Forwards Insp Repts 50-317/93-06 & 50-318/93-06 on 930301-05.No Violations Noted
ML20035A047
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/11/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Denton R
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20035A048 List:
References
NUDOCS 9303240004
Download: ML20035A047 (3)


See also: IR 05000317/1993006

Text

"g

-.

9

UAR 11 1993

Docket Nos. 50-317

50-318

Mr. Robert E. Denton

Vice President - Nuclear Energy

Baltimore Gas and Electric Company

.

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, Maryland 20657 - 4702

Dear Mr. Denton:

,

!

SUBJECT:

NRC Combined Inspection Nos. 50-317/93-06; 50-318/93-06

?

An announced safety inspection of the radiation protection program at your facility was

conducted by Messrs. J. Furia and L. Eckert of this office on March 1-5,1993. The

i

inspection findings were discussed with members of your staff at the conclusion of the

inspection on March 5,1993.

Areas examined during this inspection are important to health and safety and included the

'

radiation protection program. Areas inspected included your programs for: radiation safety

during normal and outage operations, radiological work control and housekeeping,

maintaining radiation exposures as low as reasonably achievable (ALARA), and assurance of

quality. Within these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the inspector.

Strong performance in the areas of radiological work control and dosimetry were noted.

ALARA deficiencies identified in previous insocctions have been addmssed by your staff,

however, the success of these corrective actions will be fully evaluated after the Unit 2

refueling outage has been completed.

i

9303240004 930311

PDR

ADDCK 05000317

G

PDR

OFFICIAL RECORD COPY

p tm

r: n

l

m

t

)

l

.

- L

,.; a

(

-

-

-

-

-

-

-

-

-

,-

4

l/AR 11 1993

.

Baltimore Gas and -

2

Electric Company

No response to this letter is required. Your cooperation with us in this matter is appreciated.

Sincerely,

Ori int.t Signed By;

0

James H. Joyner

James H. Joyner, Chief

Facilities Radiological Safety

'

and Safeguards Branch

Division of Radiation Safety

'

and Safeguards

Enclosure: NRC Region I Combined Inspection Report Nos. 50-317/93 4 ; 50-318/93-06

'

cc w/encis:

G. Detter, Director, Nuclear Regulatory Matters (CCNPP)

R. McLean, Administrator, Nuclear Evaluations

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

R. Ochs, Maryland Safe Energy Coalition

K. Abraham, PAO (2)

i

Public Document Room (PDR)

,

Iscal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

i

[

,

.

1

OFFICIAL RECORD COPY

E V.

l .:g.P'

ri

u

n

azs

c>

.

E:

-

'

,

e

'

llkR 11 1993 -

Baltimore Gas and

3

Electric Company

l

bec w/encls:

Region I Docket Room (with concurrences)

C. Cowgill, DRP

J. Yerokun, DRP

L. Nicholson, DRP

S. Greenlee, DRP

P. Wilson, SRI - Calvert Cliffs

[

V. McCree, OEDO

R. Capra, NRR

,

D. Mcdonald, NRR

DRS/EB SALP Coordinator

D. Holody, EO

,

k

i

RI:DRSS

RI D SS

DRSS

QW

/

W

JFuria

iak

'o) :r

3/6/93

3/[/93

3////93

w

no

s

nm

ju.!'*"

vv>

OfflCIAL RECORD COPY

'