration of the modification was performed on a spare economizer SG in the vendor's facility'in Chattanooga, TN.
The purpose of the demonstration was to test and refine the installation technique prior to
. performing the modification in the plant.
The demonstration included the non-destructive examination testing, the weld pad build up, machining of the stud holes, machining of the handhole bore and Electrode-Discharge Machine of the handhole bore.
l' I
jl
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hydrostatic Pressure Test Requirements Page 3 Should you have any questions, please call Thomas R. Bradish at (602) 393-5421.
Sincerely, WFC/JRP/rv cc:
J. B. Martin J. A. Sloan C. M. Trammell
0 4
~
t il, k
hl