Forwards Insp Rept 50-458/93-01 on 930222-26.Violations Noted.Areas Examined Included Implementation of Emergency Plan & Procedures During Annual Emergency Exercise
ML20034H317
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/11/1993
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Graham P
GULF STATES UTILITIES CO.
Shared Package
ML20034H318 List:
References
NUDOCS 9303170111
Download: ML20034H317 (5)


See also: IR 05000458/1993001

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

UNITE D STATES

po.MGug

t

g,

4-

NUCLEAR REGULATORY COMMISSION

R EGION IV

$

o

611 RYAN PLAZA DRIVE, SUfTE 400

o

ARLINGTON, T E XAS 760114064

MAR 1 1 1993

l

Docket: 50-458

License: NPF-47

i

Gulf States Utilities

ATTN:

P. D. Graham

i

Vice President (RBNG)

P.O. Box 220

l

St. Francisville, Louisiana 70775

SUBJECT: NRC INSPECTION 50-458/93-01

This refers to the inspection conducted by Dr

D. Blair Spitzberg, and other

members of an NRC team during the period February 22-26, 1993. The inspection

included a review of activities authorized for your River Bend Station

facility. At the conclusion of the inspection, the findings were discussed

with Mr. P. Graham, Vice President, Gulf States Utilities and members of (our

staff identified in the enclosed report.

Areas examined included the implementation of your emergency plan and

procedures during your annual emergency exercise. Within these areas, the

inspection consisted of selective examination of procedures and representatin

records, interviews with personnel, and observations by the inspectors. The

inspection findings are documented in the enclosed inspection report.

Four exercise weaknesses were identified during the inspection. One weakness

discussed in Section 3.1 of the enclosed inspection report related to accident

mitigation following a radiological release.

A weakness discussed in

Section 4.1 was identified for failure to obtain and analyze a post accident

sample in a timely manner. An associated weakness, also discussed in

Section 4.1, concerned weak planning and radiological controls demonstrated

during the acquisition of the postaccident sample. The fourth weakness is

discussed in Section 5.1 and relates to untimely and confusing information

conveyed in notification messages.

Except for those areas affected by the

weakresses, your emergency response organization demonstrated effective

implementation of your emergency plan.

Exercise weaknesses according to 10 CFR Part 50, Appendix E.IV.F.5, are

inspection findings that need to be corrected by the licensee.

You are

requested to provide this office with a description of your corrective

measures and your schedule for completing these actions within 30 days after

receipt of this letter.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

160039

g635

9303170111 930311

PDR

G

ADOCK 05000458

PDR

h

. - .

-

..

.

)

l

i

.

l

'

.

T

Gulf States Utilities

-2-

r

Should you have any questions concerning this inspection, we will be_ pleased

i

to discuss them with you,

)

Sincerely,

l

1

I

a _-

l

L. J.

a a , Director

Divis on of Radiation Safety and

t

Safeguards

'

1

Enclosure.

Appendix - NRC Inspection Report

50-458/93-01

'!

!

cc w/ enclosure:

,

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

Nuclear Industry Relations

P.O. Box 2951

l

Beaumont, Texas 77704

,

Winston & Strawn

ATTN: Mark J. Wetterhahn, Esq.

'

1401 L Street, N.W.

Washington, D.C.

20005-3502

l

Gulf States Utilities

'

ATTN:

Les England, Director

Nuclear Licensing

P.O. Box 220

L

St. Francisville, Louisiana 70775

t

';

Mr. J. David McNeill, III

!

William G. Davis, Esq.

!

Department of Justice

l

Attorney General's Office

P.O. Box 94095

,

Baton Rouge, Louisiana 70804-9095

j

H. Anne Plettinger

i

3456 Villa Rose Drive

!

'

Baton Rouge, Louisiana 70806

President of West Feliciana

!

I

Police Jury

P.O. Box 1921

l

St. Francisville, Louisiana 70775

i

i

i

.

-~

$

-,

-

-

",

-

_______ _ _ _ _ _ _ _ _

.

-.

'

.

-

f. .

Gulf States Utilities

-3-

'

Cajun Electric Power Coop. Inc.

ATTN: Philip G. Harris

10719 Airline Highway

P.O. Box 15540

Baton Rouge, Louisiana 70895

Hall Bohlinger, Administrator

Radiation Protection Division

P.O.. Box 82135

'

Baton Rouge, Louisiana 70884-2135

Chief, Technological Hazards Branch

FEMA Region 6

1

Federal Center

800 North Loop 288

Denton, Texas 76201-3698

I

i

l

!

_


- - .

k

,,

,

i

n

.

!

.

d

' Gulf: States Utilities

-4-

bEcli.'olDMB,"(IE35)}

bec distrib, by RIV:

l

t

.J. L. Milhoan

j

B. Murray, DRSS/FIPS

'

W. L. Holley, FIPS

D. B. Spitzberg, FIPS

'l

L.~Wilborn, FIPS

]

DRP

a

Section Chief, DRP/C

1

Project Engineer, DRP/C

!

l

Section Chief, DRP/TSS

DRS

i

Resident Inspector (2) - River Bend

i

Senior Resident Inspector - Cooper

i

'

Senior Resident Inspector - Fort Calhoun

MIS System

DRSS/FIPS File

,

RIV File

!

Lisa Shea, RM/ALF, MS: MNBB 4503

!

~. Baker, NRR Project Manager (MS 13 HI5)

j

C. A. Hackney, RSLO

l

-

!

' I

.. ;

!

l

i

!

l

!

I

i

i

-_

i

RIV:FIPS p ./

FIPS

FIPS

-

PE/C:DJtP

C:FIP h

i

. . _

n

- rev

n;-

w

.-w

c

DBSpitzberg:hh-

WLHolley

LWilborn-

Ecollins

BMurray rv ,.

t

3 / 5 /93

7/[/93-

3 / 5 /93-

3/I/93

~5/7/93'

DD:DRSS M M

(kSN

. i

DRP'

LJCallan f

DDChamberlain-'

ABBeach

'

, 3 //o/93

3 /lf /93

3 /// /93

1

i

.-

l

~

,e

. , .

J

.

,

1i

,

&

..

_

-

. _ .

_

__

_ . . .

. ,

,

,

q

-

<

'

'

. a.

,

-

!

_

j

-

, Gulf States Utilities-

-4-

j

L

.

bec to DMB~(IE35)

3

bec distrib. by RIV:'

i

J. L. Milhoan

.,

'

B. Murray, DRSS/FIPS-

W. L. Holley, FIPS

i

D. B. Spitzberg, FIPS

L. Wilborn, FIPS

.;

DRP

g

'

Section Chief, DRP/C

Project Engineer, DRP/C

Section Chief, DRP/TSS

DRS

Resident Inspector (2) - River Bend

'!.

[

Senior Resident Inspector - Cooper

i

Senior Resident Inspector - Fort Calhoun

l

MIS System

'

DRSS/FIPS File

RIV File-

l

'Lisa Shea. RM/ALF, MS: MNBB 4503

E. Baker', NRR Project Manager (MS 13 H15)

!

C. A. Hackney, RSLO-

~

!

!

.

-

.

.

i

j

t

.i

!

1

'i

.

!

t

.

!

2

i

RIV:FIPS p

)

FIPS

FIPS

PE/C:pptP

C:FIPS h

, . .

,

. w rw

n;

w

.re

c,

DBSpitzberg:hh

WLHolley

LWilborn

ECollins

BMurray V

'

3 / 5 /93-

)/[/93

3 / 5 /93

3/I/93

~5/7/93

.,

t

DRP

-(kSM

_

DD:DRSS M N

bDChamberlain

ABBeach

LJCallan h

1

t

'

.

-

3lio/93-

1/lf /93

3////93

L

q

,

_

~

q

>

_

..

-;

,

.

- - . .

.,