Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17325B318 +
- ML17325B317 +
- ML17325B316 +
- ML18153B980 +
- ML18153B976 +
- ML18153B975 +
- ML18153B974 +
- ML19354D525 +
- ML19332F331 +
- ML19332D506 +
- ML19332D475 +
- ML19332D126 +
- ML19332C671 +
- ML19332C670 +
- ML19332B946 +
- ML100331155 +
- ML19332B934 +
- ML19327C203 +
- ML19327C127 +
- ML19327C126 +
- ML19327C125 +
- ML19325F348 +
- ML19325F347 +
- ML19325F346 +
- ML19325F318 +
- SNRC-1658, Responds to T Murley Re 10CFR2.206 Petitions. Requests in Shoreham-Wading River School District & Scientists & Engineers for Secure Energy & Long Island Assn Petitions for Return to Status Quo Ante Should Be Denied +
- ML19324C400 +
- ML19324C151 +
- ML19332F389 +
- ML19332B901 +
- ML19327B847 +
- ML20261K536 +
- ML20260K977 +
- ML20260K961 +
- ML20260K912 +
- ML20012D363 +
- ML20043C140 +
- BVY-89-113, Application for Amend to License DPR-28,consisting of Proposed Change 152,revising Reactor Vessel pressure-temp Curves in Tech Spec 3.6, RCS Per Generic Ltr 88-11 +
- ML19353A966 +
- ML19354D675 +
- PY-CEI-NRR-1091, Confirms That Util Included Actions in Plant Safeguard Contingency Plan & Procedures to Protect Against Attempted Radiological Sabotage Involving Land Vehicle Bomb If Threat Materializes,Per Generic Ltr 89-07 +
- ML19332D662 +
- 3F1189-09, Discusses Status of Security Program Improvements.Listed Addl Improvements Planned But May Be Subj to Changes If More Appropriate Way of Improving Sys Identified.Sys Presently Scheduled to Be Operational by End of Refuel 8 +
- ML19327C191 +
- 05000302/LER-1989-033, :on 890908,second Level Undervoltage Relay Sys Setpoint for Engineered Safeguards Buses Not Conservative & Led to Operation Outside Plant Design Basis.Caused by Personnel Error.Setpoint Changed +
- 05000318/LER-1989-002, :on 890228,discovered That Fire Barrier Penetration Inoperable & Action Statement Requirements Not Satisfied.Caused by Inadequate Administrative Controls. Penetration Returned to Operable Status +
- 05000443/LER-1989-012, :on 891011,one of Two Suction Valves on RHR Train a Pump Closed,Causing Loss of All RHR Cooling Capability.Caused by Procedure Inadequacies.Procedure Revised to Specify Sequence of Restoration +
- AECM-89-0186, Forwards Executed Amend 3 to Indemnity Agreement B-72 +
- BECO-89-166, Responds to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded-Case Circuit Breakers. Util Installed H2/02 Analyzers Procured in 1980 & Therefore Exempt from Bulletin Requirements +
- ML19325F345 +